Epicor EOQ and Lot Sizing Calculator
Lot size decides how often you set up machines or raise purchase orders, and how much cash sits on the shelf. This calculator gives the classic economic order quantity, rounds it to a realistic multiple, and prices the result. It is aimed at the people who maintain order quantity rules on the Epicor Part Plant planning screen.
Your numbers
Setup labor and burden for a job, or PO handling cost for a buy part.
Capital, storage, handling, obsolescence and insurance, as a percent of unit cost.
Pack size or supplier multiple from the Part Plant planning screen.
Your results
Classic EOQ assumes steady demand, no quantity discounts and no capacity limits.
Rounded EOQ vs cost per setup
Sweeps Cost per order or setup from 10 to 500, holding your other inputs fixed.
Lot size review
Optional: send us a part list and we will review order quantities against setup cost and demand.
Optional. The tool and every export work without this. No spam.
How to use it
Enter annual demand, then the cost of one order. For a make part that is setup hours multiplied by the setup rate, plus burden. For a buy part it is the handling cost of a PO line. Add the unit cost and a carrying rate; 15 to 30 percent is typical. The multiple is the pack size or the supplier rule you maintain in Epicor. The rounded EOQ is what you would consider keying as the order quantity. Compare the total cost at that value against your current setting.
The EOQ formula
EOQ equals the square root of two times annual demand times cost per order, divided by holding cost per unit per year. At the EOQ, annual ordering cost equals annual holding cost, and total cost is flat near the optimum, which is why rounding to a pack size rarely hurts. The chart shows that quadrupling the setup cost only doubles the lot size, because of the square root.
- Halve setup time and EOQ falls by about 29 percent
- Double demand and EOQ rises by about 41 percent
- Total cost is shallow near the optimum, so round freely
Using the result with MRP
MRP applies minimum, maximum and multiple quantities when it turns requirements into suggestions. A fixed lot size from EOQ will produce a steady pattern of jobs and POs, but it can overbuild when demand is lumpy. For make-to-order parts, lot-for-lot is usually right and EOQ should be ignored. Use this tool for repeat parts with stable demand and meaningful setup cost, and review the result when the setup time changes after a process improvement.
Common mistakes
The most common error is a carrying rate that omits obsolescence, which pushes lot sizes too high. The second is using list unit cost when a price break changes the picture; check the break quantity separately. Finally, EOQ ignores capacity: a large lot on a bottleneck machine can starve other jobs, so check the resulting run time before committing.
Frequently Asked Questions
Should I use EOQ for every part?
No. EOQ suits repeat parts with steady demand and real setup cost. Make-to-order and lumpy parts usually do better with lot-for-lot planning, and parts with price breaks need the discount logic checked as well.
What carrying cost rate is realistic?
Many manufacturers use between 15 and 30 percent of unit cost per year. Include cost of capital, storage, handling, insurance, shrinkage and obsolescence. Ask finance for the rate they use so the numbers match.
Why round to a multiple?
Suppliers ship in packs and shop jobs often run in standard tray or pallet counts. Rounding up to the multiple keeps the order practical, and the cost penalty is usually small because total cost is flat near the optimum.
How does this relate to Epicor min and max quantity?
Epicor lets you set minimum, maximum and multiple order quantities on Part Plant planning. EOQ is one way to choose a sensible value for these fields. It does not replace judgement about capacity or shelf life.
If you would like lot size and safety stock suggestions generated for your whole part master from Epicor data, we can set that up as a reviewed report.
Related Tools
Epicor Safety Stock and Reorder Point Calculator
Turn demand variability, lead time and a target service level into the safety stock and reorder point you key into Epicor Part Plant planning.
EpicorEpicor Resource Group Burden Rate Calculator
Convert monthly overhead and productive hours into a burden rate per hour, add labor, and see the cost per piece for a routing operation.
EpicorEpicor Quote Price and Quantity Break Calculator
Build a unit price from material, labor, setup and subcontract cost, hit a target margin, and see how the price falls with quantity.
EpicorEpicor Job Cost Variance Worksheet
Compare estimated and actual material, labor and burden for closed jobs, and rank where the largest overruns occur.
More Epicor tools
See all- Epicor Kinetic Job Status Reference
- Epicor BAQ Query Template Generator
- Epicor BPM Directive Design Template
- Epicor DMT Import Template Worksheet (Part and BOM)
- Epicor MRP Run Checklist
- Epicor Kinetic Upgrade Checklist
- Epicor REST API v2 URL Builder
- Epicor Security Group Design Worksheet
- Epicor Shop Floor OEE Calculator
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor Kinetic AI Assistant Sizing and Value CalculatorEstimate GPUs, vector index size, hours saved and payback for a private AI assistant on Epicor Kinetic on-premises.
- EOQ with Vendor Minimum Order CalculatorFind the economic order quantity, then see what a vendor minimum order quantity costs you per year and how many days of stock it forces.
- Epicor Kinetic Upgrade ChecklistA phase-by-phase upgrade checklist covering inventory, testing, integrations, cutover and rollback for Epicor Kinetic.
ERP fixes and how-tos
- How to Complete an Operation in Epicor Kinetic (Plus Time Entry and Corrective Action)Complete an operation in Epicor Kinetic through MES or Labor Entry, plus time and expense entry, customer managed inventory and corrective action, with what to check first.
- How to Add AI to Epicor Kinetic On-Premises Without Moving Your DataReference architecture for a private AI assistant on Epicor Kinetic on-premises: BAQ and REST v2 access, SQL replica, local LLM, roles, audit and rollout.
- Convert Epicor Classic Dashboards to KineticHow to convert Epicor Classic dashboards to Kinetic during an upgrade: what carries over, what must be rebuilt, and how to verify each dashboard.
AI on your ERP
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
- AI for Epicor Kinetic Quality: Non-Conformances, CAPA, Inspection and TraceabilityAI for Epicor Kinetic quality: summarize non-conformances, find repeat defects, draft CAPA and trace lots, with audit-ready logs and on-prem deployment.
Integrations
- How to add AI agents to Epicor KineticHow to add AI agents to Epicor Kinetic: a tool layer over the REST v2 API and BAQs, MRP exception triage, PO expediting, and human approval before any write.
- How to add an AI chatbot to Epicor KineticAdd an AI chatbot to Epicor Kinetic: an internal assistant for planners and buyers or a customer portal bot, grounded in BAQs and runnable fully on-prem.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.