SAPFree referencePDF, Excel, Word exportSAP ECC / S/4HANAAll SAP ECC 6.0 tools

SAP Item Category Determination Reference: TAN, TANN, TAD, TAS and More

Item categories control what happens to each line of a sales document: whether it is delivered, billed, priced, or sent to purchasing. This reference lists the standard categories and explains how SAP picks one.

Download:
Item catDescriptionDelivery relevantBilling relevantTypical use
TAN
Standard Item
Yes
Yes
Normal stocked material in a standard order.
TANN
Free of Charge Item
Yes
No
Goods delivered without charge, such as samples.
TAD
Service
No
Yes
Service or non-stock item billed from the order.
TAS
Third-Party Item
No
Yes
Vendor ships directly to the customer, a purchase requisition is created.
TATX
Text Item
No
No
Free text line on the document, no quantity processing.
TAK
Configurable Material
Yes
Yes
Configurable product with characteristics selected in the order.
AFN
Inquiry Item
No
No
Line in an inquiry, no follow-on processing by itself.
AGN
Quotation Item
No
No
Line in a quotation, copied into the order later.
REN
Returns Item
Yes
Yes
Customer return, delivery in and credit memo out.
G2N
Credit Memo Item
No
Yes
Line in a credit memo request.
L2N
Debit Memo Item
No
Yes
Line in a debit memo request.
KEN
Consignment Fill-Up Item
Yes
No
Stock moved to customer consignment, no invoice.
KAN
Consignment Issue Item
Yes
No
Stock withdrawn from consignment by the customer.
KBN
Consignment Pick-Up Item
Yes
Yes
Stock returned from consignment, quantity based.
KRN
Consignment Returns Item
Yes
No
Return of consumed consignment stock.

Relevance flags shown reflect the typical standard configuration. Check the item category in VOV7 for the exact billing relevance indicator and the schedule line category assignment in your system.

Item category audit

Optional: we can compare your item category group assignments with the determination table and flag combinations that fall back to unexpected categories.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this reference

Search for an item category such as TAS or a word like service to find its typical delivery and billing relevance. Use it when you design a process, for example third-party order processing, and need to decide which item category fits. It is also useful when you debug why a line is not delivered or invoiced, because the answer is often a mismatch between the item category and the schedule line category.

  • Filter by code or description
  • Compare with the client's VOV7 entries
  • Export to Excel for the blueprint
  • Use it in test case design for each process

How item category determination works

SAP looks up a table (T184) using four keys: the sales document type, the item category group from the material master sales org 2 view, the usage and the higher-level item category. The result is a default item category, and optionally a manual alternative the user may pick. For example, document type OR with item category group NORM normally finds TAN, while the same type with group DIEN finds TAD. The configuration transaction is OVLP.

  • Sales document type comes from the header
  • Item category group is set per material
  • Usage field supports special cases such as free goods
  • Higher-level item category supports bills of material

Item categories and schedule lines

Each item category links to schedule line categories, and the schedule line category decides whether the line is relevant for availability check, requirements transfer and delivery. A third-party item such as TAS uses a schedule line category that creates a purchase requisition instead of an MRP requirement. If a line shows no delivery, check both the item category and the schedule line category before changing either.

Common mistakes

Common issues include changing the item category group on a material without testing existing open orders, creating a Z item category when a different usage entry would work, and forgetting to maintain the manual item category entry that users need for free of charge lines. A last classic is copying a standard item category without updating the pricing and billing relevance flags to match the new process.

Frequently Asked Questions

Where do I maintain item categories in SAP?

Use transaction VOV7 for the item category definition and OVLP for the determination table. The path in SPRO is Sales and Distribution, Sales, Sales Documents, Sales Document Item. Schedule line categories are maintained next to it.

What is an item category group?

It is a field in the material master, in the sales org 2 view, that classifies the material for item category determination. Standard values include NORM for normal items and DIEN for services. It is one of the keys SAP uses to find the item category.

Why is my line not billing?

Check the billing relevance in the item category, the billing block on the header or item, the delivery status if billing is delivery related, and the billing date. An item category that is not billing relevant will never appear in the billing due list.

Can one document have different item categories?

Yes. Each line gets its own category based on the material and usage. A single order can hold a standard item, a text item, a service and a free of charge line, each handled differently for delivery and billing.

If you want an easy way to find every material in your system whose item category group will lead to a non-standard item category, we can build a read-only report agent over your SAP master data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations