Developer ToolsFree referencePDF, Excel, Word export

WhatsApp Cloud API Error Codes Reference

When a WhatsApp Cloud API send fails, the response carries a numeric code that tells you whether to fix your request, wait, or change how you message. This table lets you look up the common codes and get the first thing to check.

Download:
CodeMeaningAreaFirst thing to check
0
AuthException: could not authenticate the app user
Auth
Regenerate the access token and confirm the app is still authorised
3
API method: capability or permissions issue
Auth
Check the app has whatsapp_business_messaging permission
10
Permission denied or removed
Auth
Check permissions granted to the system user token
100
Invalid parameter
Request
Compare the JSON body with the endpoint documentation
190
Access token expired or invalid
Auth
Replace short lived tokens with a system user token
368
Temporarily blocked for policy violations
Policy
Review the account quality and policy notices in Business Manager
80007
Rate limit issues at WhatsApp Business Account level
Throughput
Slow down and back off with jitter before retrying
130429
Cloud API throughput rate limit reached
Throughput
Queue sends and retry with exponential backoff
130472
User number is part of an experiment
Delivery
No action usually possible; retry later or use another channel
131000
Something went wrong
Server
Retry once, then raise with Meta support if it persists
131005
Access denied
Auth
Confirm the token owner is assigned to the WhatsApp Business Account
131008
Required parameter is missing
Request
Check the error details field for the missing parameter name
131009
Parameter value is not valid
Request
Check phone number format (digits with country code) and field types
131016
Service unavailable
Server
Check the Meta status page and retry later
131021
Recipient cannot be sender
Request
Do not send to the business phone number itself
131026
Message undeliverable
Delivery
Recipient may not be on WhatsApp, may have an old app version or has not accepted the terms
131030
Recipient phone number not in allowed list
Setup
Add the number to the test recipient list or move the app to live mode
131031
Account has been locked
Policy
Check for a verification or policy lock in Business Manager
131042
Business eligibility payment issue
Billing
Check the payment method and credit line on the account
131045
Incorrect certificate
Setup
Check phone number registration state and certificate
131047
Re-engagement message: more than 24 hours since the customer last replied
Window
Send an approved template message instead of a free form message
131048
Spam rate limit hit
Quality
Reduce unwanted messages; review block and report rates
131049
Message not delivered to maintain healthy ecosystem engagement
Quality
Check opt-in quality and message relevance for marketing sends
131051
Unsupported message type
Request
Check the type field against supported message types
131052
Media download error
Media
Check the inbound media ID and download it promptly with the token
131053
Media upload error
Media
Check the file type, size limit and MIME type
131056
Pair rate limit hit: too many messages to the same user in a short time
Throughput
Space out messages to one recipient and retry later
131057
Account in maintenance mode
Server
Retry after a short wait
132000
Template parameter count does not match
Template
Count the {{n}} variables in the approved template and match them
132001
Template does not exist in the language and locale
Template
Check the template name and the exact language code
132005
Translated text too long
Template
Shorten the variable values or the translation
132007
Template format character policy violated
Template
Review the template content against the messaging policy
132012
Template parameter format mismatch
Template
Check the parameter type (text, currency, date_time, media) against the template
132015
Template is paused
Template
Review quality rating and edit or replace the template
132016
Template is disabled
Template
Create a new template; disabled templates cannot be sent
133000
Previous deregistration attempt failed
Setup
Retry the deregister call before registering again
133004
Server temporarily unavailable
Server
Retry later
133005
Two step verification PIN mismatch
Setup
Check the six digit PIN used at registration
133006
Phone number needs to be verified before registering
Setup
Request and submit a verification code first
133010
Phone number not registered on the WhatsApp Business Platform
Setup
Call the register endpoint for the phone number ID

Codes and wording are summarised from Meta public documentation and can change. Always read the full error object (code, subcode, message, error_data.details) in the actual response, and confirm against the current Meta error code page.

Automate error triage

Optional review of how your ERP handles failed messaging calls and retries.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this reference

Search by code or by a word from the message text. Log the full error object on every failed send, not just the HTTP status, because several different problems share a 400 response. Use the Area column to decide who owns the fix: request errors are for the developer, setup and billing errors are for the account owner, and quality or policy errors are for whoever runs the messaging programme.

  • Request and Template errors are deterministic: fix the payload, do not retry blindly.
  • Throughput and Server errors are transient: retry with exponential backoff and jitter.
  • Window errors mean you must use an approved template, not free form text.
  • Quality and Policy errors need a human review of opt-in and content.

Why the error classes matter for retry logic

A retry loop that treats every failure the same either hammers a rate limit or retries a permanent error forever. Classify the code first. A 132001 will fail on every retry until the template name or language is corrected. A 130429 will usually succeed once load drops. A 131047 should switch the send path from a session message to a template message and, if your design allows, create a record that the customer window has closed.

Example: ERP shipment notification fails

An ERP posts a shipment confirmation to a customer, and the call returns 131047. The customer last wrote three days ago, so the 24 hour customer service window is closed. The fix is to send a utility template such as a shipment update with the order number and tracking link as variables. If it returns 132000 instead, the template has two variables and the code sent three, so check the mapping between ERP fields and template parameters.

Common mistakes

Teams often log only the message string, which is vague, and lose the numeric code that identifies the problem. Others hardcode a language such as en when the template was approved as en_US. Another frequent error is using a short lived token from the developer console in production, which then fails with 190 on a weekend.

Frequently Asked Questions

What does WhatsApp error 131047 mean?

It means you tried to send a free form message to a customer who has not messaged you in the last 24 hours. Outside that window only approved template messages are allowed, so resend using a template that fits the purpose.

How do I fix error 132000 on a template?

The number of parameters in your request does not match the variables in the approved template. Count the numbered placeholders in the template body, header and buttons, then send exactly that many components in the right order.

Is error 130429 a permanent failure?

No. It signals that you reached the Cloud API throughput limit for your number. Queue outgoing messages, retry with exponential backoff and jitter, and smooth bulk sends so they do not arrive in one burst.

Are these codes the complete list?

No. This is a working subset of frequently seen codes. Meta adds and changes codes over time, so treat the live documentation and the error details in your own responses as the authority.

If you want failed messaging calls from your ERP triaged and retried by class automatically, Netray can build that into your integration layer.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

Integrations