Zero Failure Success Run Sample Size Calculator
How many parts must you test, with no failures, to say a product is 95 percent reliable with 90 percent confidence? This calculator applies the success run theorem to answer that, and prices the answer in samples, money and weeks of test time.
Your numbers
Share of units expected to survive the test.
Part cost plus fixture, lab time and handling.
How many parts can be tested at the same time.
Your results
Binomial success-run method: assumes identical, independent samples and a test that represents field stress. Failure of any sample invalidates the zero-failure claim.
Samples required vs reliability target
Sweeps Reliability to demonstrate from 80 to 99, holding your other inputs fixed.
Link test evidence to part revisions
Optional: how to keep validation test results tied to the right part revision inside your ERP.
Optional. The tool and every export work without this. No spam.
How to use it
Set the reliability you must demonstrate and the confidence level. Typical pairs are 90/90, 95/90 and 95/95, and your design validation plan or customer test specification should state which applies. Enter the cost of each tested sample, your parallel test stations and the length of one cycle. The tool returns the sample count, total cost and the calendar time. Use the chart to see how quickly the sample size grows as the reliability target approaches 100 percent.
The formula
If every one of n samples survives, the probability of that happening when true reliability is R equals R to the power n. Setting that equal to one minus confidence C gives n = ln(1 - C) / ln(R), rounded up. For 95 percent reliability at 90 percent confidence this yields 45 samples, at 95 percent confidence 59 samples. The rule of three, n about 3 / (1 - R), is the quick version at 95 percent confidence.
What a pass means
A pass says you have statistical grounds to claim at least R reliability at confidence C for the tested conditions and life. It does not say the product will last longer than the test, and it does not cover failure modes not stressed in the test. If a failure occurs, you can still use success-run variants that allow one or more failures, but they need more samples, and the test plan should say so in advance.
Common mistakes
Treating a short test as proof of a long field life is the biggest one. Another is testing samples from a single lot, which cannot reflect lot-to-lot variation, so draw from several lots or setups. Others include changing the test mid-run, dropping a failed sample as an outlier without root cause, and quoting reliability with no confidence level.
Frequently Asked Questions
Why are 59 samples used so often?
59 samples with zero failures demonstrates 95 percent reliability at 95 percent confidence, since 0.95 to the power 59 is about 0.05. It is a common sample size in validation plans.
What if one sample fails?
The zero-failure claim no longer holds. You must either find a root cause and restart, or use a larger sample plan that allows failures, which needs a different formula and more parts.
Is this the same as AQL sampling?
No. AQL plans accept or reject lots based on defect counts. Success-run testing demonstrates reliability for design or process validation at a chosen confidence level.
Can I reduce the sample size?
Only by lowering reliability or confidence, by testing to a more severe stress with a validated acceleration factor, or by using prior data through Bayesian methods that your customer accepts.
Netray can help tie validation test results to part numbers, lots and revisions in your ERP or quality system, so evidence survives engineering changes.
Related Tools
Cpk Confidence Bound and Sample Size Calculator
An observed Cpk of 1.8 from 30 parts does not mean the true value is 1.8. See the confidence interval and how sample size changes it.
Quality & InspectionPPAP Initial Process Study Ppk Calculator
Enter spec limits, mean and overall standard deviation from your initial process study to get Pp, Ppk, expected PPM and the sigma reduction needed to hit your target.
SAPSAP QM Zero Acceptance Sample Size Calculator
Find how many units to inspect when the rule is accept on zero defects, for a given lot size, LTPD and consumer risk.
Quality & InspectionSpecial Characteristics Ppk Tracker Worksheet
One row per special characteristic: enter limits, mean and standard deviation to see Pp, Ppk, PPM and the shortfall against 1.67.
More Quality & Inspection tools
See all- PPAP Submission Level Requirements Reference
- PPAP Part Submission Warrant Template
- APQP Timing Plan Worksheet
- IATF 16949 Internal Audit Checklist
- Run at Rate Calculator
- PPAP Dimensional Results Worksheet
- Customer Specific Requirements Matrix Worksheet
- APQP Phase Gate Checklist
- PFMEA Worksheet with RPN for PPAP
Keep exploring
Free tools
- Medical Device Success Run Validation Sample Size CalculatorCalculates the zero-failure sample size needed to claim a reliability at a confidence level, and splits it across your PQ lots.
- Zero Acceptance Sample Size Calculator (Confidence and Reliability)Success-run sample size for c=0 plans: how many conforming pieces prove a reliability at a given confidence, with inspection time.
- Zero-Failure Reliability Demonstration Sample Size CalculatorFind the number of units that must survive a test with no failures to claim a reliability level at a chosen confidence, and the total test effort.