Sheet Metal Bend Inspection Record Template
This template creates a clean bend inspection record for first-piece, in-process and final checks on press brake parts. Fill in the header, print or export to PDF or Word, and record measured angles and flange lengths.
Fill in
Sheet Metal Bend Inspection Record Template
Bend Inspection Record
Company: Acme Fabrication Ltd Part number: BRK-20418 Revision: C Job: WO-104562 Date: 2026-10-20 Inspection type: First piece
Setup details
Material: Carbon steel 2.0 mm Program: BRK-20418-P3 Tooling: Punch 88 deg R1.0, V16 die
Bend and flange measurements
| Bend | Nominal angle | Tolerance | Measured | Flange nominal | Flange measured | Pass/Fail |
|---|---|---|---|---|---|---|
| 1 | 90 deg | +/- 1 deg | ||||
| 2 | 90 deg | +/- 1 deg | ||||
| 3 | 90 deg | +/- 1 deg | ||||
| 4 | 90 deg | +/- 1 deg |
Overall dimensions
| Feature | Nominal | Tolerance | Measured | Pass/Fail |
|---|---|---|---|---|
| Overall length | ||||
| Overall width | ||||
| Hole to bend position | ||||
| Flatness or twist |
Result and comments
Overall result: Accept
Angle bend 2 adjusted by 0.5 deg after first piece. Recheck passed.
Sign-off
Starting point for a shop record. Tolerances and gauge methods must follow the drawing and your quality system. Not a substitute for customer-specific first article requirements.
Digital inspection records
Want inspection results linked to work orders in your ERP? Tell us what you use now. Optional.
Optional. The tool and every export work without this. No spam.
How to use it
Complete the fields at the top with the part, revision, job, material, program and tooling. The record includes tables for bend angle, flange length and overall dimensions. Print it, take measurements at the machine, then enter the result and sign off. For repeat orders, keep the program and tooling fields, since they let the next operator reproduce the setup. Always check the drawing revision to avoid inspecting to an outdated tolerance, which is a common source of escapes.
What to measure
Check each bend angle with a protractor, angle gauge or a digital angle finder suited to the part, and measure flange length and overall size with calipers or a height gauge. Note hole-to-bend positions and flatness if the drawing specifies them. First-piece inspection should happen before running the batch, and in-process checks at an interval set by risk and quantity. Record any adjustments to the program, such as angle correction for springback, so the final setting is not lost.
- Bend angle against drawing tolerance
- Flange length and overall size
- Hole position relative to the bend
- Flatness, twist and surface damage
Common mistakes
Measuring angles with a worn or unsuited gauge, checking only one end of a long bend, and skipping the revision check are frequent errors. Material grain and batch variation can shift angles, so recheck when coil or sheet lots change. Keep completed records with the job traveler, or scan them into your quality system, so you can trace results to the program, tooling and operator if a customer queries the lot.
Frequently Asked Questions
Is this an AS9102 form?
No. It is a simple shop record for bend inspection. If a customer requires AS9102 or PPAP documentation, use the forms required by the contract.
How often should in-process checks happen?
It depends on risk, quantity and customer requirements. Many shops check at the start, at set intervals, and after any tooling or program change. Follow your quality plan.
Can I add more bends?
Export to Word and add rows, or print multiple sheets for complex parts. The table is a starting layout for typical parts with up to four bends.
What tolerance should I use for bend angles?
Use the tolerance on the drawing. If none is given, many shops apply a general tolerance such as +/- 1 degree, but this should be set by your standard or agreed with the customer.
We can help bring inspection records into your ERP or quality system so first-piece results, adjustments and lots are traceable from one screen.
Related Tools
Sheet Metal Springback and Overbend Calculator
Estimate how far a bend relaxes after the punch retracts and what tool angle to program to land on the target angle.
Discrete ManufacturingPress Brake Die Opening and Minimum Flange Calculator
Choose a V-die width by thickness multiplier and check whether your flange is long enough to form without slipping into the die.
Discrete ManufacturingSheet Metal Flat Blank Length Calculator
Turn outside leg dimensions and bend data into the flat pattern length, using outside setback, bend allowance and bend deduction.
Costing & FinanceSheet Metal Routing Operation Cost Worksheet
List each operation from laser to powder coat, enter setup and run minutes and hourly rates, and see hours and cost per operation and in total.
More Quality & Inspection tools
See all- Sheet Metal First Article Inspection Report Template
- Sheet Metal Nonconformance Report Template
- Sheet Metal Quote Review Checklist Before Sending
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
Keep exploring
Free tools
- Sheet Metal Bend Allowance CalculatorEnter thickness, inside radius, K-factor and bend angle to get bend allowance, bend deduction and the flat blank length for a single bend.
- Sheet Metal Flat Blank Length CalculatorTurn outside leg dimensions and bend data into the flat pattern length, using outside setback, bend allowance and bend deduction.
- Sheet Metal Minimum Bend Radius by Material ReferenceTypical minimum inside bend radius for common sheet metal alloys and tempers, shown as a multiple of material thickness, with cracking notes.
Guides
- Sheet Metal Quoting Software for FabricatorsHow to choose sheet metal quoting software: DXF import, nest-aware material cost, bend and weld time, outside finishing, and a clean handoff to your ERP.
- ERP for Metal Fabricators: What the System Must HandleERP for metal fabricators and sheet metal shops: nested material, multi-level BOMs, heat number traceability, outside processing, and shop floor data.
- ERP for Metal Fabrication: Nesting, Traceability, and Job CostingERP for metal fabrication: laser and press brake routings, nesting and drop tracking, mill test report traceability, weld inspection and real-time job costing.
AI on your ERP
- Epicor Kinetic AI for Metal Fabrication: Jobs, Heat Numbers and Outside Processing in Plain EnglishPrivate AI on Epicor Kinetic for metal fabricators: ask about jobs, nests, heat numbers and outside processing in plain English, grounded in live data.
- AI for Dynamics 365 Business Central in Metal FabricationPrivate AI for Business Central metal fabricators: quote-to-job costing, heat-lot traceability, outside processing and remnant stock grounded in your data.