Quarantine Hold Tag Template
A hold tag is the physical control that stops suspect material from being used or shipped. This template creates a clear, printable tag with part, lot, reason, location and a release block, and exports to PDF or Word.
Fill in
Quarantine Hold Tag Template
HOLD TAG: DO NOT USE OR SHIP
Company: Acme Precision Ltd Tag number: HT-004172 Date tagged: 2026-10-20 Tagged by: R. Mehta, receiving inspector
Material
Part number: PN-48213 Description: Housing, machined Lot or work order: WO-55120 / Lot 26-3318 Quantity: 40 Held at: MRB cage, shelf C2 NCR or MRB reference: NCR-2026-0311
Reason for Hold
Bore diameter out of tolerance on 6 of 40 sampled pieces. Suspect lot held pending MRB.
Release
| Disposition | Date | Quantity | Authorized by |
|---|---|---|---|
Authorization
Only quality personnel named in your procedure should remove or release a hold tag. Many shops use red tags for reject and yellow for hold, set your own colour code in the quality manual. Starting point only.
Block suspect stock in your ERP automatically
Optional: see how an inspection failure can move stock to blocked status without manual steps.
Optional. The tool and every export work without this. No spam.
How to use the tag
Complete the identification fields, choose the status and describe the reason in a sentence a stores clerk can understand. Print the tag, attach it to the container, and move the material to the controlled area. Reference the NCR or MRB number so the tag points to the decision record. When the board releases the material, fill the release block with the disposition, quantity and authorizer, and file the tag with the nonconformance record.
Status and colour coding
Most systems separate hold, which means awaiting inspection or decision, from reject, which means nonconforming and awaiting scrap or return. Rework is its own state, because the material may move but only through an approved process. The status is printed in the tag heading so it is readable at a distance. Keep the number of statuses small and define them in your quality procedure, then train stores and production on what each one allows.
- Hold: awaiting inspection or a decision
- Quarantine: segregated suspect material
- Reject: confirmed nonconforming
- Rework: moves only under approved process
- Released: tag closed with authorization
Linking tags to the ERP
A tag on a box is not enough if the ERP still shows the stock as available. Move the quantity to a quarantine or blocked stock status or location in the system when the tag is applied, and release it with the same transaction trail. Record the tag number against the transaction so a physical audit and a system audit agree. Use quantity in the tag, not just a lot reference, since partial releases are common.
Common mistakes
Tags without a reason are ignored or removed. Tags attached to a pallet but not to the paperwork get separated. Material left in the normal aisle with a tag still gets used when production is under pressure, so use a physical segregated location. Never reuse a tag number, and do not release by writing OK on a tag without the disposition reference. Review open tags weekly so nothing sits for months.
Frequently Asked Questions
Who is allowed to release a hold tag?
Only people named in your quality procedure, usually quality personnel or the material review board. Production and stores should never remove a tag themselves. Record the authorizer and date in the release block.
What is the difference between hold and reject?
Hold means the material status is not yet decided. Reject means it has been confirmed nonconforming and awaits disposition such as scrap or return. The distinction helps people know whether the material may still be reworked or accepted.
Do I need a physical area as well as a tag?
Yes. A segregated, controlled location is the stronger control. Tags identify the material but do not stop someone from picking it up. Auditors expect both identification and segregation.
Should the tag number be in the ERP?
It helps. Putting the tag or NCR number on the stock transfer or blocked stock record lets you match physical tags to system balances during audits and cycle counts.
If your quarantine stock is tracked on paper tags and a spreadsheet, Netray can help connect hold status to the ERP so blocked stock cannot be issued.
Related Tools
MRB Material Review Board Disposition Form Template
A fill-in MRB form that records the nonconformance, the board's disposition, containment and approvals, with PDF and Word export.
Quality & InspectionReceiving Lot Acceptance Log Worksheet
A lot-by-lot log for incoming inspection. Enter sample size, accept number and defects found; accept or reject and defect rate are calculated.
Quality & InspectionInspection Work Instruction Template
A fill-in inspection instruction that tells inspectors what to check, with which gage, how often, and what to do on failure.
Quality & InspectionDefect Cost Tally Worksheet
Count defects by type and attach a cost per defect to see which failure modes drive the most scrap and rework cost.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- MRO Quarantine and Unserviceable Parts Tag TemplateCreate a clear tag and record for parts held as unserviceable, suspect or in quarantine, with reason and disposition.
- Nonconforming Material Hold Tag and Disposition Record TemplateA printable hold tag plus a disposition record for material that fails inspection, with approval lines for the review board.
- Order Credit Hold Release ChecklistA step by step checklist for deciding whether to release, partially release or keep a sales order on credit hold.
ERP fixes and how-tos
- NetSuite Quality Management: Incoming Inspection and QuarantineNetSuite has no full QMS, but inventory status, workflows and custom records give incoming inspection, quarantine and NCR tracking. Setup steps and limits.
- How to Sync an NCR From Your QMS to ERP Quarantine and MRB DispositionHow to wire a QMS nonconformance report to ERP inventory holds and MRB dispositions: quarantine on open, post scrap, rework or RTV on close, with the pitfalls.
- How to Release a Customer Order from Credit Hold in SyteLineFind why a SyteLine customer order is on credit hold, see who is authorized to release it, and set credit limits and days-past-due rules so it stops recurring.