Industry TemplatesFree worksheetPDF, Excel, Word exportJob Shops & Contract Manufacturing

Quote Follow-Up Cadence Tracker Worksheet

Quotes that go quiet are rarely lost on price alone. They are lost because nobody asked. This tracker keeps every open quote in one place, with a probability-weighted value and an automatic stale flag so follow-up becomes a routine instead of a memory test.

Free, optional. Reopen it on any device.
Download:
Quote #CustomerBuyer / contactSent dateQuote valueDays open (days)Follow-up touchesWin probability (%)Weighted valueStale (1 = yes)Next actionNext action date
$21,825
0
$10,440
1
$18,900
1
$24,850
0
Open quote value
$280,300
Probability-weighted value
$76,015
Stale quotes
2
Average touches per quote
1.75
Share of quotes stale
50%
Weighted value as share of open value
27.1%
A rough pipeline quality indicator.

Days open is typed in so the sheet works offline without a live clock. Common cadences: first touch within 2 to 3 business days of sending, a second at about day 7, and a decision request by day 14. Adjust the stale rule in your exported copy to match your sales cycle.

Automate stale-quote alerts from your ERP

Optional: ask for a review of how open quotes could be surfaced and nudged automatically.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the tracker

Add each quote the day you send it. Update days open and touches once a week, adjust win probability after any customer contact, and set a next action with a date. The weighted value column multiplies quote value by win probability, and the totals give you a pipeline view for sales meetings. Sort by the stale flag to build your follow-up call list for the day. Export to Excel to share with the sales team, or PDF for a weekly pipeline review.

The cadence logic

The stale flag follows a simple rule: a quote open more than 14 days with fewer than two follow-ups, or any quote older than 30 days, needs attention. Buyers at manufacturers often compare three to five quotes and decide in batches, so silence at day 10 usually means the file is sitting unread. A short, specific question such as asking whether the lead time works for their build schedule gets more replies than a generic check-in.

  • Touch 1 (day 2 to 3): confirm receipt and ask about clarifications.
  • Touch 2 (day 7): ask about decision timing and competing lead times.
  • Touch 3 (day 14): request a go or no-go and offer a revision.

Reading the totals

In the example, 280,300 dollars sits in open quotes but the weighted value is far lower. A large gap between open and weighted value means most of the pipeline is speculative. If more than a third of quotes are stale, estimating capacity is being spent on quotes that will not convert. Close out stale quotes with a polite final note so the pipeline stays honest and your hit rate stays measurable.

Common mistakes

Leaving dead quotes open inflates the pipeline and deflates hit rate. Setting every probability to 50 percent defeats the weighting. Another trap is following up only on the biggest quotes: small repeat customers often close fastest and fund the shop's cash flow.

Frequently Asked Questions

How often should I follow up on a manufacturing quote?

A reasonable pattern is a first touch within three business days, a second around day seven, and a decision request around day fourteen. After that, monthly touches or a polite close-out. Adjust for programs where buyers have known decision dates.

How do I choose a win probability?

Use stage-based defaults such as 10 percent for no response, 30 percent for acknowledged and in review, 50 percent for price discussion, and 75 percent for verbal intent. Calibrate to your actual hit rates over time.

Should I close out old quotes?

Yes. Mark them lost or no decision with a reason so win/loss analysis stays accurate. Leaving them open pollutes pipeline totals and makes your hit rate look better than it is.

Can I link this to my ERP?

You can paste exported quote lines from most ERP quote or opportunity screens into the sheet. The template does not connect to any system itself, so refresh the data before each weekly review.

If your ERP already stores quotes, we can help build an automatic stale-quote report and reminder feed. This worksheet works independently of any ERP.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Comparisons

Software