PPAP Appearance Approval Report (AAR) Template
The appearance approval report is the PPAP record for parts where colour, grain, gloss or texture is a customer requirement. It captures what was measured, what master sample was set and what the customer decided. This template creates a tidy document you can export and attach.
Fill in
Appearance Approval Report Template
Appearance Approval Report
Supplier: Acme Molded Plastics Ltd Customer: Example Automotive Tier 1 Part number: TRM-20917 Part name: Interior trim bezel Report date: 2026-10-20
Appearance item details
Colour and specification: Graphite Grey, spec CS-4471 rev B Grain or texture: Fine leather grain G-12 Material and lot: PC/ABS blend, lot L-5521 Tool and cavities: Tool T-310, cavities 1 to 4
Measurement and evidence
Spectrophotometer D65/10 deg, delta E vs master: 0.62 max across 5 parts. Gloss at 60 deg: 3.1 to 3.4 GU.
Attach: colour data export, photos under controlled lighting, master sample reference.
Evaluation matrix
| Item | Requirement | Result | Pass / fail |
|---|---|---|---|
| Colour match | Within customer delta E limit | ||
| Gloss | Within gloss range | ||
| Grain / texture | Matches approved grain plate | ||
| Surface defects | No sink, flash or splay on A surface | ||
| Master sample | Retained and tagged |
Disposition
Disposition requested: Approved
Customer comments:
Approvals
Use only for parts with appearance requirements. Many customers have their own AAR form and limits; treat this as a structure for collecting the same information, not as a replacement for a mandated form.
Want lot and tool traceability tied to approvals?
Optional review of linking PPAP approvals to lot and tooling records in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill in the part, material, colour and grain details, then summarise your measurements in the evidence field. Print or export the document, attach the colour data and photos, and send it with the master sample if the customer requires one. The evaluation matrix lets reviewers tick each appearance characteristic. Keep a retained sample so future production can be compared to the approved reference.
- Use controlled lighting for photos
- Record the instrument, illuminant and angle
- Tag and retain the master sample
- Note any customer-specific limits
Method behind colour measurement
Colour is commonly compared with a spectrophotometer and expressed as a colour difference value against the master, with limits set by the customer. The illuminant and observer, such as D65 and 10 degrees, must match the customer's method, or numbers will not be comparable. Gloss is measured at an angle, often 60 degrees for plastics, and grain is verified against an approved grain plate or sample.
Reading the example
The sample describes an interior trim bezel in a grey colour with a leather-style grain. The measurement summary shows a small colour difference across five parts and a gloss range. The matrix is empty so the reviewer can complete it. Replace values with your own readings and requirements before submission.
Common mistakes
Typical issues are measuring with a different geometry from the customer, approving colour under factory lighting rather than the agreed light booth, and failing to retain a master sample. Another is changing material lot or colour masterbatch after approval without notifying the customer. Treat changes to colour, grain tool or material as notifiable.
Frequently Asked Questions
Is an appearance approval report always required?
No. It applies to parts with appearance requirements such as colour, grain or texture. If the part has none, mark the element as not applicable in your PPAP checklist as agreed with the customer.
What is a master sample?
A master sample is an approved part kept as the visual and colour reference. It is tagged with part number, revision and approval date, and retained by the supplier and sometimes the customer for comparison with production.
What delta E is acceptable?
There is no universal value. The customer defines the limit and the measurement method in their colour specification. Use the number in your customer's document, and record the instrument and illuminant used.
Can I export this as a Word file?
Yes. Use the export options for Word, PDF or Excel. You can paste images and add the customer form fields in the exported document.
If lot and tooling traceability sits in your ERP, Netray can help link appearance approvals to the lot and tool data, read-only.
Related Tools
PPAP Process Flow Diagram Template
Fill in a header and an operation table that documents the production flow from receiving to shipping, ready to export.
Quality & InspectionInitial Process Study Cpk Worksheet
Summarise capability for each characteristic from mean, standard deviation and limits, and flag those below the PPAP acceptance target.
Quality & InspectionSpecial Characteristics Matrix Worksheet
Trace each special characteristic from drawing to PFMEA, control plan, gage and capability study in one editable table.
Quality & InspectionSupplier PPAP Request Letter Template
Generate a clear letter asking a sub-supplier for a PPAP submission with level, due date, required elements and contact details.
More Quality & Inspection tools
See all- PPAP Submission Level Requirements Reference
- PPAP Part Submission Warrant Template
- APQP Timing Plan Worksheet
- IATF 16949 Internal Audit Checklist
- Run at Rate Calculator
- PPAP Dimensional Results Worksheet
- Customer Specific Requirements Matrix Worksheet
- APQP Phase Gate Checklist
- PFMEA Worksheet with RPN for PPAP
Keep exploring
Free tools
- Final Inspection ChecklistA pre-shipment checklist covering records, measurements, function, appearance, labeling, packing and release authorization.
- APQP Status Report TemplateA fill-in APQP status report covering the five phases, red/yellow/green status, deliverables, open issues and decisions needed, ready to send to a customer.
- Customer Specific Requirements Matrix WorksheetAn editable matrix of customer specific requirements with owner, evidence and status, exportable to Excel.
ERP fixes and how-tos
- IFS Cloud Report Builder, Appearance Designer, Custom Menus and Approval TemplatesIFS Cloud reporting and UI customization explained: report designer versus Crystal, the Appearance designer, custom menus and approval templates.
- How to Set Up Approval Routing in NetSuiteHow to configure NetSuite approval routing for purchase orders, vendor bills, and expense reports using native approval limits or SuiteFlow workflows.
Guides
- How to Set Up Document Control in SyteLineGuide to implementing document control in Infor SyteLine. Configure document types, revision management, approval workflows, and distribution control for ISO 9001 and AS9100 compliance.
- Setting Up Mobile Approval Workflows in SyteLineConfigure mobile approval workflows in SyteLine for purchase orders, expense reports, and change requests. Enable on-the-go approvals for CloudSuite Industrial.