WBGT Heat Stress Index Calculator for Indoor and Outdoor Work
Wet bulb globe temperature combines air temperature, humidity, radiant heat and (outdoors) sunshine into one heat stress number. This calculator handles the arithmetic so you can compare a reading to your own limit quickly.
Your numbers
Measured with a wetted wick, naturally ventilated.
150 mm black globe unless your instrument states otherwise.
Needed only for outdoor work with solar load.
Take from your heat program, based on work rate and acclimatization (for example ACGIH or NIOSH tables).
Your results
Planning aid. WBGT must be measured with calibrated instruments at the worker position. Limits depend on metabolic work rate, clothing and acclimatization; use your heat illness prevention program and local regulation.
WBGT as natural wet bulb rises
Sweeps Natural wet bulb temperature from 15 to 35, holding your other inputs fixed.
Connect heat sensors to exposure records
Optional review of how on-prem sensor data can support heat exposure tracking.
Optional. The tool and every export work without this. No spam.
How to use it
Take readings at the worker's location with a WBGT instrument or its separate sensors: natural wet bulb, globe and dry bulb. Choose the right setting. Indoors, and outdoors with no solar load, the dry bulb is not used. Outdoors in sun, all three terms apply. Enter the limit from your heat program, which varies with how hard the work is and whether workers are acclimatized, and read the margin. Repeat at different times of day and near furnaces, ovens or presses.
The formulas
Outdoors with solar load: WBGT = 0.7 x Tnwb + 0.2 x Tg + 0.1 x Tdb. Indoors or outdoors without solar load: WBGT = 0.7 x Tnwb + 0.3 x Tg. Natural wet bulb carries most of the weight because it captures humidity and airflow, and the globe captures radiant heat from machines and sun. Dry bulb alone, or a heat index from weather forecasts, is not a substitute, especially near radiant sources such as forges and heat treat lines.
- Natural wet bulb is not a psychrometric wet bulb
- Measure in the actual work position
- Check at the hottest part of the shift
Reading the result
Compare WBGT to a limit suited to the job. Heavier work and unacclimatized workers need lower limits, and heavy or impermeable clothing means readings need adjustment. When the margin is small, consider engineering controls first: ventilation, shielding, insulation of hot surfaces. Then use work and rest cycles, drinking water access, acclimatization schedules and buddy monitoring. The chart shows how quickly humidity moves the number when natural wet bulb climbs.
Common mistakes
A frequent error is using the standard psychrometer wet bulb instead of a naturally ventilated one, which understates the stress. Another is putting a globe in the shade for an outdoor reading. Do not compare a WBGT to a heat index chart, because the scales differ. Finally, do not apply a limit that assumes light work to a heavy task.
Frequently Asked Questions
What is WBGT?
Wet bulb globe temperature is an index of heat stress that combines natural wet bulb, globe and, outdoors in sun, dry bulb temperatures. It reflects humidity, radiant heat and air movement, which a simple thermometer reading does not.
Do I use dry bulb temperature indoors?
No. Under the usual formula, indoor and no-solar-load WBGT uses only 0.7 natural wet bulb plus 0.3 globe. Dry bulb enters the equation only outdoors with solar load.
What limit should I use?
Choose the limit from your heat illness prevention program or a recognized guideline such as ACGIH or NIOSH, based on work rate, acclimatization and clothing. The tool lets you enter it so the result matches your policy.
Can I get WBGT from a weather app?
Some forecasts estimate outdoor WBGT, but they cannot reflect radiant heat from process equipment or microclimate at the job. For compliance and for hot indoor work, measure on site.
If you want sensor data from furnaces, ovens and shop floor monitors tied to shift schedules and exposure records, we can help connect those sources on-prem.
Related Tools
Noise Exposure TWA and Dose Calculator
Calculate noise dose and 8-hour time-weighted average from up to three exposure segments using the OSHA 5 dB exchange rate.
Safety & WorkforceToolbox Talk Record Template
A fill-in toolbox talk (safety huddle) record with topic, key points, questions raised and an attendee sign-in table, ready to print or export.
Safety & WorkforceLTIFR and Severity Rate Calculator
Compute lost time injury frequency rate, severity rate and average days lost per injury on the hours basis your company or customer uses.
Safety & WorkforceSafety Training Matrix and Expiry Tracker Worksheet
Editable worksheet that lists each employee and course, the required refresher interval and how many months remain, with overdue count and compliance percentage.
More Safety & Workforce tools
See all- Hazard Identification and Risk Ranking Worksheet
- Plant HR and Labor KPI Definitions Reference
- Shift Work Fatigue Risk Assessment
- New Operator First Week Onboarding Checklist
- Production Supervisor Capability Self-Assessment
- Confined Space Entry Permit Template
- Hot Work Permit Template
- Emergency Action Plan Template
- Safety Training Matrix Worksheet
Keep exploring
Free tools
- Exact Globe to Exact Online AssessmentTen questions that rate how ready an Exact Globe installation is to move to Exact Online, covering customization, manufacturing scope and integrations.
- Shaft Torque, Power and Shear Stress CalculatorConvert power and speed to torque, then check torsional shear stress, twist per meter and the minimum solid-shaft diameter for an allowable stress.
- Beam Deflection and Bending Stress CalculatorCompute midspan or tip deflection, peak bending moment and bending stress for a simply supported or cantilever beam in steel, stainless, aluminum or titanium.
Guides
- ERP Load Testing Methodology and Best PracticesLoad test ERP systems with a structured methodology covering test planning, realistic workload modeling, execution with JMeter or k6, and performance analysis.
- Foundry Heat and Lot Traceability for CastingsHow foundries trace castings back to heat, charge, pattern and process records, what customers and auditors ask for, and how to retrieve it in minutes.
- AI for Commercial Heat Treating Shops: Quotes, Spec Review and CertsWhere AI helps in a commercial heat treating shop: reading POs and specs, drafting quotes by weight and cycle, checking certs, answering furnace record questions.
AI on your ERP
- Epicor Kinetic AI for Metal Fabrication: Jobs, Heat Numbers and Outside Processing in Plain EnglishPrivate AI on Epicor Kinetic for metal fabricators: ask about jobs, nests, heat numbers and outside processing in plain English, grounded in live data.
- AI for Acumatica in Metal Fabrication: Heat Lots, Remnants and Routing Answers From Live DataPrivate AI on Acumatica for metal fabricators: heat-lot traceability, remnants, routing time and quote questions answered from live data via REST and OData.