Pressure Test Record Report Template
Valves, manifolds, hoses and vessels often ship with a pressure test record. This template captures the parameters, the observations and the signatures in a format you can export and file.
Fill in
Pressure Test Record Report Template
Pressure Test Record
Company: Acme Precision Ltd Report no: PT-2026-0334 Test date: 2026-10-20 Item: Manifold block PN-77120, serial 0054
Test parameters
Medium: Water Design pressure: 250 bar (3626 psi) Test pressure: 375 bar (5439 psi) Hold time: 10 minutes Gauge: PG-14, calibration due 2027-01-15 Procedure: WI-TEST-09 and customer specification
Pressure log
| Time | Pressure | Temperature | Observation |
|---|---|---|---|
| Start | |||
| Mid hold | |||
| End hold |
Observations
No visible leakage, no pressure drop, no permanent deformation observed during the hold period.
Result
Result: Pass
Sign off
Test pressure factors and hold times come from the governing code, customer specification or your procedure. Pneumatic tests store far more energy than hydrostatic tests and need a safety review. This template is a record, not a procedure.
Automate customer data packs
Optional review of how test records could attach to serial numbers and shipments in your ERP.
Optional. The tool and every export work without this. No spam.
How to complete the record
Identify the item and serial number, then enter the medium, design pressure, test pressure and hold time from the governing procedure. Write the gauge ID and its calibration due date. During the test, log pressure and observations at the start, mid and end of the hold. Record the result and sign. Export to PDF for the customer data pack.
- Record both bar and psi to avoid unit errors
- Use a gauge in its calibration period
- Log the temperature for hydrostatic tests
- Keep the serial number on the record
Pressure units and conversions
One bar equals 14.5038 psi and 100 kPa. So 250 bar is about 3626 psi, and a 1.5 times test factor gives 375 bar, or 5439 psi. Many specifications set test pressure as a multiple of design or working pressure, such as 1.5 times for hydrostatic tests, but the factor varies by code and product. Take the factor from your governing document, and note the gauge range, since a reading is best taken in the upper part of the gauge scale.
Safety and quality notes
Hydrostatic tests are preferred because water stores little energy. Release trapped air before pressurizing, and use barriers and a controlled pressurization rate. Do not exceed the gauge range or the test pressure, and depressurize before touching a fitting. A pressure drop may be caused by temperature change, trapped air or a real leak, so record the cause when you accept or reject a result.
- Bleed air before pressurizing
- Control the ramp rate
- Never tighten fittings under pressure
Frequently Asked Questions
How do I convert bar to psi?
Multiply bar by 14.5038. For example 100 bar is 1450 psi. To convert psi to bar, divide by 14.5038. One bar also equals 100 kPa and about 0.1 MPa.
What is the usual hydrostatic test pressure?
Many codes and specifications use 1.5 times design or working pressure, but this varies with the code, product and material. Use the factor from your governing standard or customer document, not a general rule.
Why record the gauge calibration?
Because the test result is only as reliable as the gauge. Customers and auditors expect to see the gauge ID and calibration due date on the record, linking readings to a traceable instrument.
Is a pneumatic test acceptable?
Only where the specification allows it and a safety assessment is done. Compressed gas stores a lot of energy, so failure can be dangerous. Hydrostatic testing is the safer default when the product allows it.
If test records are filed by hand, we can help link them to ERP serial numbers and shipments so customer data packs build automatically.
Related Tools
Hardness Test Record Report Template
Record hardness readings by scale and location for a lot, compare to the requirement and sign off the result.
Quality & InspectionMaterial Certificate of Conformance Template
Generate a material CoC with purchase order, specification, heat lot, test results and a signed statement of conformance.
Quality & InspectionSupplier Incoming Inspection Results Log Worksheet
An editable log of incoming inspection by lot with sample size, defects found and reject rate per lot, plus overall totals for supplier quality reviews.
Engineering & PLMFastener Torque Spec Conversion Log Worksheet
Record each fastener torque once in ft-lb and get N-m, in-lb and kgf-m for work instructions across plants and suppliers.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- Hydrostatic Test Pressure CalculatorCompute the shop hydrotest pressure from design pressure and the allowable stress ratio, then check the gauge range you need on the test rig.
- Hydrostatic Test Report Template for Vessels and PipingFill-in hydrostatic test certificate with test pressure, medium, gauge calibration, hold time, results and signatures, exportable to PDF or Word.
- Hydrostatic Test Pressure and Water Volume CalculatorCompute test pressure from MAWP and lowest stress ratio, recommended gauge range, and the fill volume and water weight of a cylindrical vessel.