Sage Intacct XML readByQuery Request Generator
Sage Intacct exposes its data through an XML gateway. The readByQuery function is the workhorse for pulling vendors, customers, bills and accounts, and this generator produces a correct envelope.
Fill in
POST to https://api.intacct.com/ia/xml/xmlgw.phtml
<?xml version="1.0" encoding="UTF-8"?>
<request>
<control>
<senderid>mysenderid</senderid>
<password>SENDER_PASSWORD</password>
<controlid>readbyquery-001</controlid>
<uniqueid>false</uniqueid>
<dtdversion>3.0</dtdversion>
<includewhitespace>false</includewhitespace>
</control>
<operation>
<authentication>
<login>
<userid>ws_user</userid>
<companyid>MYCOMPANY</companyid>
<password>USER_PASSWORD</password>
</login>
</authentication>
<content>
<function controlid="f1">
<readByQuery>
<object>VENDOR</object>
<fields>VENDORID,NAME,STATUS</fields>
<query>STATUS = 'active'</query>
<pagesize>100</pagesize>
</readByQuery>
</function>
</content>
</operation>
</request>Send with Content-Type text/xml. The sender ID and password are issued to the integration developer and the web services user must be granted API access in Intacct. Field names vary by object, and large result sets are paged with readMore, so check the object reference for your release. Escape ampersands and angle brackets in query values.
Finance data integration review
Optional: an expert review of how you extract and use Intacct data.
Optional. The tool and every export work without this. No spam.
How to use the request
Enter your sender credentials, your web services user and company ID, then choose the object, the fields and an optional query. Post the output to the gateway URL from Postman, curl or your own code. Start with a small page size and a narrow query to check authentication, then widen the filter once it returns the rows you expect.
Structure of the envelope
A request has a control block that identifies the sender, and an operation block holding authentication and content. Inside content each function carries its own controlid so responses can be matched. readByQuery returns a result with a numremaining count and a resultId, and you continue with readMore until nothing remains. Sender and user are separate identities, which surprises many first-time developers.
- Use unique control IDs in batched requests
- Page with readMore, not a very large pagesize
- Store credentials outside source control
Common mistakes
Typical errors include confusing the sender ID with the user ID, forgetting to authorize the sender in the company's Web Services authorizations, and using display labels instead of object field names. Unescaped characters in the query cause malformed XML, and a company with multi-entity setup may need a location ID in the login block.
Frequently Asked Questions
What is the gateway URL?
Requests are posted to https://api.intacct.com/ia/xml/xmlgw.phtml as XML. The same endpoint accepts all functions, with the operation described inside the document.
What is the difference between sender and user?
The sender identifies the developer or application and is authorized per company. The user is the company user whose permissions the request runs under. Both are required.
How do I page through large results?
readByQuery returns a result ID and the number of records remaining. Call readMore with that result ID until the remaining count reaches zero.
Is there a newer API than XML?
Intacct also offers a REST API in newer releases. The XML gateway remains widely used, so confirm which suits your project and what your version supports.
If you pull Intacct data into planning or reporting regularly, we can help design a secure integration. Ask about an integration review.
Related Tools
Acumatica REST API Python Script Generator
Produce a ready-to-run Python script for the Acumatica contract-based REST API: login, PUT a record, then logout.
Other ERPsSage Intacct Objects and Standard Dimensions Reference
A searchable lookup of common Sage Intacct API object names and the standard dimensions used to tag transactions.
Other ERPsSage 300 Database Table Reference
A quick lookup of well-known Sage 300 SQL table names, the module they belong to and what each stores, for reports and integrations.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
Keep exploring
Free tools
- Sage Intacct Objects and Standard Dimensions ReferenceA searchable lookup of common Sage Intacct API object names and the standard dimensions used to tag transactions.
- Sage Intacct Dimension Design WorksheetAn editable worksheet for designing Intacct dimensions: which standard and custom dimensions to use, value counts, requirements and examples.
- Sage Intacct Month-End Close Time Savings CalculatorTurns close effort per entity into annual hours, cost and FTE, and shows the savings from a given automation rate.
ERP fixes and how-tos
- Sage X3 AI Integration On-Prem: A Private ArchitectureHow to add a private AI assistant to on-prem Sage X3: SQL read replica, Syracuse SData and web services, retrieval index, local GPU model and audit trail.
- Sage X3 API Documentation: REST (Syracuse), SOAP Web Services and Where to Find DocsSage X3 API options explained: Syracuse REST (SData), SOAP web services and where official documentation lives, plus guidance on choosing and securing access.
- How to Add AI to Sage 100 and Sage 300 On-PremPrivate AI architecture for on-prem Sage 100 and Sage 300: ODBC or SQL extracts, Sage 300 Web API, Sage 100 BOI, local GPU model, permissions and audit log.
Integrations
- How to connect Power BI to Sage X3Connect Power BI to Sage X3 through a warehouse, replica or API, use the on-prem gateway, build manufacturing dashboards and add natural-language questions.
- How to add AI agents to Sage X3How to add AI agents to Sage X3: a tool layer over SData and web services, read-first design, human approval on writes, and on-prem models for MRP and POs.