SAP Batch Job Log and Spool Table Growth Calculator (TBTCO, TBTCP, TSP01, TST03)
This calculator estimates how much background job and spool data an SAP ECC 6.0 system keeps at steady state, from jobs per day and the retention you set in the standard reorganisation jobs. It shows row counts in TBTCO, TBTCP and TSP01 and the TemSe storage in TST03 or the file system.
Your numbers
Your results
Steady-state estimate assuming the reorganisation jobs run daily. Measure real averages in SP12 (TemSe administration) and SM37 before sizing.
Retained spool and TemSe MB vs spool retention days
Sweeps Spool retention (RSPO1041 / SAP_REORG_SPOOL) from 1 to 90, holding your other inputs fixed.
Want a housekeeping check of your ECC system?
Send us TBTCO and TSP01 counts and your SP12 TemSe figures and we will review retention variants and the standard job schedule.
Optional. The tool and every export work without this. No spam.
Which tables hold batch jobs and spool
Each background job has a header row in TBTCO with name, count, status, scheduler and start and end times, and one row per step in TBTCP with the program or command, variant and print parameters. Spool requests are listed in TSP01, and their content is a TemSe object, catalogued in TST01. Where spool data physically sits depends on the profile parameter rspo/store_location: db stores it in table TST03 in the database, G stores it as files in the global directory. Job logs are also TemSe objects but are kept as files, so they consume file system space, not TST03. SM37 reads TBTCO and TBTCP; SP01 reads TSP01; SP12 shows TemSe usage and runs consistency checks.
- TBTCO: job header and status, TBTCP: job steps
- TSP01: spool requests, TST01: TemSe objects
- TST03: TemSe data when rspo/store_location = db
- SM37, SP01, SP12 for monitoring
How the estimate is calculated
At steady state the reorganisation job deletes what is older than the retention, so retained rows equal daily volume x retention. TBTCO rows = jobs per day x job retention. TBTCP rows = jobs x average steps x job retention. TSP01 rows = jobs x spool share x spool retention, assuming one spool request per spooling job. Job log MB = jobs x log KB x job retention / 1024. Spool MB = spooling jobs x spool KB x spool retention / 1024. TST03 growth equals spool MB when spool data is stored in the database and zero when it is in files. Use real averages: SP12 TemSe data storage shows sizes by object type, and a count of TBTCO by end date shows your actual jobs per day.
Worked example
4,000 jobs a day, 1.5 steps each, 40% with spool output, 8 KB per job log, 50 KB per spool request, 14 days retention for both, spool in the database. TBTCO keeps 56,000 rows and TBTCP 84,000. TSP01 holds 22,400 requests. Job logs take about 438 MB of file system space and spool about 1,094 MB of TST03. Raising spool retention to 60 days pushes TST03 to roughly 4.7 GB. The chart sweeps spool retention from 1 to 90 days. If audit needs long retention for specific outputs, archive those to an optical archive or document management system rather than keeping all spool in TST03.
The standard housekeeping jobs
SAP delivers standard jobs you schedule in SM36 (Standard Jobs): SAP_REORG_JOBS runs RSBTCDEL2 to delete old jobs and their logs; SAP_REORG_SPOOL runs RSPO0041, or the newer RSPO1041, to delete old spool requests; SAP_REORG_ORPHANED_JOBLOGS runs RSTS0024 for job logs whose job no longer exists; and SAP_SPOOL_CONSISTENCY_CHECK runs RSPO1043 to remove inconsistent spool objects. Run them daily with variants per retention class, for example shorter retention for frequent technical jobs. Missing housekeeping is a common cause of slow SM37 and SP01 and of a large TST03.
Frequently Asked Questions
What is the SAP batch job log table?
Job logs are not stored in a normal table row. They are TemSe objects kept as files in the global directory, displayed from SM37. The job header with status is in TBTCO and the steps in TBTCP. Deleting old jobs with RSBTCDEL2 also removes their logs; RSTS0024 cleans orphaned logs.
Which table stores the spool of an SAP batch job?
TBTCP holds the step and its print parameters, TSP01 lists spool requests with the creating user and date, and the spool content is a TemSe object catalogued in TST01. Content sits in TST03 when rspo/store_location is db, or in files when it is G. SP01 shows spool requests by job or user.
What are the main SAP batch job tables?
TBTCO (job header and status), TBTCP (job steps), TBTCS (time-scheduled jobs for the batch scheduler) and BTCEVTJOB (jobs waiting for events). For spool, TSP01 lists requests, TST01 catalogs TemSe objects and TST03 stores TemSe data in the database.
How do I monitor SAP batch jobs?
Use SM37 to list jobs by name, user, status and date, and open the log for failures. SM36 schedules jobs and the standard housekeeping jobs. For volume, count TBTCO rows by status and end date. Many teams also send cancelled job alerts through CCMS or Solution Manager.
If your operations team wants to ask which jobs failed overnight and why in plain English against ECC on your own servers, we can set up a private, read-only AI layer over TBTCO and the job logs.
Related Tools
SAP ECC Classic MRP Run (MD01/MDBT) Runtime Simulator
Enter materials in scope, net change share, processing key, measured milliseconds per material and parallel processes to estimate the MRP job runtime and whether it fits the night window.
Developer ToolsSAP ECC BAPI Mass Load Runtime and Commit Size Calculator
Enter records, measured milliseconds per BAPI call and per commit, records per commit and parallel tasks to estimate load runtime, compare with BDC and size error rework.
Developer ToolsSAP ECC Order System Status ABAP Generator (JEST, TJ02T, STATUS_TEXT_EDIT)
Fill in plant, order type and the statuses to include and exclude, and get a working ABAP report that reads AUFK, JEST, TJ02T and TJ30T and prints the status line with STATUS_TEXT_EDIT.
SAPSAP ECC EHP8 Upgrade SPDD/SPAU Adjustment Effort and Downtime Simulator
Enter SPDD and SPAU object counts, minutes per object, custom objects to retest and SUM downtime, and get adjustment hours per cycle, total effort and development outage.
More SAP tools
See all- SAP ECC Private AI Layer Blueprint Generator
- SAP ECC AI Assistant Sizing and Value Calculator
- SAP ECC SD User Exit Forms Reference (MV45AFZZ, RV60AFZZ, MV50AFZ1)
- SAP ECC Customer Exits (SMOD Enhancements) by Module Reference
- SAP ECC Classic BAdI Definitions Reference (MIGO, ME21N, MIRO, Deliveries, PM Orders)
- SAP ECC Background Job Tables Reference (TBTCO, TBTCP, Job Status Codes)
- SAP ECC Output Determination Tables and Codes Reference (NAST, TNAPR, NACE)
- SAP ECC Movement Type Configuration Tables Reference (T156, T156T, T157D)
- SAP ECC Stock Type and Location Transfer Movement Type Matrix
New to SAP ECC 6.0? Start with the SAP ECC 6.0 guide and toolkit, or plan with SAP ECC to S/4HANA Conversion Planner, Training Path Builder, Upgrade Path Planner.
Keep exploring
Free tools
- SAP ECC Background Job Tables Reference (TBTCO, TBTCP, Job Status Codes)Reference of the tables behind SM37 on SAP ECC 6.0: job header, steps, schedules, events, spool and variants, with joins, plus the TBTCO-STATUS values.
- SAP ECC SM36 Standard Housekeeping Jobs ChecklistCheck that every standard SAP ECC housekeeping job is scheduled with the right program and frequency, plus the common interface and application jobs.
- SAP ECC Background Job History ABAP Query Generator (TBTCO + TBTCP)Fill in a job name pattern, program, status and date range and get a classic ABAP report that joins TBTCO and TBTCP, computes runtime, reads the job log of cancelled jobs and shows the result in ALV.
ERP fixes and how-tos
- ERP Data Archiving Strategy: What to Archive and What to PurgeHow to decide what ERP data to archive or purge: find the big tables, set retention by record type, keep reports and audits working, and test restores first.
- Printer Not Working in SAP: Troubleshooting Spool Requests with SP01 and SPADFix a printer not working in SAP: read the spool request in SP01, check the output device and access method in SPAD, spool work processes and user defaults.
Integrations
- How to connect Claude to SAP ECC 6.0Connect Claude to SAP ECC 6.0 through an MCP connector, the Anthropic API, AWS Bedrock or Google Vertex, and see when an on-prem open model is the better fit.
- How to use ChatGPT with SAP ECC 6.0Using ChatGPT with SAP ECC 6.0: custom GPT actions, exports versus live access, an OData or MCP bridge, enterprise data controls, and when a private model is safer.