SAP QM in Procurement Setup Checklist
QM in procurement links purchasing, warehouse and quality. A single missed setting in the material master or vendor data can stop lots from being created. Use this checklist to cover each layer.
0 of 30 items complete
10 critical items still open - these are the highest-risk gaps.
Plant and system settings
Material master
Vendor and source of supply
Inspection plans and results
Go live and monitoring
Aim to complete every critical item before go live. Anything not ticked is a risk to review with quality and the warehouse.
Want a data completeness check?
We can run a read only check of QM views and vendor data against this checklist.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Work through each group in order, from plant settings to go live. Mark items done as you test them in a sandbox. Items flagged as critical are those that most often cause missing inspection lots or stock stuck in inspection. Export the result and attach it to your project documentation, with the owner and date for each open item.
How QM in procurement works
When a goods receipt is posted against a purchase order, SAP checks whether QM in procurement is active for the plant and the material. If so, an inspection lot is created using the inspection type and the plan or specification found. The QM control key decides whether inspection is mandatory and whether certificates or vendor release are checked. Stock sits in quality inspection until the usage decision moves it.
- Plant level activation and QM control key
- Material master QM view with inspection type 01
- Vendor release and quality assurance agreement checks
- Usage decision moves stock to unrestricted, blocked or scrap
Common mistakes
Frequent problems are setting the QM view in only one plant, leaving the inspection type inactive, having no plan with the correct usage, and mixing up the vendor release logic. Another trap is partial deliveries: each goods receipt can create a new lot, which changes workload for the inspector. Test with partial deliveries and returns before go live.
- QM view maintained in the wrong plant
- No plan with usage Goods receipt
- Vendor release status blocking all POs unintentionally
- Partial deliveries creating more lots than staff can handle
Frequently Asked Questions
Where is QM in procurement activated?
It is activated per plant in customizing (SPRO, Quality Management, Quality Planning, Basic Settings) and then per material in the QM view. Your menu path can differ by release, so confirm in your system.
What is a QM control key?
A QM control key defines how QM in procurement behaves for a material, for example whether inspection is required before goods receipt and whether a certificate is needed. It is set in the material master and customizing.
What is vendor release for QM?
It lets you block or release a supplier for a material from the quality point of view. Settings come from the quality info record and can stop POs or goods receipts when a release is missing.
How do I reduce inspection effort for trusted suppliers?
You can use dynamic modification rules and skip logic, or rely on supplier certificates. Document the rules and the review process so changes are controlled.
Netray can help you check QM data completeness across materials and vendors with an ERP aware assistant. We can start with a read only review.
Related Tools
SAP QM Inspection Types Reference
Look up the standard SAP QM inspection types, what business event triggers each one and what you must set up in the material master and inspection plan.
SAPSAP QM Dynamic Modification Rule Calculator
Model how much inspection effort a skip or reduced stage saves, based on the share of lots that run at the reduced stage.
SAPSAP QM Quality Notification Types Reference
See what the standard SAP quality notification types Q1, Q2 and Q3 are for, and how related PM types differ.
SAPSAP QM Inspection Lot Origins Reference
See which business events create inspection lots in SAP QM and what to check when a lot is missing.
SAPSAP QM Usage Decision Codes Worksheet
Plan usage decision code groups and codes, with valuation, stock posting and quality score, before you configure them in SAP QM.
More SAP tools
See all- SAP QM Sampling Procedure Design Template
- SAP Master Inspection Characteristic Upload Worksheet
- SAP PM Breakdown Notification Request Form Template
- SAP PM Measuring Point and Counter Readings Worksheet
- SAP PM Maintenance BOM and Spare Parts Cost Worksheet
- SAP PM Work Clearance and Work Permit Template
- SAP PM Spare Parts Kitting and Reservation Worksheet
- SAP PM Catalog and Code Group Design Worksheet
- SAP PM Maintenance KPI Calculator (MTBF, MTTR, Backlog)