SAPFree calculatorPDF, Excel, Word exportSAP EWMWarehousing

Replenishment Min/Max Calculator for SAP EWM and WM

An empty pick face stops a picker and often a whole wave. This calculator derives the minimum and maximum quantities for a fixed pick bin so replenishment starts early enough and the bin never overflows.

Your numbers

units
hours
2 hours

From the trigger to stock arriving in the pick bin, including task creation, travel and putaway.

25 %

Covers demand spikes during the response time.

units
units

Usually a case, layer or full pallet quantity.

Your results

Minimum quantity (trigger)
94
Replenishment should start when bin stock drops to this level.
Replenishments per day
5
Demand rate per pick hour
37.5
Maximum quantity
480
Days of cover in a full bin
1 days
Headroom above trigger
386
Must be at least the replenishment quantity, or the bin overflows.

Assumes steady demand. For erratic items, raise the safety margin or use statistical safety stock.

Free, optional. Reopen it on any device.
Save results:

Minimum quantity vs response time

Sweeps Replenishment response time from 0.5 to 8, holding your other inputs fixed.

Pick face stockout analysis

An optional review of empty pick face events and replenishment delays from your warehouse task data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter the daily demand for the item in pick units and the hours per day that picking happens. Then enter how long replenishment realistically takes from trigger to stock in the bin. Add a safety margin for demand peaks, the bin capacity and the quantity moved per replenishment. The result gives the minimum quantity that should trigger replenishment, the maximum, days of cover and how often replenishment will run. Check that the headroom between minimum and maximum is at least one replenishment quantity.

The formula

Demand per pick hour equals daily units divided by pick hours. The minimum equals that rate multiplied by response time and by one plus the safety margin, rounded up. The maximum is the capacity of the bin. The number of replenishments per day equals daily demand divided by the replenishment quantity. This is a classic reorder point model applied to a pick face, where the lead time is the internal replenishment response rather than a supplier lead time.

  • Minimum = demand per hour x response hours x (1 + safety)
  • Maximum = bin capacity
  • Replenishments per day = daily units / replenishment quantity

Where it fits in SAP

In EWM, replenishment control for fixed bins uses minimum and maximum quantities on the product warehouse data, and the replenishment run creates warehouse tasks for the shortfall. In classic WM, fixed bin assignments with minimum, maximum and replenishment quantities in the material master storage type data drive the replenishment from reserve storage. Whichever you use, schedule the run frequently enough that the response time you entered is real, not wishful.

Common mistakes

The most frequent error is a response time based on the best case. If your replenishment tasks wait in a queue for a forklift driver, include that wait. Another is setting the maximum at a full bin when the replenishment quantity does not divide neatly, leading to partial pallets that block the face. Finally, do not use the same settings for fast and slow movers: re-run the tool per item class and slot the fastest items closest to the pick path.

Frequently Asked Questions

What if the minimum is bigger than the bin allows?

Then the bin is too small for the item's velocity or the response time is too long. Increase the bin size, shorten the response time or slot the item in a larger location.

How do I pick the safety margin?

Look at the highest hourly demand in recent weeks compared with the average. A margin of 20 to 30 percent suits steady items, while promotional or erratic items may need 50 percent or more.

Is this the same as safety stock?

No. Safety stock protects against supplier and demand variability at the warehouse level. This margin protects the pick face during the internal replenishment response time.

Can I use it for case flow racks?

Yes. Use the capacity of the lane as the maximum and the case quantity as the replenishment quantity.

If you want to find which pick faces ran empty last month and why, straight from your SAP task history, we can build that analysis on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Software