SAPFree referencePDF, Excel, Word exportSAP ECC 6.0All SAP ECC 6.0 tools

SAP SD Output Tables: NAST, TNAPR, Applications, Media and Output Types

A searchable reference of NAST-based output control on SAP ECC 6.0 for SD and MM: the tables, application codes, transmission media, processing status values and standard output types with driver programs. Use it when an invoice did not print or an EDI order response did not leave.

Download:
SectionCode or tableMeaningKey fields or programWhere maintainedNote
Tables
NAST
Output status records, one per output per document
KAPPL, OBJKY, KSCHL, SPRAS, PARNR, PARVW, ERDAT, ERUHR; NACHA, VSTAT, DATVR, UHRVR, CMFPNR
Created by determination or manually in VA02, VL02N, VF02, ME22N output screens
OBJKY holds the document number (e.g. VBELN padded)
Tables
TNAPR
Processing programs and forms per output type and medium
KAPPL, KSCHL, NACHA; PGNAM, RONAM, FONAM, SFORM
NACE > Output types > Processing routines
FONAM is a SAPscript form, SFORM a Smart Form or PDF form
Tables
T685
Condition types, including output types (usage B)
KVEWE, KAPPL, KSCHL
NACE > Output types
Output types share the condition technique with pricing
Tables
T685B
Additional output type data: dispatch time, medium, partner
KAPPL, KSCHL; VSZTP (dispatch time), NACHA (medium), PARVW (partner function), PARAB (partner-independent)
NACE > Output types > Default values
Defaults copied into new NAST records
Tables
T683
Procedures (output determination procedures for usage B)
KVEWE, KAPPL, KALSM
NACE > Procedures
Assigned to order, delivery or billing types
Tables
T682
Access sequences
KVEWE, KAPPL, KOZGF
NACE > Access sequences
Sequence of condition tables searched
Tables
Bnnn
Output condition tables holding condition records
KAPPL, KSCHL, key fields of the table
VV11/VV12 (sales), VV21 (shipping), VV31 (billing), MN04 (PO); or NACE > Condition records
Find the table number in the access sequence
Tables
CMFP
Collected error messages from output processing
APLID, NR, MSGTY, MSGNR, MSGV1
Read via output processing log in the document output screen
NAST-CMFPNR points to CMFP-NR
Applications (KAPPL)
V1
Sales
Order confirmation BA00
NACE
Sales documents VA01 to VA03
Applications (KAPPL)
V2
Shipping
Delivery note LD00
NACE
Outbound deliveries
Applications (KAPPL)
V3
Billing
Invoice RD00
NACE
Billing documents
Applications (KAPPL)
V5
Groups
Group output for collective processing
NACE
Used with VG01 groups
Applications (KAPPL)
V7
Transport
Shipment documents
NACE
VT01N shipments
Applications (KAPPL)
EA
Purchasing RFQ
RFQ output
NACE
ME41 to ME43
Applications (KAPPL)
EF
Purchase order
NEU
NACE, MN04 to MN06
ME21N to ME23N
Applications (KAPPL)
EL
Purchasing scheduling agreement
Delivery schedule output
NACE
ME38, ME9E
Applications (KAPPL)
EV
Purchasing outline agreement
Contract output
NACE
ME31K
Applications (KAPPL)
ME
Inventory management
GR/GI slips WE01, WE02, WE03
NACE
Material document output
Media (NACHA)
1
Print output
Spool via LDEST
TNAPR, NAST
Most common
Media (NACHA)
2
Fax
SAPconnect
TNAPR, NAST
Needs fax number on partner
Media (NACHA)
5
External send
SAPconnect (mail, fax)
TNAPR, NAST
Common for PDF by email
Media (NACHA)
6
EDI
IDoc via partner profile WE20
TNAPR, NAST
Program RSNASTED with routine EDI_PROCESSING
Media (NACHA)
7
Simple mail
SAP office mail
TNAPR, NAST
Internal notification
Media (NACHA)
8
Special function
Custom routine in TNAPR
TNAPR, NAST
Used for custom processing
Media (NACHA)
9
Events (SAP Business Workflow)
Workflow event
TNAPR, NAST
Triggers a workflow event
Media (NACHA)
A
Distribution (ALE)
ALE distribution model
TNAPR, NAST
Program RSNASTED
Media (NACHA)
T
Tasks (SAP Business Workflow)
Workflow task
TNAPR, NAST
Starts a workflow task
Processing status (VSTAT)
0
Not processed
Waiting for dispatch time or RSNAST00
NAST
Dispatch time 1 or 2 records wait for RSNAST00
Processing status (VSTAT)
1
Successfully processed
DATVR, UHRVR set
NAST
Repeat output creates a new record
Processing status (VSTAT)
2
Incorrectly processed
Errors in CMFP
NAST
Check the processing log
Standard output types
BA00
Order confirmation (V1)
RVADOR01, routine ENTRY, form RVORDER01
NACE V1
Copy to Z before changing
Standard output types
LD00
Delivery note (V2)
RVADDN01, routine ENTRY, form RVDELNOTE
NACE V2
Copy to Z before changing
Standard output types
RD00
Invoice (V3)
RVADIN01, routine ENTRY, form RVINVOICE01
NACE V3
Copy to Z before changing
Standard output types
NEU
Purchase order (EF)
SAPFM06P, routine ENTRY_NEU, form MEDRUCK
NACE EF
Copy to Z before changing

Media 4 (telex) also exists in the NACHA domain but is no longer used. Program RSNAST00 processes NAST records that wait for dispatch time 1 or 2 and can reprocess records in background. Confirm driver programs in TNAPR on your system: many installations replace forms with Z Smart Forms.

Get your output setup checked

Send us extracts of NAST errors and TNAPR for your SD and MM output types and we will point out dispatch, form and EDI issues.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Filter by Section. To trace one document, query NAST with KAPPL and OBJKY equal to the document number, padded with leading zeros to 10 digits. VSTAT tells you whether it was processed, NACHA which medium, and CMFPNR points to the error log in CMFP. Then read TNAPR with KAPPL, KSCHL and NACHA to see which program, routine and form ran. The configuration chain (procedure in T683, output type in T685/T685B, access sequence in T682, condition records in Bnnn) explains why a record was or was not determined.

Where this lives in ECC

NACE is the central transaction: choose the application (V1, V2, V3, EF and so on), then output types, procedures, access sequences and condition records. Condition records can also be maintained per area: VV11 to VV13 for sales, VV21 to VV23 for shipping, VV31 to VV33 for billing and MN04 to MN06 for purchase orders. Determination procedures are assigned to document types in SPRO under each module's output control. In each document, the output screen (Extras > Output) shows the NAST records and the Determination analysis button shows which access succeeded.

  • NACE: all output configuration by application
  • VV11, VV21, VV31, MN04: condition records
  • RSNAST00: process or reprocess output in background
  • Determination analysis: why a record was or was not created

Worked example: invoice not printed

A user reports that invoice 90012345 did not print. NAST with KAPPL V3, OBJKY 0090012345 shows KSCHL RD00, NACHA 1, VSTAT 0 and dispatch time 1. Nothing is wrong with the form: the record waits for RSNAST00, which is not scheduled for V3 in this client. If VSTAT is 2, open the processing log from VF02 output screen or read CMFP with NR = NAST-CMFPNR to see the message, often a missing output device or form error. If no NAST row exists, run determination analysis to see which condition record is missing.

Gotchas

OBJKY is character, so selections must use the padded number. A repeated output creates a new NAST row rather than updating the old one, so expect several rows per document. EDI output (medium 6) succeeds in NAST when the IDoc is created, not when it reaches the partner; check WE02 for IDoc status. Changing SAP standard forms or RVADIN01 directly is a modification; copy to Z names and point TNAPR at them. In S/4HANA, BRF+ output management can replace NAST for some documents, which this table does not cover.

Frequently Asked Questions

Which table stores output in SAP SD?

NAST stores the output status records for sales orders, deliveries, billing and purchasing documents, keyed by application (KAPPL), object key (OBJKY), output type (KSCHL), language and partner. TNAPR holds the processing program and form per output type and medium.

Which table stores output types in SAP?

Output types are condition types with usage B in T685, with additional default data such as dispatch time and medium in T685B. Processing programs and forms are in TNAPR. All are maintained in NACE by application.

What do the NAST VSTAT values mean?

VSTAT 0 means not processed yet (often waiting for RSNAST00 because of dispatch time), 1 means successfully processed and 2 means processed with errors. For errors, NAST-CMFPNR points to the message log in CMFP, also visible in the document's output processing log.

What are the output medium codes in NAST?

NACHA values: 1 print output, 2 fax, 4 telex, 5 external send, 6 EDI, 7 simple mail, 8 special function, 9 events (workflow), A distribution (ALE) and T tasks (workflow). The medium decides which TNAPR row and program run.

If you want support staff to ask why an invoice or PO did not go out and get the NAST and log answer in plain English on your own servers, we can build that.

Get SAP ECC 6.0 alerts

Support and maintenance deadlines, release changes that affect SAP ECC 6.0 sites, and new free SAP ECC 6.0 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP ECC 6.0: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP ECC 6.0? Start with the SAP ECC 6.0 guide and toolkit, or plan with SAP ECC to S/4HANA Conversion Planner, Training Path Builder, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations