Oracle EBS On Prem vs OCI, AWS or Azure: Hosting Cost Calculator
This calculator compares the monthly and five-year infrastructure cost of an Oracle E-Business Suite 12.2 estate on your own hardware against OCI, AWS or Azure, using the vCPU and storage prices from your quotes. Oracle licences are treated as bring-your-own and left out of both sides.
Your numbers
Enter the compute price from your own quote, including memory for the shape you chose.
Prod is costed at 730 hours. Shutting non-prod down at night and weekends lowers this.
Covers database, fs1/fs2/fs_ne application storage and backups as a multiple of database size.
Your results
Oracle licences are excluded (bring your own licence in both options). All prices are your inputs; this tool does not contain vendor price lists. On-prem cost uses straight-line amortisation and assumes the capex already covers the environments entered.
Monthly cost vs number of environments
Sweeps Environments (prod plus non-prod clones) from 1 to 10, holding your other inputs fixed.
Get your hosting comparison reviewed
Send your environment list and quotes and we will check the inputs, flag missing cost lines and return a reviewed comparison.
Optional. The tool and every export work without this. No spam.
How to use it
Count production plus every non-production clone you keep running (test, UAT, patch, dev). Enter the database and application tier shapes you would deploy, then paste the per-vCPU-hour and per-GB-month prices from your cloud quote. Production runs 730 hours a month; non-production runs only the hours you enter, which is where most cloud savings come from. On the on-prem side enter the hardware capex for servers and storage, the amortisation period, monthly data centre and hardware support, and the admin effort. The admin inputs are there because the work changes between options: patching hardware and storage goes away in cloud, but cloud cost management and network work arrive.
- Cloud compute = (prod DB vCPU + nodes x app vCPU) x 730 x rate + (envs - 1) x (non-prod DB vCPU + nodes x app vCPU) x non-prod hours x rate
- Cloud storage = DB GB x environments x multiplier x price
- On-prem monthly = capex / (years x 12) + data centre + admin
Licensing and tooling differences to check
Oracle publishes a policy document, Licensing Oracle Software in the Cloud Computing Environment, that sets how vCPUs on authorised clouds such as AWS and Azure count toward processor licences. On OCI, Oracle counts OCPUs under its own rules. The effect is that the same database shape can need a different number of licences depending on where it runs, so check this with your licensing team before comparing; it can outweigh every infrastructure line here. On OCI, Oracle provides EBS Cloud Manager to provision, clone and lift-and-shift EBS environments, which reduces clone effort. On AWS and Azure, cloning uses the standard Rapid Clone process with your own automation.
Worked example and how to read it
With the defaults, prod compute is (16 + 2 x 8) x 730 x 0.05 = 1,168 per month, and three non-prod environments add 3 x (8 + 16) x 400 x 0.05 = 1,440. Storage is 1,000 x 4 x 2.5 x 0.04 = 400. Cloud totals 15,008 a month with admin. On-prem is 250,000 / 60 + 3,000 + 15,000 = 22,167 a month. Over five years the difference is about 429,000 in favour of cloud with these inputs. Most of that gap comes from the admin and capex lines, not compute, so test the result by setting both admin inputs equal; if the answer flips, the decision rests on your staffing assumption.
Common mistakes
Leaving non-production running 730 hours in the cloud case removes most of the saving, so only enter shutdown hours you will actually enforce. Forgetting that 12.2 keeps two editions of the application file system (fs1 and fs2) plus fs_ne undercounts storage. Other gaps: ignoring network egress and VPN or FastConnect, ExpressRoute or Direct Connect costs; ignoring the hardware refresh due inside five years on-prem; and comparing reserved-instance cloud pricing against on-prem hardware that is already depreciated.
Frequently Asked Questions
Can Oracle EBS run on AWS or Azure?
Yes. Oracle certifies EBS on supported operating systems and databases, and customers run it on AWS and Azure using their own licences. Check certification for your exact EBS, database and OS versions on My Oracle Support, and check how vCPUs count for licensing under Oracle's cloud licensing policy.
What is EBS Cloud Manager?
EBS Cloud Manager is an Oracle tool for Oracle Cloud Infrastructure that provisions new EBS environments, lifts and shifts existing ones from on-premises, and clones environments inside OCI. It is OCI-specific; on other clouds you use Rapid Clone and your own scripts.
Are Oracle licences included in this comparison?
No. The calculator assumes bring-your-own-licence in both options and compares only infrastructure and admin effort. Licence counts can differ between OCI and authorised third-party clouds because vCPUs are counted under different rules, so evaluate licensing separately before deciding.
Is cloud always cheaper for EBS?
No. The result depends mostly on how many non-production environments you can shut down, your admin staffing assumption and whether on-prem hardware is already paid for. Stable estates on depreciated hardware with small teams can be cheaper on-prem; estates facing a hardware refresh often are not.
If you want a private AI assistant over your EBS data that runs wherever EBS runs, on-prem or in your own cloud tenancy, we can set that up.
Related Tools
Oracle EBS 12.2 Disk Space Calculator (fs1, fs2, fs_ne and Database)
Size application and database tier storage for EBS 12.2, including both file system editions, fs_ne, staging, growth and backups.
OracleOracle EBS Critical Patch Update (CPU) Annual Effort Calculator
Estimate the annual hours, cost and production downtime of applying Oracle CPU patches to EBS, by cycle frequency and number of environments.
OracleOracle EBS Database Growth Forecast Calculator
Project EBS database size from monthly growth and a one-time purge, and see how many months of storage headroom remain.
OracleOracle EBS Rapid Clone Checklist
Step-by-step checklist for cloning an EBS instance with Rapid Clone, including the post-clone scrubbing that protects production data and integrations.
More Oracle tools
See all- Oracle EBS Inventory Tables Reference
- Oracle EBS WIP Tables Reference
- Oracle EBS Cycle Count Workload Calculator
- Oracle EBS Discrete Manufacturing Go-Live Checklist
- Oracle EBS Inventory Accuracy Readiness Assessment
- Oracle EBS Concurrent Request Phase and Status Reference
- Oracle EBS Responsibility Design Worksheet
- Oracle EBS GL Period Close Checklist
- Oracle EBS AP Invoice Interface Template
New to Oracle E-Business Suite? Start with the Oracle E-Business Suite guide and toolkit, or plan with Oracle EBS Roadmap Planner, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- Oracle EBS 12.2 Private AI Layer Blueprint GeneratorFill in your Oracle EBS 12.2 version, database, hosting and users to get a shareable architecture plan for a private, on-prem AI assistant.
- Oracle EBS 12.2 AI Assistant Sizing and Value CalculatorEstimate peak load, GPUs, index size, hours saved and payback for an on-prem AI assistant on Oracle EBS 12.2.
- Oracle EBS 12.2 Upgrade Readiness ChecklistCheck whether your EBS environment, custom code and team are ready to move to Release 12.2 and what to settle before the project starts.
ERP fixes and how-tos
- How to Add a Private AI Layer to Oracle EBS 12.2 On-PremReference architecture for a private AI layer on Oracle EBS 12.2: Active Data Guard replica, ISG REST, MO and responsibility security, local GPUs and audit.
- Oracle EBS 12.2: stay on-prem or move to Fusion in 2026How CIOs on Oracle E-Business Suite 12.2 should weigh staying on-prem against migrating to Oracle Fusion Cloud ERP, with support dates and a practical decision path.
- How to Create an Item in Oracle EBSCreate an inventory item in Oracle EBS: Master Items form, master organization, templates, attributes, organization assignment, categories and common errors.
Runs with your ERP
- Esker Order Management and Oracle E-Business SuiteHow Esker captures customer POs from email, fax and PDF and creates sales orders in Oracle EBS: integration, data flows, setup, pitfalls and a private AI layer.
- Cloud Inventory (DSI) with Oracle E-Business Suite: Mobile Barcode InventoryCloud Inventory, formerly DSI, adds offline mobile barcode inventory to Oracle E-Business Suite and JD Edwards. Data flows, setup steps, pitfalls and AI notes.
- BarTender and Oracle E-Business Suite: Label Printing from OracleHow BarTender prints labels from Oracle EBS using Oracle XML print requests and Integration Builder: methods, data flows, setup steps, pitfalls and AI help.
AI on your ERP
- AI for Oracle E-Business Suite, Without Leaving On-PremHosting Oracle EBS 12.2 on-prem or in a private cloud? Add a private LLM over concurrent programs, interface tables and AP/PO data without moving to Fusion.
- AI for Oracle EBS in Aerospace and Defense ManufacturingAI on Oracle EBS for aerospace and defense manufacturers: project manufacturing, serial control, and ITAR segregation handled without a cloud dependency.
Integrations
- How to connect Power BI to Oracle E-Business SuiteConnect Power BI to Oracle E-Business Suite: Oracle connector, reporting replica, on-premises data gateway, manufacturing dashboards and natural-language Q&A.
- How to add WhatsApp to Oracle E-Business SuiteHow to connect WhatsApp Business to Oracle E-Business Suite 12.1 and 12.2: ISG REST, Workflow business events, template messages and two-way replies into EBS.