Supplier PPAP Request Letter Template
When you buy a part or a process like heat treat, plating or machining from a sub-supplier, you need to ask for PPAP clearly and early. This template builds a request letter with the level, due date and required elements so there is no confusion about what is expected.
Fill in
Supplier PPAP Request Letter Template
PPAP Submission Request
Date: 2026-10-20 To: Quality Manager, Northline Heat Treat Pvt Ltd From: R. Patel, Supplier Quality Engineer, Acme Precision Components Ltd
Subject: PPAP for part SHF-7781 Heat treated shaft, revision B
We are asking Northline Heat Treat Pvt Ltd to submit a Production Part Approval Process package for the part above.
Reason for submission: New part Submission level: Level 3 Due date: 2026-12-04 Sample quantity: 30 pieces from a production run
Parts must come from a significant production run using production tooling, gages, process and operators.
Required elements
| Element | Required | Notes |
|---|---|---|
| Design records and drawing | Yes | Ballooned drawing |
| Process flow diagram | Yes | |
| PFMEA | Yes | |
| Control plan | Yes | |
| Dimensional results | Yes | Matching balloons |
| Material and performance test results | Yes | Accredited lab where required |
| Initial process studies | Per special characteristics | Target index per our requirement |
| MSA studies | Per gages used | |
| Part submission warrant | Yes | Signed |
Instructions
Please send the package to R. Patel, Supplier Quality Engineer by 2026-12-04. Do not ship production parts until we send written approval or interim approval. If you expect to miss the date or find a requirement you cannot meet, tell us as soon as you know.
Acknowledgement
Adjust the element table to your customer's requirements and your own supplier manual. This is a generic letter and not a contract document.
Want PPAP status visible in purchasing?
Optional review of how supplier approval status can be shown inside your ERP purchasing flow.
Optional. The tool and every export work without this. No spam.
How to use the letter
Fill in the part, revision, submission level and due date, choose the reason for submission and adjust the elements table. Export to Word or PDF and send it with the drawing and any specific requirements. Keep a copy in the sourcing record so you can show which level and date you asked for if a dispute comes up. Send it as early as possible, because late requests compress the supplier's PPAP time.
- State the submission level explicitly
- Give a date, not a vague deadline
- Attach the latest drawing revision
- Tell the supplier when production shipment is allowed
Choosing a submission level
Level 1 is the warrant only. Level 2 adds limited supporting data with product samples. Level 3 is the default, with the warrant, product samples and complete supporting data. Level 4 covers the warrant and other requirements defined by the customer. Level 5 adds the warrant, samples and complete supporting data reviewed at the supplier's location. Use Level 3 unless your customer or risk assessment says otherwise.
Reading the sample letter
The sample asks a heat treat sub-supplier to submit Level 3 PPAP for a shaft, with 30 pieces from a production run and a December due date. The element table lists the usual PPAP documents. Heat treat suppliers often need a calibrated furnace survey and accredited lab hardness data, which you can add in the notes column.
Common mistakes
Common mistakes include not stating the level, sending an outdated drawing, and setting dates that do not leave time for review before your own customer's due date. Another is allowing production shipments before approval. Track the PPAP status per part in your ERP or supplier portal so buyers can see approval status before releasing purchase orders.
Frequently Asked Questions
Which PPAP level should I ask my supplier for?
Level 3 is the common default. Use a lower level for low-risk catalogue parts and a higher level for safety items or suppliers with quality problems. Always follow your own customer's requirement for flow-down.
When is PPAP required again?
Typically for new parts, engineering changes, tooling or process changes, a change of sub-supplier, and after lapses in production, depending on customer requirements. Define these triggers in your supplier manual.
Do I need to review a sub-supplier's PPAP?
Yes. You are responsible for the quality of the whole supply chain. Review the package for completeness and consistency, and record approval before using the parts for your own submission.
Can I send this by email?
Yes. Export to PDF or Word and attach it to an email, or paste the text into your supplier portal. Keep the sent copy in the supplier file.
If PPAP status should block or release purchase orders in your ERP, Netray can help you design that check with human approval on any write-back.
Related Tools
Appearance Approval Report Template
Record appearance item details, colour and grain evidence, master sample status and customer approval in a document you can export.
Quality & InspectionAPQP Team Feasibility Commitment Template
Document whether your cross-functional team can make the part as specified, with concerns, actions and signatures.
Quality & InspectionProduction Control Plan Worksheet for PPAP
Editable control plan table covering characteristic, specification, measurement method, sample size, frequency and reaction plan.
Quality & InspectionPPAP Process Flow Diagram Template
Fill in a header and an operation table that documents the production flow from receiving to shipping, ready to export.
More Quality & Inspection tools
See all- PPAP Submission Level Requirements Reference
- PPAP Part Submission Warrant Template
- APQP Timing Plan Worksheet
- IATF 16949 Internal Audit Checklist
- Run at Rate Calculator
- PPAP Dimensional Results Worksheet
- Customer Specific Requirements Matrix Worksheet
- APQP Phase Gate Checklist
- PFMEA Worksheet with RPN for PPAP
Keep exploring
Free tools
- PPAP Cost Calculator by Submission LevelEstimate what a PPAP will cost by submission level, from documentation labor and CMM layouts to capability studies and testing.
- PPAP 18 Elements Supplier Submission ReferenceA reference of the 18 PPAP elements, what each proves, what evidence to expect and what a reviewer should check.
- PPAP Submission Level Requirements ReferenceA searchable table of the 18 PPAP elements and what is normally submitted or retained at each of the five submission levels.
Guides
- PPAP for Turned Parts Suppliers: What to Submit and How to Stay AheadPPAP for turned parts suppliers: the 18 elements, submission levels, Cpk studies, gauge R&R, control plans and how Swiss and screw machine shops stay ahead.
- ERP for Automotive Tier 1 and Tier 2 SuppliersERP for automotive Tier 1 and Tier 2 suppliers: IATF 16949, EDI 830 and 862 releases, PPAP, APQP and traceability requirements with implementation guidance.
- PPAP and IATF 16949 for Metal Stampers: Elements, Levels and PaperworkPPAP levels, the 18 elements, control plans, capability studies and IATF 16949 expectations for stamping suppliers, plus how to keep the paperwork manageable.
AI on your ERP
- Epicor Kinetic AI for Automotive Suppliers: EDI Releases, ASN, PPAP and Scorecard QuestionsPrivate AI on Epicor Kinetic for automotive suppliers: EDI releases, ASN, PPAP, scrap and scorecard questions answered in plain English from live data.
- AI on Infor SyteLine for Automotive SuppliersAI on Infor SyteLine for automotive suppliers: EDI releases, IATF 16949 records, PPAP, customer scorecards, and line-side shortages. On-prem or private cloud.