Success Run Sample Size Calculator for Medical Device Validation
Process validation and design verification protocols for medical devices need a statistical rationale for sample size. The success run theorem gives the smallest zero-failure sample for a stated reliability and confidence. Enter your targets and get a number you can paste into the protocol.
Your numbers
Minimum proportion of units that must conform, for example 95, 99 or 99.9.
Samples are split evenly across lots in this simple view.
Your results
Zero-failure plans only. If a failure is possible or allowed, use a plan that permits an acceptance number. Confirm your rationale against your own validation procedure.
Sample size vs required reliability
Sweeps Required reliability from 90 to 99.5, holding your other inputs fixed.
Validation evidence from your ERP
Want lot, serial and inspection data pulled into your validation protocols automatically? We can review your setup.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Set the reliability the characteristic must demonstrate and the confidence level your procedure requires. Many companies tie these to the risk class of the failure mode, with higher severity getting higher reliability and confidence. The result is the number of consecutive conforming units needed. If you run PQ across several lots, the tool divides the total across lots and rounds up so you never end up short of the statistical minimum.
The method behind it
If the true conforming proportion is R, the chance that n units all conform is R to the power n. To claim reliability R with confidence C, that chance must be at most 1 minus C when all n pass. Solving gives n = ln(1 - C) / ln(R). For 95% reliability at 95% confidence this gives 59 units, and for 99% at 95% it gives 299.
- 95/95 requires 59 units with zero failures
- 99/95 requires 299 units with zero failures
- 99/99 requires 459 units with zero failures
- A single failure invalidates the plan and requires a larger sample
Reading the result and common mistakes
The sample size applies to attribute or pass/fail results, not to measured variables where a tolerance interval or capability index is more efficient. Sampling should be representative across the lot, shifts and operators, not the first units off the line. Teams often forget that a single failure in a zero-failure plan means retesting with a bigger sample, so plan test capacity and unit cost accordingly. Document the reliability and confidence choice with a link to the risk file.
Frequently Asked Questions
Where does the 59 in 95/95 come from?
From ln(0.05) divided by ln(0.95), which is about 58.4, rounded up to 59. All 59 units must conform. Rounding down would give less than the claimed confidence, so the result is always rounded up.
What if one unit fails?
The zero-failure plan no longer supports the claim. You need either a larger zero-failure sample after investigation and correction, or a plan designed with an acceptance number of one or more, which needs a larger starting sample.
Can I use this for variable data?
You can, but it is conservative. For measurable characteristics with a normal distribution, a one-sided tolerance interval or capability analysis typically needs far fewer units. Use attribute plans when data is pass/fail.
How do I choose reliability and confidence?
Link them to risk. Many procedures set higher values for failure modes with higher severity or probability in the risk analysis. Your own quality procedure should state the table, and the protocol should cite it.
If your validation protocols pull part counts and lot data from the ERP by hand, we can help automate the sample plan and evidence collection inside your own environment.
Related Tools
Medical Device Lot Acceptance OC Curve Calculator
Shows the chance a lot is accepted at a given defect rate for your sample size and acceptance number, plus average outgoing quality.
Costing & FinanceMedical Device Cost of Poor Quality Calculator
Totals prevention, appraisal, internal failure and external failure costs and shows COPQ as a share of revenue.
Quality & InspectionSterilization D-Value and SAL Log Reduction Calculator
Calculates log reduction, resulting sterility assurance level exponent and minimum exposure time from bioburden and D-value.
Quality & InspectionMedical Device Complaint Rate Trending Calculator
Calculates complaints per 1,000 units, compares against a baseline, and flags a statistical signal using a Poisson upper control limit.
More Quality & Inspection tools
See all- CAPA Corrective and Preventive Action Form Template
- Device History Record (DHR) Template
- ISO 13485 Internal Audit Checklist
- Process Validation IQ OQ PQ Template
- Medical Device Complaint Handling Form Template
- ISO 14971 Risk Management Worksheet
- Sterilization Load Record Template
- Medical Device Design Verification Protocol Template
- Medical Device Supplier Evaluation Scoring Worksheet
Keep exploring
Free tools
- Zero Failure Success Run Sample Size CalculatorCompute the zero-failure sample size n = ln(1 - confidence) / ln(reliability) for design validation and PPAP test planning.
- ISO 13485 Sample Size CalculatorCalculate a statistically justified sample size for ISO 13485 inspection and process validation using confidence and reliability, with a finite lot adjustment.
- Zero-Failure Reliability Demonstration Sample Size CalculatorFind the number of units that must survive a test with no failures to claim a reliability level at a chosen confidence, and the total test effort.
Guides
- Pricing IQ/OQ/PQ Process Validation Into a Medical Device QuoteHow medical device contract manufacturers price process validation: IQ/OQ/PQ scope, sample sizes, protocol writing, re-validation triggers and billing.
- Medical Device ERP: What ERP for Medical Device Manufacturers Must DoMedical device ERP explained: what ERP for medical device manufacturers must do for DHR, lot and UDI traceability, Part 11, QMSR and ISO 13485, and how to choose.
- How to Quote Medical Device Contract Manufacturing WorkHow medical device contract manufacturers build a quote: materials with certs, cleanroom labor, validation, inspection, sterilization handoffs and NRE.
AI on your ERP
- AI on Infor SyteLine for Medical Device Manufacturers: Genealogy, DHR and Audit EvidencePrivate AI on Infor SyteLine for medical device makers: lot and serial genealogy, DHR assembly, UDI and QMSR evidence, with human approval on every write.
- AI on SAP Business One for Medical Device Manufacturers: Traceability and Records Retrieval Without Touching the Validated StatePrivate AI on SAP Business One for medical device manufacturers: UDI, lot and serial traceability, supplier records, DHR retrieval. Read-only, on-prem, QMSR-aware.