Noise Exposure TWA and Dose Calculator
Noise dose tells you how much of the daily allowable exposure a worker has used. This calculator combines up to three tasks at different sound levels into one dose and an 8-hour time-weighted average.
Your numbers
Average A-weighted level for this task
Levels below 80 dBA are ignored in the dose, as in OSHA's calculation
Your results
Screening tool using the OSHA 29 CFR 1910.95 equations. Use dosimetry or sound level measurements by a qualified person for compliance decisions, and consider impulse and peak sound limits separately.
Map exposure groups to your assets
Optional: discuss tying sound survey results to machines and areas in your ERP or CMMS.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the average A-weighted sound level and the hours spent at that level for up to three segments of the shift. Levels below 80 dBA are ignored when computing dose. The calculator finds the allowed time at each level, adds the fractions and shows the total dose as a percentage and the equivalent 8-hour TWA. Use measured values from a sound level meter or personal dosimeter, and make sure total hours match the real exposure period. If workers move through many levels, a dosimeter gives a more reliable result than manual segments.
The formulas behind it
Under 29 CFR 1910.95, the permissible exposure limit is 90 dBA for eight hours with a 5 dB exchange rate: each 5 dB increase halves the allowed time. The reference duration is T = 8 / 2^((L - 90) / 5). Dose D = 100 x the sum of Ci / Ti, where Ci is time at level Li. TWA = 16.61 x log10(D / 100) + 90. The hearing conservation program action level is an 8-hour TWA of 85 dBA, equal to a 50% dose. Some other countries and NIOSH use 85 dBA with a 3 dB exchange rate, so results differ.
- 100% dose equals 90 dBA TWA (OSHA PEL)
- 50% dose equals 85 dBA TWA (action level)
- 5 dB exchange rate in OSHA, 3 dB in NIOSH and many countries
- Peak impulse noise of 140 dB is limited separately
Worked example
With the defaults, 3 hours at 92 dBA allows T = 8 / 2^0.4 = 6.06 hours, giving 0.495. Three hours at 87 dBA gives T = 8 / 2^(-0.6) = 12.13 hours and 0.247. Two hours at 78 dBA is ignored. The dose is about 74% and the TWA is about 87.8 dBA. That is above the 85 dBA action level, so the worker needs audiometric testing, training and hearing protection available, but below the PEL. Engineering controls and quieter processes remain the preferred long-term fix.
Frequently Asked Questions
What is the OSHA action level for noise?
An 8-hour time-weighted average of 85 dBA, equivalent to a 50% dose. Above it, employers must run a hearing conservation program with monitoring, audiometric testing, training and hearing protection.
Why is the exchange rate 5 dB?
OSHA's standard uses a 5 dB exchange rate, so allowed time halves for each 5 dB rise. NIOSH recommends a 3 dB rate, which is more protective. Use the rate that your regulator requires.
Does hearing protection reduce the dose here?
This calculator uses sound level at the ear without protection. Hearing protector attenuation is applied separately using NRR derating or a field attenuation method. Do not subtract the label NRR directly.
Can I use it for non-US limits?
The formulas follow the OSHA method. Many regions use 85 dBA with a 3 dB exchange rate, which gives a different dose. Use it as a rough screen only and apply your local method for compliance.
If you want noise survey results from your ERP maintenance or asset data tied to exposure groups, Netray can discuss the approach.
Related Tools
OSHA 300 Injury and Illness Log Worksheet
An editable OSHA Form 300 style log that tallies cases, days away and restricted days so you can prepare the annual 300A summary.
Safety & WorkforceSafety Training Matrix Worksheet
An editable training record that shows who is trained on what, when it was last done and how many days remain before renewal.
Safety & WorkforceToolbox Talk Record Template
A fill-in toolbox talk (safety huddle) record with topic, key points, questions raised and an attendee sign-in table, ready to print or export.
Safety & WorkforceChemical Inventory and SDS Tracking Worksheet
An editable chemical list for your hazard communication program, with location, quantity, hazard category and SDS revision date.
More Safety & Workforce tools
See all- Workplace Safety Audit Checklist
- Stormwater Inspection Report Template
- RCRA Hazardous Waste Codes Reference (D, F Codes)
- EPCRA Tier II and Form R Reporting Readiness Checklist
- Overall Labor Effectiveness (OLE) Calculator
- Hazard Identification and Risk Ranking Worksheet
- Forklift Pre-Shift Inspection Checklist Template
- Forklift Pre-Shift Inspection Checklist
- LOTO Lockout Tagout Periodic Inspection Checklist
Keep exploring
Free tools
- Acid Base Neutralization Reagent Dose CalculatorWork out the mass of base needed to neutralize an acid stream and the resulting temperature rise.
- Endotoxin Limit and Maximum Valid Dilution CalculatorCalculate endotoxin limit from the threshold pyrogenic dose and the maximum dose, then the MVD for your LAL assay sensitivity.
- OSHA Manufacturing Safety ChecklistA printable plant inspection checklist organized by common OSHA general industry topics, with a companion quality defect checklist for factory walk-throughs.
ERP fixes and how-tos
- How to Send SyteLine Business Event Alerts to Infor Ming.leHow to turn SyteLine business events into Infor Ming.le alerts and notifications: event handlers, ION, recipients, noise control and a decision guide.
- DB Error 100 in Infor LN and Baan: Record or End of Set Not FoundDB error 100 in Infor LN or Baan means a record or end of set was not found. Learn the causes, how to trace it in the bshell and debugger, and handle it in 3GL.
Guides
- How to Set Up SyteLine REST API EndpointsComplete guide to configuring REST API endpoints in SyteLine CloudSuite Industrial. Learn IDO-based API exposure, authentication, rate limiting, and endpoint security.
- Infor LN Multi-Currency and Exchange Rate ManagementManage multi-currency operations in Infor LN with exchange rate tables, currency revaluation, translation setup, and hedging support for global enterprises.
- How to Set Up SyteLine XML Data ExchangeConfigure XML data exchange in SyteLine CloudSuite Industrial. Learn XML schema mapping, inbound/outbound processing, XSLT transformations, and automated file exchange.
AI on your ERP
- AI for ERP Credit Management: Limits, Holds and Exposure Without SpreadsheetsAI on your ERP for credit limit reviews, order hold triage and exposure questions. Read-only by default, role-aware and deployable on-prem.
- AI on SAP for Aerospace and Defense Manufacturers, Without the ITAR ExposureEvaluate SAP for aerospace and defense industrial AI: S/4HANA and ECC data access, serial genealogy, config control and quoting, with ITAR data kept in-house.