SAP PM Database Tables Reference (AUFK, AFIH, QMEL, EQUI and More)

When a maintenance KPI report, data migration or interface needs data that standard transactions do not show, you end up in SE16N or an ABAP select. This reference lists the tables that matter in SAP plant maintenance, with key fields and what each one holds.

Download:
TableDescriptionKey fieldsAreaTypical use
AUFK
Order master data
AUFNR
Orders
Order type, plant, texts, status object number OBJNR
AFIH
Maintenance order header (PM specific)
AUFNR
Orders
Equipment, functional location, planner group, notification link
AFKO
Order header data (scheduling)
AUFNR
Orders
Basic and scheduled start and finish dates
AFVC
Operation within an order
AUFPL, APLZL
Orders
Operation number, work center, control key
AFVV
Quantities, values and dates of the operation
AUFPL, APLZL
Orders
Planned work and duration per operation
AFRU
Order completion confirmations
RUECK, RMZHL
Orders
Actual hours, confirmation text, final confirmation flag
RESB
Reservation and dependent requirements
RSNUM, RSPOS, RSART
Orders
Planned spare parts per order
MSEG
Document segment: material
MBLNR, MJAHR, ZEILE
Orders
Goods issues posted to orders
T003O
Order types
AUART
Customizing
Order type configuration
QMEL
Quality notification header
QMNUM
Notifications
Notification type, dates, reporter, priority
QMIH
Quality message: PM specific data
QMNUM
Notifications
Equipment, functional location, breakdown indicator
QMFE
Quality notification items
QMNUM, FENUM
Notifications
Damage and object part codes
QMUR
Quality notification causes
QMNUM, FENUM, URNUM
Notifications
Cause codes for failure analysis
QMMA
Quality notification activities
QMNUM, MANUM
Notifications
Activity codes recorded on a notification
QMSM
Quality notification tasks
QMNUM, MANUM
Notifications
Planned tasks on a notification
EQUI
Equipment master data
EQUNR
Technical objects
Equipment category, manufacturer, serial number
EQUZ
Equipment time segment
EQUNR, DATBI, EQLFN
Technical objects
Installation data and link to ILOA via ILOAN
EQKT
Equipment short texts
EQUNR, SPRAS
Technical objects
Equipment description by language
IFLOT
Functional location
TPLNR
Technical objects
Functional location master and category
IFLOTX
Functional location short texts
TPLNR, SPRAS
Technical objects
Functional location description by language
ILOA
PM object location and account assignment
ILOAN
Technical objects
Maintenance plant, cost center, location, TPLNR
IHPA
Plant maintenance partners
OBJNR, PARVW, COUNTER
Technical objects
Partner roles on orders and notifications
T370
Equipment categories
EQTYP
Customizing
Equipment category configuration
T370F
Functional location categories
FLTYP
Customizing
Functional location category configuration
T024I
Maintenance planner groups
IWERK, INGRP
Customizing
Planner group per planning plant
MPLA
Maintenance plan header
WARPL
Preventive maintenance
Plan category, strategy, scheduling parameters
MPOS
Maintenance item
WAPOS
Preventive maintenance
Link of plan to object and task list
MHIS
Maintenance plan history
WARPL, ZAEHL
Preventive maintenance
Planned and completion dates per call
MHIO
Maintenance call object
WARPL, ZAEHL
Preventive maintenance
Call objects generated from plan
T351
Maintenance strategies
STRAT
Customizing
Strategy definitions and scheduling indicators
T351P
Maintenance packages
STRAT, ZAEHL
Customizing
Packages (cycles) within a strategy
PLKO
Task list header
PLNTY, PLNNR, PLNAL
Task lists
Task list type, group and group counter
PLPO
Task list operation
PLNTY, PLNNR, PLNKN
Task lists
Operations, work center, text
MAPL
Assignment of task lists to materials
MATNR, WERKS, PLNTY, PLNNR
Task lists
Find the task list behind an object
DIIMPT
Measuring points
POINT
Condition monitoring
Measuring point master
IMRG
Measurement documents
MDOCM
Condition monitoring
Counter and measurement readings
JEST
Individual object status
OBJNR, STAT
Status
Active system and user statuses
JSTO
Status object information
OBJNR
Status
Status profile assigned to the object
TJ02T
System status texts
ISTAT, SPRAS
Status
Translate I-codes into REL, TECO, CLSD
CRHD
Work center header
OBJTY, OBJID
Master data
Work center, plant and category
KLAH
Class header data
CLINT
Classification
Class definition for equipment classes
AUSP
Characteristic values
OBJEK, ATINN, ATZHL
Classification
Classification values of technical objects

Table and field names are stable across ECC and S/4HANA for the on-premise PM data model, but verify in SE11 for your release. Several joins need OBJNR, ILOAN or AUFPL, which are internal numbers rather than the numbers users see.

PM data extract review

Optional: send us a report you maintain by hand and we will tell you how it could be answered directly from SAP data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table list

Type a table name, a topic such as notification or equipment, or a field name into the search box. Use the Area column to narrow to orders, notifications, technical objects, preventive maintenance, task lists, status or customizing. The Key fields column tells you how to join: for example orders and notifications connect through AFIH-QMNUM, and equipment connects to location data through EQUZ-ILOAN and ILOA-ILOAN. Export the filtered list to Excel to keep a project data dictionary.

  • Search by table, description or typical use
  • Filter to one area to see a single process end to end
  • Export to Excel for migration mapping documents

The joins that cause the most confusion

Four joins explain most PM reports. First, AUFK to AFIH by AUFNR gives order header plus PM data. Second, AFIH to AFVC goes through AFKO-AUFPL, because operations hang off the routing number and not the order number. Third, any status question goes through OBJNR into JEST, then TJ02T for the readable status code. Fourth, equipment and functional location both pull location and cost center from ILOA through ILOAN. Learn these four and the rest follows.

Reading and cautions

Reading from tables is safe, writing to them is not. Never update PM tables directly with SE16N edit or custom SQL, because status, change documents and dependent objects will go out of sync. Use BAPIs or standard transactions for changes. Also remember that EQUZ and several others are time segmented, so filter DATBI to the open-ended date to get the current record. On S/4HANA, some legacy tables still exist but are served as compatibility views, so check the data model for your release.

Frequently Asked Questions

Which table holds SAP maintenance order data?

The order master sits in AUFK, with PM specific fields such as equipment, functional location and planner group in AFIH. Dates are in AFKO, operations in AFVC, and confirmations in AFRU. Join them by AUFNR, and by AUFPL for operations.

How do I link a notification to its order?

The notification number is stored in the order header table AFIH in field QMNUM. Join QMEL or QMIH on QMNUM to get the notification data. In reverse, the order number is stored in the notification header as AUFNR.

Where is the current status of an order stored?

Status lives in JEST, keyed by the object number OBJNR from AUFK. Active rows have INACT blank. Translate the internal status code into text such as REL or TECO using TJ02T. User statuses use the status profile from JSTO and texts in TJ30T.

Does this list change in S/4HANA?

Core PM tables are largely retained in S/4HANA on-premise, though some fields and views have been simplified, and Fiori apps read from CDS views. Always confirm table structure in SE11 on your system before building a report or migration.

If your maintenance team still builds PM reports by hand from these tables, we can set up a read-only natural language layer over your SAP data that shows the query it ran.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Software