Choosing an Epicor partner for multi-site distribution and inventory

On Epicor Kinetic, multi-site distribution is built from sites, warehouses and bins, transfer orders between sites, inter-company trading between legal entities, and Advanced Material Management for handheld picking and put-away. A partner worth hiring designs those around your physical network and will also tell you when one of Epicor's distribution ERPs, Prophet 21 or Eclipse, is the better fit.

When this makes sense

  • You manufacture in one place and stock finished goods in several warehouses, and nobody trusts the available quantity shown for another site.
  • Stock moves between sites by email and manual adjustments instead of transfer orders, so in-transit inventory is invisible.
  • You are opening a distribution center and need it running in Kinetic with scanning from day one.
  • Separate legal entities buy and sell to each other and inter-company invoices are reconciled by hand.
  • You are a wholesale distributor comparing Kinetic with Prophet 21 and Eclipse.

What the engagement covers

Site, warehouse and bin design

Sites for planning and costing boundaries, warehouses for physical stock, and bin structures and zones that match racking, with non-nettable bins for quarantine and returns.

Transfer orders and in-transit

Transfer order entry, shipping and receiving between sites, in-transit tracking and costing of transfers.

Multi-site planning

Part plant settings per site, sourcing rules that tell MRP whether to buy, make or transfer, and planning for a central distribution center feeding branches.

Inter-company trading

Inter-company purchase orders that create sales orders in the sister company, pricing between entities and reconciliation of balances.

Advanced Material Management and scanning

AMM for handheld receipt, put-away, picking, packing and cycle counts, plus label printing and device setup.

Replenishment and accuracy

Min, max and reorder points by site and warehouse, safety stock, ABC cycle counting and bin accuracy targets.

How it runs

  1. 1

    Network and product fit review (2-4 weeks)

    • Map sites, entities, flows and volumes
    • Compare Kinetic fit with Epicor distribution ERPs if relevant
    • Agree target site and warehouse model
  2. 2

    Design (2-4 weeks)

    • Design bins, transfer flows and sourcing rules
    • Define inter-company process and pricing
    • Select scanning devices and label formats
  3. 3

    Configure and load (4-10 weeks)

    • Configure sites, warehouses and AMM
    • Load part plant and warehouse settings
    • Set up replenishment parameters
  4. 4

    Pilot and roll out by site (2-6 weeks per wave)

    • Pilot in one warehouse with full scanning
    • Train receivers, pickers and planners
    • Track accuracy and adjust before the next site

What you get

  • Site, warehouse and bin design document
  • Transfer and sourcing rule matrix per part class
  • Inter-company process and reconciliation procedure
  • AMM device, label and workflow configuration
  • Replenishment parameter set by site
  • Inventory accuracy and cycle count procedure

What drives cost and effort

Number of sites and warehousesEach adds configuration, parameter loads and a rollout wave.
Scanning scopeFull AMM with devices, labels and Wi-Fi checks adds hardware and process work compared with keyboard transactions.
Inter-company volume and rulesMany entities with transfer pricing and currency differences add setup and reconciliation design.
Bin and part data qualityUnlabelled bins and inaccurate on-hand need a physical count and cleanup before scanning can work.
Product decisionIf the review concludes a distribution ERP fits better, the project becomes a selection and migration, a far larger effort.

Fixed-scope site addition

Adding one warehouse or distribution center to an existing Kinetic setup.

Phased multi-site program

Redesigning inventory across several sites and entities with scanning.

Advisory and product fit review

Deciding between Kinetic, Prophet 21 and Eclipse before committing.

Questions to ask any Epicor consultant

How would you model our sites, warehouses and bins, and why?

Site boundaries drive planning and costing; getting them wrong is expensive to undo.

When would you advise Prophet 21 or Eclipse instead of Kinetic?

A neutral partner explains product fit even if it means a different team does the work.

Have you rolled out AMM scanning in a live warehouse?

Scanning success depends on floor workflow, labels and devices, not just configuration.

How will MRP decide between buying and transferring?

Without sourcing rules, branches buy what the distribution center already holds.

How do you measure inventory accuracy before and after?

Accuracy targets make the project's value visible and keep scanning discipline.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Stock moves outside transfer orders.

Remove manual adjustment rights for transfers and report on adjustments weekly.

Scanning launched on inaccurate bins.

Count and label bins before go-live and start cycle counting immediately.

Inter-company balances do not reconcile.

Use inter-company trading flows rather than manual journals and reconcile each period.

Kinetic chosen for a pure distribution business it fits less well.

Run a product fit review before implementation.

If you are a pure wholesale distributor with branch counter sales, rebates and large catalogs, Prophet 21 or Eclipse may serve you better than Kinetic. If you have two sites with occasional transfers, your Epicor admin can likely configure transfer orders without outside help. A partner pays off when several sites, entities and scanning have to work together.

Frequently asked questions

Does Epicor Kinetic handle multi-site inventory?

Yes. Kinetic uses sites, warehouses and bins, with transfer orders between sites and planning settings per site.

What is Epicor Advanced Material Management?

AMM is the Kinetic module for handheld warehouse transactions such as receiving, put-away, picking, packing and counting.

Should a distributor choose Kinetic, Prophet 21 or Eclipse?

Manufacturers that also distribute often fit Kinetic; wholesale distributors frequently fit Prophet 21 or Eclipse. The deciding factors are pricing, counter sales, catalog size and manufacturing needs.

How are sales between our companies handled?

Kinetic's inter-company trading creates linked purchase and sales transactions between companies, reducing manual reconciliation.

How does Netray help?

Netray engineers and partner Epicor specialists design multi-site setups, and can add AI that answers stock and transfer questions over live Kinetic data, read-only and respecting roles.

Talk to a Epicor consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get Epicor ERP alerts

Support and maintenance deadlines, release changes that affect Epicor ERP sites, and new free Epicor ERP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.