NetSuite Inventory Turnover and Days of Supply Calculator
Turns and days of supply are the quickest read on whether inventory is working or sitting. Enter COGS and average inventory from your NetSuite financial reports and you get turns, days of supply, carrying cost and how much cash is tied up above your target.
Your numbers
From the income statement for the last 12 months.
Average of month-end inventory asset balances, not a single snapshot.
Capital, storage, insurance, shrink and obsolescence combined.
Your results
Uses a 365 day year and a single blended carrying rate. Segment by item class for decisions on specific parts.
Days of supply and carrying cost vs average inventory
Sweeps Average inventory value from 500000 to 4000000, holding your other inputs fixed.
Excess and slow mover list
Optional: we can outline how to build an item-level excess stock list from your NetSuite data, read-only.
Optional. The tool and every export work without this. No spam.
How to use it
Pull trailing twelve month COGS from the income statement and month-end inventory asset balances from the balance sheet, then average the twelve balances. A single snapshot misleads when you have seasonal builds. Set your carrying cost rate with finance and a target days of supply. The calculator returns turns, days, carrying cost and the excess against target. Use it at company level first, then repeat per location or product family from saved searches.
The formulas
Turns equal annual COGS divided by average inventory value. Days of supply equals 365 divided by turns. Carrying cost is average inventory times the carrying rate. Inventory at target is COGS per day times target days; the excess is the amount above it, and the savings estimate is that excess times the carrying rate. These are the same ratios used in working capital reviews, so the numbers will reconcile with the days inventory outstanding that lenders and boards track.
- Use COGS, not sales, for the numerator
- Average inventory over the year, not one date
- Exclude consigned or customer-owned stock
Reading results
Healthy turns vary by industry: high-mix, long-lead aerospace parts run lower than electronics assembly. Compare against your own history and similar businesses, not a generic benchmark. A rising days figure with flat sales usually means slow-moving or obsolete stock; falling turns with growing sales may signal safety stock inflation. Common mistakes are including WIP in one period and not another, and mixing currencies. Release of excess is only real if the stock can be sold, returned or consumed.
Frequently Asked Questions
Which NetSuite reports give me the inputs?
The income statement provides COGS and the balance sheet provides inventory asset balances by month. Inventory valuation reports or saved searches give the same detail by item or location.
What is a good inventory turnover?
It depends on industry and mix. Compare against your own trend and peers. A high-mix build-to-order manufacturer will turn slower than a high-volume distributor, so a generic target can mislead.
Should WIP be included in inventory?
Be consistent. Many manufacturers calculate turns on finished goods and raw materials separately from WIP, because WIP depends on cycle time rather than stocking decisions.
How do I choose a carrying cost rate?
Add cost of capital, storage, insurance, handling, shrink and obsolescence as a percentage of inventory value. Rates between 15 and 30 percent are common, but your finance team should set yours.
Netray can produce an item-level slow mover and excess list from live NetSuite data so the working capital number becomes a concrete action list.
Related Tools
NetSuite Reorder Point and Preferred Stock Level Calculator
Work out the safety stock, reorder point and preferred stock level values to enter on a NetSuite item record.
NetSuiteNetSuite Economic Order Quantity Calculator
Find the order quantity that minimizes ordering plus holding cost and compare it with the quantity you buy today.
NetSuiteNetSuite Landed Cost Allocation Calculator
Spread freight, insurance and duty across a shipment by value or weight and see the landed cost per unit for one receipt line.
More NetSuite tools
See all- NetSuite SuiteScript Governance Units Estimator
- NetSuite Work Order Status Reference
- NetSuite Saved Search Formula Generator
- NetSuite CSV Import Template Guide
- NetSuite Assembly Build Checklist
- NetSuite Role Permission Matrix Worksheet
- NetSuite Inventory Costing Method Reference
- NetSuite Month End Close Checklist
- NetSuite License Cost Estimator
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- Oracle Fusion Inventory Turns and Carrying Cost CalculatorCompute inventory turns and days on hand from COGS and average inventory, then see the cash and carrying cost released by a higher target.
- Inventory Turnover CalculatorConvert your COGS and average inventory into turns and days on hand, then see how much working capital a realistic turns target would release.
- NetSuite Average Cost per Location CalculatorEnter on-hand quantity, current average cost and a receipt with landed cost to see the new location average, COGS on the next issue and the cost change.
ERP fixes and how-tos
- NetSuite MRP Not Generating Planned Orders: Causes and FixesWhy NetSuite supply planning creates no planned orders: item planning fields, time fences, lead time, lot sizing, demand source, and how to firm and release.
- NetSuite Quality Management: Incoming Inspection and QuarantineNetSuite has no full QMS, but inventory status, workflows and custom records give incoming inspection, quarantine and NCR tracking. Setup steps and limits.
- NetSuite Lot and Serial Traceability: Forward and Backward TraceTrace a lot or serial number forward to customers and backward to vendors in NetSuite using inventory detail, inventory numbers, saved searches and SuiteQL.
Runs with your ERP
- Oracle Mobile Supply Chain Applications (MSCA) for Oracle EBSOracle Mobile Supply Chain Applications (MSCA) for EBS: native RF transactions for inventory, WMS and manufacturing, setup, pitfalls and where private AI helps.
- NetSuite AI Connector Service (MCP) and SuiteAgents with Oracle NetSuiteHow the NetSuite AI Connector Service (MCP) and SuiteAgents work: what external AI assistants can do, setup, pitfalls and where a private AI layer fits.
- NetSuite Quality Management SuiteApp: inspections and nonconformanceWhat the NetSuite Quality Management SuiteApp does: inspection specs, queues, sampling and nonconformance workflows. Setup, pitfalls, alternatives and AI uses.
AI on your ERP
- NetSuite Inventory and Demand Planning With AI That Checks Your Reorder LogicAI for NetSuite inventory and demand planning: review reorder points, safety stock, item demand plans and stockouts using SuiteQL on private infrastructure.
- AI-Powered Demand Forecasting Integrations for NetSuite: Models, Item Demand Plans and ExplanationsHow AI demand forecasting integrates with NetSuite: native demand plans, external forecast models, importing item demand plans and explaining changes.
Integrations
- How to use ChatGPT with Oracle NetSuiteConnect ChatGPT to Oracle NetSuite: custom GPT actions, exports versus live access, enterprise data controls, and when a private model is the safer choice.
- How to use Claude with Oracle NetSuiteUse Claude with Oracle NetSuite through MCP connectors, the Anthropic API, AWS Bedrock or Vertex, plus the on-prem alternative for controlled data.
Software
- Oracle NetSuiteOracle NetSuite explained for manufacturers: modules, SuiteScript, SuiteTalk and SuiteQL, cloud deployment, limits, alternatives and where AI helps.
- Oracle Supply Chain PlanningOracle Supply Chain Planning explained: demand, supply, replenishment and S&OP capabilities in Oracle Fusion Cloud, integrations, limits and alternatives.