Industry TemplatesFree templatePDF, Excel, Word exportElectronics Manufacturing

PCBA Turnkey Quote Letter Template

A quote that leaves out assumptions is an invitation to a dispute. This template produces a clear turnkey PCBA quote with price tiers, NRE, lead time and explicit assumptions and exclusions you can export as PDF or Word.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

PCBA Turnkey Quote Letter Template

Quotation Q-26-1042

From: Northfield Electronics Assembly To: Harbor Instruments Inc., attention Procurement team Date: 2026-10-20 Valid for: 30 days from the quote date

Scope

Assembly: Sensor Interface Board Part number and revision: SIB-2200 Rev C Build type: Full turnkey Workmanship: IPC-A-610 Class 2 Process: Lead-free (RoHS)

Pricing

QuantityUnit price (USD)Notes
50$62.40Per assembled and tested board
250$48.15Per assembled and tested board
1000$41.90Per assembled and tested board

One-time charges

NRE: $1,150, billed with first order

Lead time and shipping

Lead time: 15 working days Shipping terms: FCA our facility Payment terms: Net 30

Assumptions

Pricing assumes the BOM, Gerber, centroid and assembly drawing package received on the quote date. Component prices are held for the validity period and are subject to stock availability at order. Attrition and MOQ overage are included to the extent stated in the BOM costing.

Exclusions

Excludes conformal coating, box build, programming of customer firmware, burn-in, and customer specific labeling unless listed. Excludes tariffs or duties changed after the quote date. Excludes engineering changes after order.

Acceptance

Prepared by / Date
Customer authorized signature / Date
Date / Date

A starting point for a commercial quote, not legal advice. Have counsel review your standard terms on warranty, liability, intellectual property, ITAR or export control, and cancellation or rescheduling charges. Add component price validity and lead time caveats that match your procurement reality.

Generate this quote from your ERP

An optional conversation about filling quote documents from live BOM, routing and pricing data with human approval.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Fill the company, customer and assembly fields, then enter price tiers from your costing worksheet. Select the build type (full turnkey, partial turnkey or consigned), the workmanship standard and the solder process, since each changes cost and responsibilities. Add NRE, lead time, shipping and payment terms. Edit the assumptions and exclusions to match the job and export the document. The signature block gives the customer a place to accept the quote with their purchase order reference.

What a good quote states

The assumptions and exclusions sections matter most. They define what the price covers: the data package revision, component availability, validity period, overage, and what happens if tariffs or prices move. Exclusions prevent surprises about coating, box build, firmware loading, burn-in, labeling and engineering changes. State how long prices are held, who owns long lead material risk, and how excess inventory and cancellation are handled.

  • Revision of BOM, Gerber and drawings quoted
  • Price validity and lead time basis
  • Treatment of excess material and cancellation
  • Workmanship class and any test included

Choosing a build type

In full turnkey you buy all parts and carry the material risk, so assumptions on lead time and price validity are essential. In partial turnkey the customer supplies selected parts and you must define receiving, shortages and attrition on consigned items. In consigned builds you quote labor and process only, and should specify overage, kitting accuracy and who pays when parts are short or damaged. The right wording differs for each, so change the assumption text rather than leaving the default.

Common mistakes

Leaving out the revision of the BOM and drawings makes every later change a pricing argument. Quoting a firm price on parts with volatile availability, without a validity limit, shifts all risk to you. Mixing IPC classes silently is another problem: Class 3 inspection and documentation costs more and should be explicit. Finally, do not send a quote without checking for export control restrictions on the technical data and destination.

  • Quote against a specific revision
  • Set a price validity limit
  • Name the IPC class
  • Check export control before sharing data

Frequently Asked Questions

How long should a PCBA quote be valid?

Often 30 days, shorter if component prices or availability are volatile. Tie validity to your supplier quote validity so you are not holding prices you cannot buy at.

Should NRE appear on the quote?

Yes. List it as its own line with when it is billed and whether it is refundable or credited. Hidden NRE inside unit prices causes confusion on reorders.

What is the difference between full and partial turnkey?

In full turnkey the assembler procures all parts. In partial turnkey the customer supplies some parts, often long lead or proprietary items, and the assembler buys the rest. Responsibility for shortages and damage should be defined for the supplied parts.

Does this template include terms and conditions?

It includes the commercial essentials only. Attach your standard terms and conditions and have counsel review them. The notes remind you which items, such as warranty and liability, deserve legal review.

If you generate quotes from an ERP, we can fill this structure automatically from BOM, routing and price data, with a human review step before anything goes to a customer.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring