NetSuiteFree referencePDF, Excel, Word exportNetSuiteAll NetSuite tools

NetSuite Saved Search Summary Types, Group By and Summary Criteria

This reference covers the six Summary Types on a NetSuite saved search Results subtab and the formula patterns built on them, from count distinct to latest value per group. It also explains the Summary subtab on Criteria, which is the saved search equivalent of SQL HAVING.

Download:
PartSummary type or patternApplies toWhat it returnsTypical useFormula patternGotcha
A: Summary types
Group
Any field or formula
One row per distinct value
Group by customer, item, month
Customer: Group
Every non-aggregated column must be Group once any column has a summary type.
A: Summary types
Count
Any field
Number of result rows in the group
Lines per customer
Internal ID: Count
Counts lines, not documents, unless Main Line is true.
A: Summary types
Sum
Numeric and currency fields
Total of the values
Revenue, quantity
Amount: Sum
Without a Main Line filter, header and line amounts add together.
A: Summary types
Minimum
Numeric, currency, date and text fields
Lowest value
First order date
Date: Minimum
Text minimum is alphabetical.
A: Summary types
Maximum
Numeric, currency, date and text fields
Highest value
Last order date, latest status
Date: Maximum
Also the summary type to use on formulas that already contain an aggregate.
A: Summary types
Average
Numeric and currency fields
Mean of the values
Average line value
Amount: Average
Averages lines, not orders; use a ratio formula for average order value.
B: Patterns
Count distinct documents
Formula (Numeric)
Number of distinct transactions
Orders per customer on a line-level search
COUNT(DISTINCT {internalid}) with Summary Type Maximum
Plain Count on a line search overcounts multi-line orders.
B: Patterns
Conditional sum
Formula (Currency)
Total for rows meeting a condition
Billed vs open value in one row
CASE WHEN {status} = 'Billed' THEN {amount} ELSE 0 END with Summary Type Sum
Return 0 in ELSE, not NULL, so totals show.
B: Patterns
Conditional count
Formula (Numeric)
Rows meeting a condition
Late lines per vendor
CASE WHEN {duedate} < {today} THEN 1 ELSE 0 END with Summary Type Sum
Sum of 1s and 0s, not Count; Count would count every row.
B: Patterns
Last value of a date
Date field
Most recent date per group
Last purchase date per item
Date: Maximum
Combine with Group on item; filter type first.
B: Patterns
Latest value per group
Formula (Currency) or (Text)
Value from the newest row in the group
Last price paid per item
MAX({rate}) KEEP (DENSE_RANK LAST ORDER BY {trandate}) with Summary Type Maximum
Ties on the same date return the highest value; add {internalid} to ORDER BY to break ties.
B: Patterns
Earliest value per group
Formula (Currency) or (Text)
Value from the oldest row
First price quoted
MAX({rate}) KEEP (DENSE_RANK FIRST ORDER BY {trandate}) with Summary Type Maximum
FIRST and LAST refer to the ORDER BY, not to MAX or MIN.
B: Patterns
Average order value
Formula (Currency)
Total divided by distinct documents
AOV per customer
SUM({amount}) / NULLIF(COUNT(DISTINCT {internalid}), 0) with Summary Type Maximum
Use Main Line false and exclude tax and shipping lines if AOV should be goods only.
B: Patterns
Summary criteria (HAVING)
Criteria > Summary subtab
Only groups meeting a condition on an aggregate
Customers with Sum of Amount greater than 50,000
Summary Type Sum, Field Amount, is greater than 50000
Standard criteria filter rows before grouping; Summary criteria filter groups after.
B: Patterns
Summary criteria on a formula
Criteria > Summary subtab
Groups meeting a formula condition
Items with more than 3 distinct vendors
Formula (Numeric) COUNT(DISTINCT {vendor}) with Summary Type Maximum, is greater than 3
The same aggregate-inside rule applies: pick Maximum.
B: Patterns
Main line handling
Transaction searches
Header rows only or line rows only
Counting orders vs summing lines
Criteria: Main Line is true (headers) or is false (lines)
Leaving Main Line unset mixes header totals with lines and doubles sums.
B: Patterns
Group by a formula
Formula (Text) or (Date)
Buckets you define
Revenue by month
TO_CHAR({trandate}, 'YYYY-MM') with Summary Type Group
Sort ascending on the formula; YYYY-MM sorts correctly as text.
B: Patterns
Group by age bucket
Formula (Text)
Aging bands
Open AR by 30-day bucket
CASE WHEN {today} - {duedate} <= 30 THEN '0-30' ELSE '30+' END with Summary Type Group
Buckets sort as text; prefix with numbers to control order.
B: Patterns
Count of documents on a header search
Internal ID
Documents per group
Invoices per month
Main Line is true, Internal ID: Count
Only correct when Main Line is true; otherwise use COUNT(DISTINCT).
B: Patterns
Signed quantity totals
Quantity on transaction lines
Net quantity
Units sold net of returns
CASE WHEN {type} = 'Credit Memo' THEN -ABS({quantity}) ELSE ABS({quantity}) END with Summary Type Sum
Line signs vary by type; normalise with ABS and set the sign yourself.

Summary types are set per column on the Results subtab; summary filters live on Criteria > Summary. When a formula already contains an aggregate (COUNT, SUM, MAX ... KEEP), set the column to Maximum (or Minimum) so NetSuite treats it as a summary column. Test each pattern on a sandbox saved search before you share it.

Summary search totals wrong?

Send us the criteria and results setup and we will find the double count or grouping issue.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How summary searches work

A summary search is a GROUP BY query. Once you set a Summary Type on any Results column, every column needs one: Group for the dimensions, and Count, Sum, Minimum, Maximum or Average for the measures. Standard criteria filter rows before grouping; criteria on the Summary subtab filter the groups afterwards. Clicking a summary value in the results drills down to the rows behind it, which is the quickest way to check a total.

  • Dimensions: Group
  • Measures: Sum, Count, Minimum, Maximum, Average
  • Group filter: Criteria > Summary

Worked example: top customers by distinct orders

Transaction search, Criteria: Type is Sales Order, Main Line is false, Date within this fiscal year. Results: Name with Summary Type Group; Formula (Numeric) COUNT(DISTINCT {internalid}) with Summary Type Maximum; Amount with Summary Type Sum. Criteria > Summary: Summary Type Sum, Field Amount, is greater than 50000. The result is one row per customer with at least 50,000 of order lines, the number of distinct orders and the total line amount. Because Main Line is false, plain Count would have counted lines, not orders.

Common mistakes

The usual errors are double counting from an unset Main Line filter, Count used where distinct documents were wanted, Average on lines read as average order value, and a formula containing SUM or COUNT left with Summary Type Sum, which nests aggregates and fails. Another one is filtering on an aggregate in standard criteria: a filter like Amount greater than 50,000 there applies to each line, not to the customer's total.

How to check the result in the system

Drill into one group by clicking its summary value and compare the detail rows with what you expected: one row per line or per document. Then compare the total with a standard report such as Sales by Customer Summary for the same period. If they differ, check Main Line, tax and shipping lines and the transaction types included.

Frequently Asked Questions

How do I group by in a NetSuite saved search?

On the Results subtab, set Summary Type to Group on each column you want to group by, and set Sum, Count, Minimum, Maximum or Average on the measure columns. Every column must have a summary type once one does.

What are summary criteria in NetSuite?

The Summary subtab on the Criteria tab filters on aggregated values after grouping, like SQL HAVING. Choose a Summary Type, a field and a condition, for example Sum of Amount greater than 10,000, to keep only groups that pass.

How do I count distinct values in a saved search?

Add a Formula (Numeric) column with COUNT(DISTINCT {internalid}) and set its Summary Type to Maximum. Maximum tells NetSuite the formula is already an aggregate. Replace {internalid} with any field you want distinct counts of, such as {item} or {entity}.

Why does my saved search Count show more than the number of orders?

Transaction searches return one row per line unless Main Line is true. Count therefore counts lines. Either add Main Line is true for header-level counts, or use COUNT(DISTINCT {internalid}) with Summary Type Maximum on a line-level search.

If your team builds summary searches every week to answer the same questions, we can set up a private AI layer over NetSuite that answers them in plain English and shows the logic.

Get NetSuite alerts

Support and maintenance deadlines, release changes that affect NetSuite sites, and new free NetSuite tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for NetSuite: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations

Comparisons

Software