Industry TemplatesFree templatePDF, Excel, Word exportMetal Buildings and Fabrication

Metal Building Quote Template and Request Form

This metal building quote template gives estimators a clean, consistent proposal: building description, design loads, priced lines for the package, accessories, freight and erection, plus the assumptions and exclusions that protect margin. Fill in the fields and export to PDF or Word.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Metal Building Quote Template

Metal Building Quotation

Summit Metal Buildings LLC Quote no: MB-2026-0147 Date: 2026-10-21 Valid for 30 days

Prepared for: Hartwell Logistics Inc. Job site: 1200 Industrial Pkwy, Tulsa, OK

Building description

Type: Clear span rigid frame Size (W x L x eave): 60 ft x 100 ft x 16 ft Roof pitch: 1:12

Design loads: Roof live 20 psf, ground snow 10 psf, wind 115 mph Exposure C, per local code and engineer of record.

Pricing

ItemBasisPrice
Building packagePrimary and secondary framing, roof and wall panels, trim86400
Doors, windows, insulation, accessoriesAs listed on the attached schedule14200
FreightDelivered to site, unloading by others6800
ErectionLabor, crane and lift equipment, fasteners38500
Total (excluding items below)Sum of lines above

Scope and assumptions

Foundation and site work by: Customer Permits and engineering: Stamped drawings included; permit fees by customer. Lead time: 10 to 12 weeks

Price assumes level, accessible site and open truck access. Steel surcharges are adjusted at order release.

Exclusions

Concrete, anchor bolt setting, utilities, interior finish, sales tax, bonds, rock excavation.

Payment terms

30% with order, 60% before shipment, 10% on completion

Acceptance

Customer authorized signature / Date
Date / Date
Estimator / Date

Use the same fields as a quote request form: send the building type, size, loads, site and exclusions blocks to a customer and ask them to confirm. Add the four price lines yourself to get the total. This is a starting point, not legal advice; have your counsel review terms.

Draft quotes from your past jobs, privately

Optional: see how a private AI layer on your ERP can draft quotes from similar completed jobs.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the quote template

Start with the customer and site, then enter the building size as width x length x eave height and the design loads from the local code or the engineer of record. Fill the four price fields, review the assumption fields, and export. The same document works as a quote request form if you send only the description blocks to a customer and ask them to confirm size, site access and who handles the foundation.

  • Enter loads from the jurisdiction, never a generic default
  • Quote freight separately so fuel and distance changes are visible
  • State who owns the foundation and anchor bolts
  • Set a validity period because steel pricing moves

Sample pricing logic behind a metal building quote

Most pre-engineered quotes are built from a package price (often quoted per square foot of floor area from the manufacturer), plus accessories, freight, erection and your margin. As a sample, a 60 x 100 ft building is 6,000 sq ft; a package near 14 dollars per sq ft gives roughly 84,000 dollars before accessories. Erection is commonly priced per sq ft or by crew days. Ranges vary widely by region, steel markets and load requirements, so use your own supplier quotes, not generic numbers.

What a defensible metal building quote must state

Disputes on metal buildings almost always come from scope gaps. The template forces the items that matter: design loads and code basis, who supplies engineering and permits, foundation responsibility, delivery terms, erection assumptions such as site access, and a clear exclusions list. Add steel price validity and a surcharge clause so a price movement between quote and order release does not erase your margin.

  • Concrete, anchor bolts and site grading
  • Utilities, insulation vapor barriers and interior finish
  • Sales tax, bonds and permit fees
  • Change orders for unforeseen soil or access conditions

Common mistakes and keeping quotes in your ERP

Estimators commonly forget crane or lift rental, overweight freight permits and trim or fastener packages. Review the estimate against a checklist before you send it. Keep the issued quote in the ERP linked to the opportunity so win rate by building type and margin by size can be reported later. Teams running on-prem ERP often want a private AI that drafts quotes from past jobs without sending drawings to a public cloud service.

Frequently Asked Questions

Is there a metal building quote calculator?

This page is a quote template: you enter the package, accessories, freight and erection prices from your supplier and crew estimates and it produces the document. For sizing, multiply width by length for floor area and compare your package price per square foot with supplier quotes.

What should a metal building quote request form include?

Building type, width, length and eave height, roof pitch, design loads or location, door and window needs, site address and access, foundation responsibility, desired delivery date and whether erection is required. The more complete the request, the fewer revised quotes you need.

How long should a metal building quote stay valid?

Many fabricators use 15 to 30 days because steel prices and manufacturer package pricing change. State a surcharge or repricing clause if the order release date moves, and confirm validity matches your supplier's quote.

Does the template calculate the total?

The template is a document generator, so you type the four price lines and add them for the total line. For automated totals and margin, use a worksheet or your ERP quoting module.

If your quotes still start from last year's spreadsheet, Netray can add a private AI layer to your ERP that drafts quotes from similar past jobs and keeps your data on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP