SAP PM Open Maintenance Orders ABAP SELECT Generator
A list of open maintenance orders is one of the most requested custom PM reports. This generator writes the ABAP SELECT that joins AUFK and AFIH and excludes technically completed and closed orders using JEST.
Fill in
Open maintenance orders
REPORT ZPM_OPEN_ORDERS.
TYPES: BEGIN OF ty_order,
aufnr TYPE aufk-aufnr,
auart TYPE aufk-auart,
ktext TYPE aufk-ktext,
erdat TYPE aufk-erdat,
equnr TYPE afih-equnr,
tplnr TYPE afih-tplnr,
ingrp TYPE afih-ingrp,
END OF ty_order.
DATA lt_orders TYPE STANDARD TABLE OF ty_order WITH EMPTY KEY.
DATA lv_werks TYPE aufk-werks VALUE '1000'.
DATA lv_auart TYPE aufk-auart VALUE 'PM01'.
DATA lv_ingrp TYPE afih-ingrp VALUE '001'.
SELECT k~aufnr, k~auart, k~ktext, k~erdat, h~equnr, h~tplnr, h~ingrp
FROM aufk AS k
INNER JOIN afih AS h ON h~aufnr = k~aufnr
WHERE k~werks = @lv_werks
AND k~auart = @lv_auart
AND h~ingrp = @lv_ingrp
AND NOT EXISTS ( SELECT objnr FROM jest
WHERE objnr = k~objnr
AND stat IN ( 'I0045', 'I0046' )
AND inact = @abap_false )
ORDER BY k~aufnr
INTO TABLE @lt_orders
UP TO 500 ROWS.
IF sy-subrc <> 0.
WRITE / 'No open orders found'.
ENDIF.
LOOP AT lt_orders INTO DATA(ls_order).
WRITE: / ls_order-aufnr, ls_order-auart, ls_order-equnr, ls_order-tplnr, ls_order-ktext.
ENDLOOP.Variant: count of orders per status
SELECT j~stat, COUNT( * ) AS cnt
FROM aufk AS k
INNER JOIN jest AS j ON j~objnr = k~objnr
WHERE k~werks = @lv_werks
AND k~auart = @lv_auart
AND j~inact = @abap_false
GROUP BY j~stat
ORDER BY cnt DESCENDING
INTO TABLE @DATA(lt_status_counts).Uses new Open SQL syntax (ABAP 7.40 SP05 and later) with escaped host variables. On older releases, replace the commas and @ signs with the classic syntax. I0045 is TECO and I0046 is CLSD in standard systems; confirm in TJ02T. Test in a sandbox first and add authority checks (for example on object I_AUART) before releasing to users.
Open order report review
Optional: tell us which order report you maintain and we will look at how to simplify it.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter your plant, order type and planner group, choose a row limit, and copy the code into a report program in SE38 or into an ABAP class. The result lists order number, type, text, creation date, equipment, functional location and planner group. The second block gives a quick count of orders per active status, which is useful to spot a large pile of TECO orders that were never closed.
How the query works
AUFK holds the order master, including plant and the status object number OBJNR. AFIH adds the PM specific fields. The NOT EXISTS subquery on JEST removes any order that has an active TECO or CLSD status, which is more reliable than checking a single date field. INACT must be blank so that reversed statuses are not counted. Because JEST can have many rows per object, a NOT EXISTS predicate avoids duplicate order rows that a plain join would create.
- AUFK-OBJNR links to JEST-OBJNR
- I0045 is TECO and I0046 is CLSD
- INACT blank means the status is currently active
Common mistakes
The most common error is selecting from JEST with a join and filtering by status not equal to TECO, which still returns orders because they have other active statuses such as REL. Another is forgetting the client when using native SQL. Also avoid SELECT * on AUFK in loops: add only the fields you need, index on plant and order type, and keep a row limit during testing. On HANA, consider a CDS view if the logic is reused.
Frequently Asked Questions
How do I select only orders that are not completed?
Exclude orders that have an active TECO or CLSD status in JEST using a NOT EXISTS subquery on the order object number OBJNR. Make sure INACT is blank, otherwise a reversed status still counts. This code does that for you.
Will this run on S/4HANA?
Yes, AUFK, AFIH and JEST are still available in on-premise S/4HANA and the Open SQL syntax is valid. For high volume reporting consider CDS views or the standard Fiori apps, and always check authorization.
Can I add dates or notifications to the query?
Yes. Join AFKO on AUFNR for scheduled start and finish dates, and join QMEL on AFIH-QMNUM = QMEL-QMNUM for the linked notification. Add each field to both the SELECT list and the result type so the structure still matches.
Why is my result empty?
Check that the plant and order type match exactly, including leading zeros in the planner group. Also confirm that orders are not all TECO already. Run the status count variant to see which active statuses your orders really have.
If you would rather ask for open orders in plain language and get the query shown back, we can connect that to your SAP system with read-only access.
Related Tools
SAP PM Order and Notification Status Reference
A lookup of SAP PM system statuses with what each means, what sets it and what it blocks.
SAPSAP PM Database Tables Reference
A searchable lookup of the core SAP PM tables, their key fields and what each is used for in reports and extracts.
SAPSAP PM Equipment and Functional Location SQL Generator
Generates a SQL query that lists equipment installed under a functional location, joining the master, time segment, location and text tables.
SAPSAP PM Order Create BAPI ABAP Skeleton (BAPI_ALM_ORDER_MAINTAIN)
Fill in order type, plant and equipment and get a working-shape ABAP skeleton that creates a maintenance order through BAPI_ALM_ORDER_MAINTAIN.
More SAP tools
See all- SAP Sales Document Types Reference
- SAP Pricing Procedure Design Worksheet
- SAP Item Category Determination Reference
- SAP Delivery Block Reasons Template
- SAP Credit Management Checklist
- SAP Output Determination Checklist
- SAP Billing Types Reference
- SAP Incompletion Log Checklist
- SAP SD Tables Reference (VBAK, VBAP, LIKP, VBRK and More)
New to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.
Keep exploring
Free tools
- SAP Open Production Orders ABAP SELECT GeneratorFill in plant, order type and dates and get a ready ABAP Open SQL query for open production orders.
- SAP Open PO Items ABAP SELECT GeneratorFill in plant, document type and dates to generate ABAP Open SQL that lists open PO items with received quantity from EKBE.
- SAP ABAP Open Items SELECT GeneratorFill in company code, vendor range and key date to get a ready-to-edit ABAP report that lists open vendor items with an overdue calculation.
ERP fixes and how-tos
- SAP PP, PM and MM API: Production Orders, Maintenance Orders and Material MasterWhich SAP APIs cover production orders, maintenance orders and material master (MM02)? OData service names, BAPI alternatives and a sample GET call.
- SAP Production Order Technically Complete (TECO): Set and Reverse in CO02How to technically complete a production order in CO02, what TECO blocks, how to reset it, and how it differs from the CLSD business close status.