SAPFree referencePDF, Excel, Word exportSAP Business OneAll SAP Business One tools

SAP Business One Item, Warehouse and Batch Columns Reference

This is a column-level reference for the SAP Business One tables behind items, warehouse stock, price lists and batch and serial tracking. It complements the table-level B1 tables reference and applies to SAP Business One 10.0 on SQL Server and SAP HANA.

Download:
TableColumnData meaningExampleNotes
OITM
ItemCode
Item number (primary key)
A00001
HANA: "OITM"."ItemCode" in double quotes, case-sensitive.
OITM
ItemName
Item description
Hex bolt M8 x 30
Foreign name is FrgnName.
OITM
ItmsGrpCod
Item group code
101
Join OITB.ItmsGrpCod for ItmsGrpNam.
OITM
InvntItem
Inventory item flag
Y
N for service or non-stock items; they have no stock.
OITM
SellItem
Sales item flag
Y
Y or N.
OITM
PrchseItem
Purchase item flag
Y
Y or N.
OITM
OnHand
In stock, all warehouses
120
Sum of OITW.OnHand. Inventory UoM.
OITM
IsCommited
Committed by open sales orders and other demand, all warehouses
30
Spelled with one t: IsCommited.
OITM
OnOrder
Ordered from vendors or production, all warehouses
50
Open purchase orders and production orders.
OITM
EvalSystem
Valuation method
A
A moving average, S standard, F FIFO, B serial/batch.
OITM
AvgPrice
Item cost (company-level)
2.35
Use OITW.AvgPrice when warehouse-level costing is on.
OITM
ManBtchNum
Managed by batches
Y
Batch details in OBTN and OBTQ.
OITM
ManSerNum
Managed by serial numbers
N
Serial details in OSRN and OSRQ.
OITM
DfltWH
Default warehouse
01
May be empty; then the company default applies.
OITM
validFor / frozenFor
Active and inactive flags
Y / N
Combined with validFrom, validTo, frozenFrom, frozenTo dates.
OITM
InvntryUom
Inventory unit of measure text
EA
With UoM groups see UgpEntry and UGP1.
OITM
LastPurPrc
Last purchase price
2.40
LastPurCur holds its currency.
OITM
U_<name>
User-defined field
U_Grade
UDF definitions in CUFD.
OITW
ItemCode, WhsCode
Item and warehouse (key)
A00001, 01
One row per item and warehouse.
OITW
OnHand
In stock in this warehouse
80
Use OITW, not OITM, for stock by warehouse.
OITW
IsCommited
Committed in this warehouse
20
Same spelling as OITM.
OITW
OnOrder
Ordered into this warehouse
50
Available = OnHand - IsCommited + OnOrder.
OITW
AvgPrice
Warehouse item cost
2.31
Meaningful when costing by warehouse is enabled.
OITW
MinStock, MaxStock
Min and max inventory level
10, 200
Used by the inventory level alerts.
OITW
Locked
Warehouse locked for the item
N
Y blocks transactions for that item in that warehouse.
ITM1
ItemCode, PriceList
Item and price list number (key)
A00001, 1
One row per item per price list.
ITM1
Price, Currency
Price and its currency
4.50, USD
Join OPLN on PriceList = ListNum.
OPLN
ListNum, ListName
Price list number and name
1, Base Price
ListName is what users see.
OPLN
BASE_NUM, Factor
Base price list and factor
1, 1.2
Derived lists are base price times factor.
OINM
TransType, CreatedBy, BASE_REF
Object type, DocEntry and DocNum of the source document
15, 1234, 5001
Legacy inventory audit table. From 9.0 the valuation engine writes OIVL and IVL1; check how OINM is populated on your version.
OINM
ItemCode, Warehouse, DocDate, InQty, OutQty
Item, warehouse, posting date and quantity in or out
A00001, 01, 2026-10-01, 0, 5
Stock at a date = SUM(InQty - OutQty) up to that date.
OITL
LogEntry
Inventory transaction log key
8812
Header of the batch and serial log.
OITL
ItemCode, DocEntry, DocType, LocCode
Item, document entry, object type and warehouse
A00001, 77, 15, 01
DocType 15 is a delivery, 13 an A/R invoice, 20 a goods receipt PO.
OITL
DocQty, StockEff
Quantity and stock effect flag
-5, 1
StockEff 1 means the line affects stock.
ITL1
LogEntry, SysNumber, Quantity
Batch or serial line of the log entry
8812, 3, -5
Join ITL1.LogEntry = OITL.LogEntry.
ITL1
MdAbsEntry
Link to the batch or serial master record
412
Join OBTN.AbsEntry (batches) or OSRN.AbsEntry (serials).
OBTN
ItemCode, SysNumber, DistNumber
Item, internal number and batch number
A00001, 3, LOT-2610-07
DistNumber is the batch users see.
OBTN
ExpDate, MnfDate
Expiry and manufacturing date
2027-04-30, 2026-10-02
Use for FEFO and expiry reports.
OBTQ
ItemCode, WhsCode, SysNumber, Quantity
Batch quantity per warehouse
A00001, 01, 3, 45
Join OBTN on ItemCode and SysNumber, or MdAbsEntry = OBTN.AbsEntry.
OSRN
ItemCode, SysNumber, DistNumber
Serial number master
B10000, 15, SN-000915
MnfSerial holds the manufacturer serial.
OSRQ
ItemCode, WhsCode, SysNumber, Quantity
Serial quantity per warehouse (0 or 1)
B10000, 01, 15, 1
Quantity 1 means the serial is in that warehouse.
OBIN / OIBQ
AbsEntry, BinCode / ItemCode, BinAbs, OnHandQty
Bin locations and item quantity per bin
5, 01-A-01 / A00001, 5, 12
Only used when bin locations are enabled for the warehouse.

Column names follow the SAP Business One 10.0 SDK database table reference. On SAP HANA, table and column names are case-sensitive and must be in double quotes; on SQL Server they are not. Check the stock audit tables (OINM, OIVL) on your version before building valuation reports.

Get a stock query for your B1 database

Tell us what report you need and whether you run SQL Server or HANA, and we will send a tested query on these tables.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by table or column name. Each row gives the meaning, an example value and the trap to avoid. Columns are spelled exactly as in the database, including IsCommited with one t and ItmsGrpCod. On SQL Server write T0.ItemCode; on HANA write T0."ItemCode", because HANA keeps the mixed-case names and needs double quotes. To see the database column behind a field in the client, turn on View > System Information and hover over the field: the status bar shows table and column.

  • OITM: company-level totals per item.
  • OITW: the same quantities per warehouse.
  • OITL and ITL1: the batch and serial transaction log.

The availability formula

B1 shows Available as In Stock minus Committed plus Ordered, which in table terms is OnHand - IsCommited + OnOrder. Use OITW for a warehouse and OITM for the company total. Committed comes from open sales orders and other demand, and Ordered from open purchase orders and production orders. The formula is the same one the Inventory Status report and the item master availability use, so a query built on it should match the screen. If it does not, check for items with InvntItem = 'N', which carry no stock.

Worked example: batches with expiry by warehouse

To list batches on hand with expiry dates, join OBTQ to OBTN on ItemCode and SysNumber (or OBTQ.MdAbsEntry = OBTN.AbsEntry) and filter OBTQ.Quantity > 0. Add OITM for the item name and filter OITM.ManBtchNum = 'Y'. Sort by ExpDate for a FEFO list. To trace where a batch went, start from OBTN.AbsEntry, join ITL1 on MdAbsEntry, then OITL on LogEntry: OITL gives the DocType and DocEntry of each document, and StockEff = 1 limits the result to lines that moved stock.

Version differences and gotchas

OINM is the classic inventory audit table and many old reports use it. From release 9.0 the inventory valuation engine writes OIVL and IVL1, so confirm on your system how OINM is filled before you trust a valuation report built on it; quantities by date are usually still fine. OITM.AvgPrice is wrong for reporting when costing by warehouse is on: use OITW.AvgPrice. Bin tables OBIN and OIBQ are only filled for warehouses with bin locations enabled. User-defined fields carry the U_ prefix.

Frequently Asked Questions

What is the OITM table in SAP B1?

OITM is the item master data table. It holds the item code, name, group, inventory, sales and purchase flags, valuation method, batch and serial flags, and company-level stock totals OnHand, IsCommited and OnOrder. Stock per warehouse is in OITW.

What is the OINM table in SAP B1?

OINM is the inventory audit table: one row per stock movement with TransType (object type), CreatedBy (DocEntry), BASE_REF (DocNum), Warehouse, DocDate, InQty and OutQty. From 9.0 the valuation engine uses OIVL and IVL1, so check your version before using OINM for values.

What is the OITL table in SAP B1?

OITL is the inventory transaction log for batch and serial items: one row per document line with ItemCode, DocEntry, DocType, LocCode, DocQty and StockEff. ITL1 holds the batch or serial lines, linked to OBTN or OSRN through MdAbsEntry.

Which table stores price lists in SAP B1?

OPLN holds the price list header (ListNum, ListName, BASE_NUM, Factor). ITM1 holds the item prices with ItemCode, PriceList, Price and Currency. Join ITM1.PriceList = OPLN.ListNum.

If you want your team to ask SAP Business One stock and batch questions in plain English on your own server, Netray can set up that private AI layer.

Get SAP Business One alerts

Support and maintenance deadlines, release changes that affect SAP Business One sites, and new free SAP Business One tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP Business One: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP Business One? Start with the SAP Business One guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations

Comparisons

Software