Visma.net Integration Checklist for ERP and Shop Floor Systems
Visma.net ERP is common among small and mid-sized companies in the Nordics, the Netherlands and the UK, and manufacturers often need to connect it to a shop floor system, web shop or CRM. This checklist covers what to settle before, during and after building that connection.
0 of 32 items complete
20 critical items still open - these are the highest-risk gaps.
1. Scope and design
2. Access and authentication
3. Data mapping
4. Error handling and reliability
5. Testing, security and go live
An integration is ready for production when every critical item is ticked and the reconciliation report has run clean on test data.
Integration design review
Send us your flow diagram and mapping table and we will comment on risks. Optional and free to discuss.
Optional. The tool and every export work without this. No spam.
How to use this checklist
Use it at three points: during design, before the first test cycle and before go live. Export it to Excel, add an owner and date to each line, and review it weekly with your integration partner. Critical items are those that, if skipped, usually cause duplicate records, silent data loss or security findings.
Authentication and access
Visma services use OAuth based authentication through Visma Connect, and the details such as grant types and scopes depend on the API and product you use, so confirm them in the current developer documentation for your product. Keep separate credentials for test and production, store secrets in a vault and give the integration user only the rights it needs. Plan for token expiry from the first prototype.
Mapping and reliability
Most integration defects come from mapping, not from the transport. Units of measure, tax codes, payment terms and warehouse codes rarely match across systems. Write the mapping table early and have the business sign it. For reliability, design every message so it can be replayed safely, and give failed messages an owner. Silent failures are worse than loud ones.
- Decide the system of record per data object
- Make writes idempotent
- Respect API rate limits with backoff
- Log without storing personal data unnecessarily
Common mistakes
Teams often test only the happy path and discover credit notes and cancellations in production. Another is building directly against production data, which makes mistakes hard to undo. Finally, many forget the reconciliation step. A daily report comparing counts and totals across systems catches drift within a day instead of at month end.
Frequently Asked Questions
Is this checklist from Visma?
No. It is an independent checklist based on general integration practice. API names, scopes and limits change, so always check the current Visma developer documentation for your specific product.
Should I build a custom integration or use a connector?
Use a maintained connector or integration platform when one exists for both systems and covers your flows. Build custom only for unusual logic, and plan the long term support cost.
How do I avoid duplicate records?
Use a stable external key for each record, check for it before creating, and make updates idempotent. Keep a mapping table of source ids to ERP ids so replays do not create copies.
What should I monitor after go live?
Watch failed message counts, run durations, authentication errors and a daily reconciliation of totals. Review them daily in the first weeks and weekly afterwards.
If you want a review of your integration design or help writing the reconciliation checks, Netray can assist. This checklist is free and does not require any contact.
Related Tools
Exact Globe to Exact Online Assessment
Ten questions that rate how ready an Exact Globe installation is to move to Exact Online, covering customization, manufacturing scope and integrations.
Country & TaxDACH ERP Localization Checklist
A 34 item checklist for making an ERP fit German, Austrian and Swiss requirements, covering tax, e-invoicing, banking, records and language.
Other ERPsPriority ERP Form Design Template
A fill-in design document for a new or changed Priority form: identity, columns, triggers, privileges, sub-forms and test cases.
ERP Migration & SelectionEU Manufacturer ERP Selection Scorecard
A weighted scoring grid for comparing three ERP vendors on criteria that matter to European manufacturers, with automatic totals.
More Other ERPs tools
See all- Infor VISUAL Work Order Status and Structure Reference
- Infor VISUAL Manufacturing Scheduling Checklist
- Infor XA (MAPICS) Period End Close Checklist
- Infor VISUAL Database Table Reference
- Infor XA (MAPICS) Application Module Reference
- IBM i Commands for Infor XA Administrators Reference
- Acumatica Generic Inquiry Design Template
- Acumatica Manufacturing Edition Setup Checklist
- Sage X3 Import Template Worksheet
Keep exploring
Free tools
- NetSuite Manufacturing Go-Live ChecklistA 30 item checklist covering data, setup, costing, inventory, roles and cutover before you run production in NetSuite.
- proALPHA Implementation ChecklistA 30 item checklist for planning and running a proALPHA implementation from scoping through hypercare, with critical items flagged.
- Acumatica Manufacturing Edition Setup ChecklistA group-by-group checklist covering the foundation, engineering data, shop floor, planning and costing setup for Acumatica Manufacturing.
ERP fixes and how-tos
- How to Send Production and Labor Reporting from MES to ERPHow to design MES to ERP production and labor reporting: operation confirmations, good and scrap quantities, labor clock times, idempotent posting and error handling.
- Is Your ERP Data Ready for AI? A Readiness ChecklistMost ERP data is ready enough to pilot AI today. A practical checklist of the master-data and access-control issues that actually break AI answers.
- Infor M3 Business Engine upgrade checklist: customizations and integrationsPractical checklist for an Infor M3 Business Engine upgrade: inventory customizations, integrations, H5 personalizations, reports and a regression test plan.
Runs with your ERP
- SIGMA MES and Infor LNSIGMA MES from a certified Infor LN partner in Germany: how it connects to Infor LN, Infor OS/ION and web services, setup, pitfalls, alternatives and AI uses.
- Cantier MES 4.0 and SAP S/4HANA: shop floor data and digital travellersHow Cantier MES 4.0 collects shop floor production and quality data and builds digital traveller cards from S/4HANA production history. Setup and pitfalls.
- 42Q Cloud MES and SAP S/4HANA Cloud Private Edition: MES for electronics and discreteHow the 42Q Smart Manufacturing Cloud MES works with SAP S/4HANA Cloud Private Edition under RISE with SAP, for discrete and electronics manufacturers.
Guides
- CRM to SyteLine ERP Integration PatternsIntegrate CRM systems with Infor SyteLine ERP. Sync accounts, quotes, orders, and pipeline data between Salesforce, Dynamics 365, HubSpot, and SyteLine.
- Building Third-Party Integration Connectors for Infor LNBuild and configure third-party integration connectors for Infor LN. ION Connect, middleware patterns, and connector development for CRM, WMS, and e-commerce systems.
- Salesforce ERP Master Data Synchronization GuideSynchronize customer, item, and pricing master data between Salesforce CRM and ERP systems with conflict resolution, governance, and real-time sync patterns.
AI on your ERP
- Dynamics 365 AI Demo and Proof of Concept: Testing AI on Your Own Data in 30 DaysHow to run a Dynamics 365 AI demo or proof of concept on your own data: sandbox setup, use cases, test sets, security, success criteria and a 30-day plan.
- AI on Your ERP for Building Products ManufacturersPrivate AI on your ERP for building products makers: configured-to-order windows and doors, project quotes, lot yields, EPDs and code certifications on your own systems.
Software
- Critical Manufacturing MESCritical Manufacturing MES explained: a modular MES for semiconductor, electronics and medical device plants, with integrations, limitations and alternatives.
- AVEVA MESAVEVA MES explained: formerly Wonderware MES, its production, quality and tracking capabilities, ERP and System Platform integration, and alternatives.