SAPFree referencePDF, Excel, Word exportSAP ECC 6.0All SAP ECC 6.0 tools

SAP ECC BAdI List for MIGO, ME21N, MIRO, Deliveries and PM Orders

A searchable reference of widely used BAdI definitions on SAP ECC 6.0 for purchasing, goods movements, invoice verification, deliveries, production and maintenance orders and FI. Each row gives the interface, the methods you are most likely to implement and where errors can be raised.

Download:
BAdI definitionTypeInterfaceKey methodsTransactionsTypical useNote
ME_PROCESS_PO_CUST
Classic (SE18)
IF_EX_ME_PROCESS_PO_CUST
INITIALIZE, OPEN, PROCESS_HEADER, PROCESS_ITEM, PROCESS_SCHEDULE, PROCESS_ACCOUNT, CHECK, POST, CLOSE
ME21N, ME22N, ME23N
Field changes and checks on Enjoy POs through the IF_PURCHASE_ORDER_MM objects
Use SET_DATA on the item object, not direct assignment; messages through MMPUR_MESSAGE macros
ME_GUI_PO_CUST
Classic (SE18)
IF_EX_ME_GUI_PO_CUST
SUBSCRIBE, MAP_DYNPRO_FIELDS, TRANSPORT_FROM_MODEL, TRANSPORT_TO_DYNP, TRANSPORT_FROM_DYNP, TRANSPORT_TO_MODEL
ME21N, ME22N, ME23N
Custom tab on PO header or item without MM06E005
Pair with ME_PROCESS_PO_CUST to validate the fields
ME_PROCESS_REQ_CUST
Classic (SE18)
IF_EX_ME_PROCESS_REQ_CUST
INITIALIZE, OPEN, PROCESS_HEADER, PROCESS_ITEM, PROCESS_ACCOUNT, CHECK, POST, CLOSE
ME51N, ME52N, ME53N
Checks and defaults on Enjoy requisitions
Same object model as the PO BAdI with IF_PURCHASE_REQUISITION_ITEM
ME_REQ_POSTED
Classic (SE18)
IF_EX_ME_REQ_POSTED
POSTED
ME51N, ME52N
Follow-up actions after a requisition is posted
Read-only view of the posted data
ME_PURCHDOC_POSTED
Classic (SE18)
IF_EX_ME_PURCHDOC_POSTED
POSTED
ME21N, ME22N
Follow-up after a purchasing document is saved, e.g. Z log
Not for changing PO data
ME_CHANGE_OUTTAB_CUS
Classic (SE18)
IF_EX_ME_CHANGE_OUTTAB_CUS
FILL_OUTTAB
ME2N, ME2M, ME2L
Fill extra columns in purchasing list reports
Fields must first be appended to the ALV output structure
ME_DEFINE_CALCTYPE
Classic (SE18)
IF_EX_ME_DEFINE_CALCTYPE
DEFINE_CALCTYPE
ME21N, ME22N
Control the pricing type used when PO data changes
Affects repricing, test with price changes
MB_MIGO_BADI
Classic (SE18)
IF_EX_MB_MIGO_BADI
INIT, PBO_DETAIL, PAI_DETAIL, PBO_HEADER, PAI_HEADER, LINE_MODIFY, CHECK_ITEM, CHECK_HEADER, POST_DOCUMENT, RESET
MIGO
Custom tab in MIGO, item defaults, checks and posting of Z data
Errors belong in CHECK_ITEM or CHECK_HEADER via the returned message table
MB_MIGO_ITEM_BADI
Classic (SE18)
IF_EX_MB_MIGO_ITEM_BADI
ITEM_MODIFY
MIGO
Default item fields such as storage location or text
Only certain fields can be changed
MB_CHECK_LINE_BADI
Classic (SE18)
IF_EX_MB_CHECK_LINE_BADI
CHECK_LINE
MIGO, MB1A, MB1B, MB1C
Item-level validation of goods movements with error messages
Right place for blocking errors before update
MB_DOCUMENT_BADI
Classic (SE18)
IF_EX_MB_DOCUMENT_BADI
MB_DOCUMENT_BEFORE_UPDATE, MB_DOCUMENT_UPDATE
MIGO and all goods movements
Read final MKPF and MSEG data and update Z tables
No MESSAGE type E here; MB_DOCUMENT_UPDATE runs in the update task
INVOICE_UPDATE
Classic (SE18)
IF_EX_INVOICE_UPDATE
CHANGE_AT_SAVE, CHANGE_BEFORE_UPDATE, CHANGE_IN_UPDATE
MIRO, MIR7
Checks at save and Z updates for logistics invoices
Raise errors in CHANGE_AT_SAVE, not in the update methods
MRM_HEADER_DEFAULT
Classic (SE18)
IF_EX_MRM_HEADER_DEFAULT
HEADER_DEFAULT_SET
MIRO
Default invoice header fields such as document type
Called at start of entry
MRM_PAYMENT_TERMS
Classic (SE18)
IF_EX_MRM_PAYMENT_TERMS
PAYMENT_TERMS_SET
MIRO
Set payment terms, baseline date or block in invoice
Check against vendor master terms
LE_SHP_DELIVERY_PROC
Classic (SE18)
IF_EX_LE_SHP_DELIVERY_PROC
CHANGE_DELIVERY_HEADER, CHANGE_DELIVERY_ITEM, CHECK_ITEM_DELETION, DELIVERY_FINAL_CHECK, SAVE_DOCUMENT_PREPARE, SAVE_AND_PUBLISH_DOCUMENT, FILL_DELIVERY_ITEM
VL01N, VL02N, VL10 series
BAdI replacement for most MV50AFZ1 form exits
Errors are returned in the CT_FINCHDEL table in DELIVERY_FINAL_CHECK
LE_SHP_DELIVERY_UPDATE
Classic (SE18)
IF_EX_LE_SHP_DELIVERY_UPDATE
UPDATE_HEADER, UPDATE_ITEM
VL01N, VL02N
Update Z tables with delivery data
Runs during update, no dialog
LE_SHP_TAB_CUST_HEAD
Classic (SE18)
IF_EX_LE_SHP_TAB_CUST_HEAD
ACTIVATE_TAB_PAGE, TRANSFER_DATA_TO_SUBSCREEN, TRANSFER_DATA_FROM_SUBSCREEN, PASS_FCODE_TO_SUBSCREEN
VL01N, VL02N, VL03N
Custom tab on delivery header
Item version: LE_SHP_TAB_CUST_ITEM
LE_SHP_TAB_CUST_ITEM
Classic (SE18)
IF_EX_LE_SHP_TAB_CUST_ITEM
ACTIVATE_TAB_PAGE, TRANSFER_DATA_TO_SUBSCREEN, TRANSFER_DATA_FROM_SUBSCREEN, PASS_FCODE_TO_SUBSCREEN
VL01N, VL02N, VL03N
Custom tab on delivery item
Needs a subscreen in your own program
WORKORDER_UPDATE
Classic (SE18)
IF_EX_WORKORDER_UPDATE
INITIALIZE, AT_SAVE, AT_RELEASE, BEFORE_UPDATE, IN_UPDATE
CO01, CO02, IW31, IW32
Checks at save or release of production and maintenance orders
Errors in AT_SAVE and AT_RELEASE; BEFORE_UPDATE and IN_UPDATE are too late
WORKORDER_GOODSMVT
Classic (SE18)
IF_EX_WORKORDER_GOODSMVT
GOODS_RECEIPT, COMPLETE_GOODSMOVEMENT
CO11N, CO15, MIGO (order GR)
Change goods movements created by order confirmation
Check the full method list in SE18 for backflush scenarios
WORKORDER_CONFIRM
Classic (SE18)
IF_EX_WORKORDER_CONFIRM
AT_SAVE, AT_CANCEL_CHECK, IN_UPDATE
CO11N, CO15
Validate confirmations or block cancellations
Raise errors in AT_SAVE
WORKORDER_INFOSYSTEM
Classic (SE18)
IF_EX_WORKORDER_INFOSYSTEM
TABLES_MODIFY_LAY
COOIS, COOISPI
Fill custom columns in the order information system
Fields go into the layout structure appends, e.g. IOHEADER
BADI_MATERIAL_CHECK
Classic (SE18)
IF_EX_BADI_MATERIAL_CHECK
CHECK_DATA
MM01, MM02
Material master validation at save
Alternative to SMOD MGA00001
CUSTOMER_ADD_DATA
Classic (SE18)
IF_EX_CUSTOMER_ADD_DATA
CHECK_ALL_DATA, SAVE_DATA, CHECK_ADD_ON_ACTIVE
XD01, XD02, VD01, FD01
Custom fields on customer master with screen group setup
Screens via CUSTOMER_ADD_DATA_CS
VENDOR_ADD_DATA
Classic (SE18)
IF_EX_VENDOR_ADD_DATA
CHECK_ALL_DATA, SAVE_DATA, CHECK_ADD_ON_ACTIVE
XK01, XK02, MK01, FK01
Custom fields on vendor master
Screens via VENDOR_ADD_DATA_CS
AC_DOCUMENT
Classic (SE18)
IF_EX_AC_DOCUMENT
CHANGE_INITIAL, CHANGE_AFTER_CHECK
Postings from MM, SD, CO to FI
Change FI document fields from the accounting interface, e.g. item text
Only fields SAP allows to change; see the BAdI documentation in SE18
ACC_DOCUMENT
Classic (SE18)
IF_EX_ACC_DOCUMENT
CHANGE
BAPI_ACC_DOCUMENT_POST and related BAPIs
Move EXTENSION2 data into the accounting document
Filter-dependent by AWTYP; SAP ships example implementations
BADI_FDCB_SUBBAS01
Classic (SE18)
IF_EX_BADI_FDCB_SUBBAS01
PUT_DATA_TO_SCREEN_OBJECT, GET_DATA_FROM_SCREEN_OBJECT
FB60, FB70, MIRO
Custom subscreen on the basic data tab of Enjoy FI entry
Further variants (BADI_FDCB_SUBBAS02 and higher) exist for other subscreens

All rows are classic BAdIs maintained in SE18 and implemented in SE19 on ECC 6.0; newer kernel BAdIs belong to enhancement spots and are called with GET BADI / CALL BADI. Check multiple-use and filter settings for each definition in SE18 before creating a second implementation.

Map your active BAdI implementations

Send us an extract of SXC_ATTR and SXC_EXIT and we will return your active implementations by process with notes on update-task risks.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by transaction or object. Pick the method that runs at the moment you need: a dialog check needs a method that runs before the update task, such as CHECK_ITEM in MB_MIGO_BADI, CHECK_LINE in MB_CHECK_LINE_BADI or AT_SAVE in WORKORDER_UPDATE. Z table updates belong in update-time methods such as MB_DOCUMENT_UPDATE or LE_SHP_DELIVERY_UPDATE methods. Then open the definition in SE18, read its documentation and the multiple-use flag, and create the implementation in SE19 with a Z class.

Finding a BAdI on ECC

For classic BAdIs, set a breakpoint in method GET_INSTANCE of class CL_EXITHANDLER in SE24, run the transaction and read the EXIT_NAME parameter at each stop; that lists every classic BAdI the transaction asks for. SE84 > Enhancements > Business Add-ins searches by package. An ST05 SQL trace filtered on views V_EXT_IMP and V_EXT_ACT also shows the classic BAdIs looked up. For kernel BAdIs, search the program for GET BADI and use SE18 with the enhancement spot.

  • SE24: breakpoint in CL_EXITHANDLER=>GET_INSTANCE
  • SE84: repository search for BAdIs by package
  • ST05: trace reads on V_EXT_IMP and V_EXT_ACT
  • SE19: list implementations and active status

Worked example: blocking a MIGO posting

A plant wants to block goods issues to cost centers without a reason code. Coding MESSAGE type E in MB_DOCUMENT_BADI MB_DOCUMENT_BEFORE_UPDATE gives a short dump or update termination, because the document is already in the posting phase. Instead implement MB_CHECK_LINE_BADI CHECK_LINE (or MB_MIGO_BADI CHECK_ITEM, which returns a message table to MIGO) and return the error when BWART is 201 and GRUND is initial. The user sees the error in MIGO with the line highlighted and can fix it before posting.

Version differences and gotchas

ME_PROCESS_PO_CUST changes must go through the object methods (GET_DATA and SET_DATA); assigning to the structure directly is ignored. Some BAdIs are single-use, so a second active implementation is refused; check SE18 before adding one beside a partner implementation. Filter-dependent BAdIs such as ACC_DOCUMENT need the right filter value or the implementation never runs. Enhancement packages added new kernel BAdIs in some areas, so search enhancement spots on your EHP level too.

Frequently Asked Questions

Which BAdI is used for MIGO?

MB_MIGO_BADI is the main MIGO BAdI: it adds a custom tab and has methods such as LINE_MODIFY, CHECK_ITEM and POST_DOCUMENT. MB_MIGO_ITEM_BADI defaults item fields, MB_CHECK_LINE_BADI validates lines, and MB_DOCUMENT_BADI reads the posted material document for follow-up updates.

Why can't I raise an error message in MB_DOCUMENT_BADI?

Its methods run while the material document is being posted, and MB_DOCUMENT_UPDATE runs in the update task. A MESSAGE type E there terminates the update instead of returning to the screen. Put blocking checks in MB_CHECK_LINE_BADI or MB_MIGO_BADI CHECK_ITEM, which run before posting.

What BAdI is used for ME21N?

ME_PROCESS_PO_CUST handles checks and field changes, with PROCESS_ITEM for item changes and CHECK for document-level validation. ME_GUI_PO_CUST adds custom screens. ME_PURCHDOC_POSTED runs after save. SMOD MM06E005 is the older exit route for custom fields.

What is the BAdI for MIRO?

INVOICE_UPDATE with CHANGE_AT_SAVE for checks and CHANGE_BEFORE_UPDATE or CHANGE_IN_UPDATE for follow-up updates. MRM_HEADER_DEFAULT and MRM_PAYMENT_TERMS set defaults, and BADI_FDCB_SUBBAS01 adds a subscreen to the basic data tab.

If you want your developers to ask ECC which BAdI implementations are active and what they change, in plain English on your own servers, we can set that up.

Get SAP ECC 6.0 alerts

Support and maintenance deadlines, release changes that affect SAP ECC 6.0 sites, and new free SAP ECC 6.0 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP ECC 6.0: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP ECC 6.0? Start with the SAP ECC 6.0 guide and toolkit, or plan with SAP ECC to S/4HANA Conversion Planner, Training Path Builder, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations