Quality & InspectionFree templatePDF, Excel, Word exportMedical Devices

ISO 13485 Quality Plan Template

This ISO 13485 quality plan template gives you a plan for one device or family, a medical device file contents example and a clause compliance checklist, all in a single exportable document. Fill in the fields and download it as Word or PDF.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

ISO 13485 Quality Plan Template with Medical Device File Example

Quality Plan

Meridian Medical Components Inc Product: Single-use laparoscopic grasper, model LG-5 Classification: Class II Document: QPL-LG5-001 Rev A Markets: USA (FDA 510(k)), EU (MDR), Canada (MDSAP) Owner: Quality engineer

1. Scope and quality objectives

This plan defines the processes, resources, records and checks required to realize Single-use laparoscopic grasper, model LG-5 in line with the quality management system. Objectives: Meet all design inputs and verify with documented evidence. First-pass yield at final inspection of at least 98 percent. No open critical supplier nonconformances at release.

2. Risk management

Risk management per ISO 14971 is run through the life cycle. Hazard analysis, FMEA and a risk management report are updated at each design review and at any change.

3. Product realization plan

StageKey activitiesOutput / recordResponsiblePlanned date
Design and development planningPlan, inputs, rolesDesign plan
Design inputs and outputsRequirements, specificationsDesign input and output records
Design verification and validationTest protocols and reportsV&V reports, usability file
PurchasingSupplier selection and evaluationApproved supplier list, quality agreements
Production and process controlProcess validation, work instructionsIQ/OQ/PQ reports, routings
Cleaning, sterilization, packagingValidated cyclesValidation reports, labeling records
Final inspection and releaseAcceptance criteriaDevice history record
Post-market surveillanceComplaints, vigilanceComplaint files, trend reports

4. Medical device file contents example

SectionContentReference documentStatus
General descriptionIntended use, indications, user, device descriptionDD-LG5-001Complete
LabelingLabel, instructions for use, packagingLB-LG5-010Complete
Product specificationsDrawings, bill of materials, performance requirementsDR-LG5-100Complete
Manufacturing specificationsProcess flow, work instructions, in-process and final acceptanceMP-LG5-200In progress
Purchasing and supplierSpecifications and quality agreements for key componentsPU-LG5-030In progress
Measuring and monitoringTest methods, gauge control, sampling plansTM-LG5-040Open
Installation and servicingWhere applicable, procedures and acceptanceN/A single-useNot applicable
Risk management fileRisk plan, analysis and reportRM-LG5-001In progress
Verification and validationProtocols, reports and traceability to inputsVV-LG5-001Open

5. Compliance checklist

CheckClause areaEvidenceMet (Y/N)
Quality plan approved before design release7.1 Planning of product realizationThis document
Regulatory requirements identified for each market4.1.1 and 7.2.1Regulatory strategy
Design controls records complete7.3Design history file
Suppliers evaluated and monitored7.4Approved supplier list
Production processes validated7.5.6Validation reports
Traceability and identification defined7.5.8 and 7.5.9Traceability procedure
Nonconforming product controlled8.3NCR procedure and log
Complaint and feedback process active8.2.1 and 8.2.2Complaint procedure
CAPA system effective8.5.2 and 8.5.3CAPA log

Approvals

Prepared by / Date
Quality manager / Date
Regulatory affairs / Date
Engineering lead / Date

Starting template only. Requirements differ by device class, market and regulation (for example FDA 21 CFR 820, EU MDR, MDSAP). Clause references follow ISO 13485:2016 structure but you must confirm them against your own copy of the standard. The medical device file replaces the older device master record concept in many systems, but FDA terminology may still apply to your US submissions.

Medical device file gap check

Optional: we can map your device records across ERP and document stores and list missing items.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Start with the device, classification and markets, since these drive the evidence you will need. Then write objectives that can be measured. Walk the product realization table row by row and assign an owner and a date to every stage. Use the medical device file table as an index to documents that live in your document control system rather than copying content into this plan. Finally, tick the checklist at each design review so gaps are visible early.

  • One plan per device or family, not per site
  • Link to controlled documents instead of pasting them
  • Review at every design gate and after any change
  • Keep superseded versions per your retention rules

What ISO 13485 asks for

Clause 7.1 requires you to plan and develop the processes needed for product realization, including quality objectives, resources, verification, validation, monitoring, inspection and test activities, and the records needed. Clause 4.2.3 requires a medical device file for each type or model, describing the device and all documents on its specification and manufacturing, packaging, labeling, procedures and, where relevant, installation and servicing. The plan above pulls these two requirements into one document.

Reading the checklist

Treat each row as a question you must answer with evidence. A row that is marked N needs an action, an owner and a date. Do not mark a clause as met because a procedure exists: auditors look for records that show the procedure was followed on this device. If a requirement does not apply, such as servicing for a single-use device, record the justification rather than leaving the row blank.

Common mistakes

Plans that restate the quality manual, no link between risk management and design inputs, supplier controls that stop at an approved list, and medical device files that exist only as a folder with no index. Another is writing the plan after design is complete. It should exist before design work starts and be updated as the project learns.

Frequently Asked Questions

Is a quality plan required by ISO 13485?

ISO 13485 requires planning of product realization and documented evidence of it, and many organizations meet this with a quality plan per device or project. The format is yours to define as long as it covers objectives, processes, resources, activities and records.

What goes in a medical device file?

A general description, intended use, labeling, product specifications, manufacturing and packaging specifications, procedures for purchasing, measuring and monitoring, installation and servicing where applicable, and risk management records. It can be an index that points to controlled documents.

How does the medical device file relate to the DHF and DMR?

ISO 13485 uses the medical device file. In the US, FDA rules use the design history file, device master record and device history record. Many companies keep one structure and map the content to each term for audits.

When should the quality plan be updated?

At each design review, after any significant design, process or supplier change, and when regulatory requirements change. Keep revision history so an auditor can see how planning evolved over the project.

If your device records live across ERP, document stores and spreadsheets, we can put a private AI layer on your own servers to answer which records exist for a device and what is missing.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs