Welding and Fabrication Quote Proposal Template

A good fabrication quote does more than state a price. It names the drawing revision, the weld code, the inspection level, the finish and the exclusions, so a later change order has something to refer to. This template covers those items on one page.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Welding and Fabrication Quote Proposal Template

Quotation Q-24-1187

From: Ridgeline Fabrication Inc. To: Midwest Equipment Co., attention Purchasing Manager Date: 2026-10-20 Valid for 30 days from the date above.

Scope of work

Fabricate and weld 25 equipment frames per drawing EF-2200 Rev C from A36 plate and HSS, including fit-up, welding, grinding of exposed welds and shipping preparation.

Standards and inspection

Welding to AWS D1.1. Inspection included: Visual only. Welds will be performed by qualified welders using qualified or prequalified procedures as required by the governing code. Material certificates provided on request.

Pricing

ItemDescriptionQtyUnit price
1Welded fabrication per scope above, finish: Prime paint25$1,840.00
2Tooling and fixtures (if any)1Quoted separately
3Welding procedure qualification (if required)1Quoted separately

Delivery and terms

Lead time: 8 weeks after receipt of order and approved drawings. Payment terms: Net 30. Prices are based on current material cost and are valid for the period stated. Material price changes beyond that period may require a revised quote.

Exclusions and assumptions

Engineering and detailing, material testing beyond mill certificates, third party inspection, installation, and taxes.

This quote assumes the drawings and revision named in the scope, no changes to weld size or inspection level, and customer approval of the first article before production.

Acceptance

Prepared by (supplier) / Date
Accepted by (customer) / Date

This template is a starting point, not legal advice. Have your counsel review payment, liability, warranty and tooling ownership terms, and attach your standard terms and conditions to the quote.

Automate quotes from your ERP

Optional review of generating quotes from routings, material history and job costing in your own ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Fill in the fields at the top, including drawing revision in the job description, the governing code and inspection level. The preview updates as you type. Export to PDF to send or to Word to adjust wording. Replace the sample price and lead time with your estimate from the cost calculator or worksheet.

What each section is for

Scope of work defines what is priced. Standards and inspection records the code and NDE level, which are the most common sources of disputes. Pricing separates unit price from tooling and qualification costs. Delivery and terms set lead time and payment. Exclusions and assumptions protect you from unpriced additions.

  • Always cite the drawing number and revision
  • State what inspection is and is not included
  • List exclusions explicitly rather than staying silent

Making it fit your shop

Add a line for material surcharge language if you buy steel on a long release. Add outside processing lines for galvanizing or plating when those vendors set lead time. For regulated work, add the quality clauses from the purchase order, such as flow downs, counterfeit part prevention or records retention.

Frequently Asked Questions

How long should a quote stay valid?

Thirty days is common for fabricated work, shorter when steel prices are volatile. Match validity to your supplier price validity, and state material price assumptions in the terms.

Should I show a unit price or a lump sum?

Unit price is clearer for repeat parts and release schedules. Use a lump sum for one-off structures, and break out engineering, tooling and qualification as separate lines.

What exclusions should always be listed?

Engineering and detailing if not requested, inspection beyond what is stated, installation, taxes, freight when not included, and any rework from customer drawing changes.

Is this a legal contract?

It is a commercial proposal. Acceptance by the customer can create obligations, so have counsel review your standard terms and conditions and attach them to the quote.

If you want quotes generated and tracked from your ERP, with costs pulled from routings and material history, Netray can build that inside your environment.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs