Epicor PartTran Transaction Types: STK-MTL, PUR-STK, MFG-STK and More
Every inventory movement in Epicor writes a row to PartTran with a TranType such as STK-MTL or PUR-STK. The code reads as from-to, but it is easy to forget. This lookup explains each common code in plain language.
| TranType | From | To | Meaning | Typically created by |
|---|---|---|---|---|
STK-STK | Stock | Stock | Inventory transfer between bins or warehouses | Inventory Transfer, Warehouse Transfer |
STK-MTL | Stock | Job material | Material issued from stock to a job | Issue Material, backflush on labor |
MTL-STK | Job material | Stock | Unused job material returned to stock | Return Material |
PUR-STK | Purchase | Stock | Purchase receipt put directly into stock | Receive Purchase Order |
PUR-MTL | Purchase | Job material | Purchase receipt sent straight to a job (direct) | Receive Purchase Order with job destination |
PUR-INS | Purchase | Inspection | Purchase receipt held for inspection | Receive Purchase Order for inspected parts |
PUR-UKN | Purchase | Unknown | Receipt where cost is recorded but destination is not fixed yet | Receipt entry and later matching |
MFG-STK | Manufacturing | Stock | Finished quantity from a job received into stock | Receipt to Inventory from job |
MFG-INS | Manufacturing | Inspection | Job completion sent to inspection | Job receipt for inspected parts |
MFG-CUS | Manufacturing | Customer | Job output shipped directly to the customer | Customer Shipment from a job |
STK-CUS | Stock | Customer | Shipment of stock to a customer | Customer Shipment Entry |
STK-INS | Stock | Inspection | Stock moved into inspection | Inspection processing |
INS-STK | Inspection | Stock | Passed inspection quantity moved to stock | Inspection Processing |
INS-MTL | Inspection | Job material | Passed inspection quantity sent to a job | Inspection Processing with job destination |
INS-DMR | Inspection | Discrepant material | Failed quantity sent to a discrepant material record | Inspection Processing with reject |
DMR-STK | Discrepant material | Stock | Disposition of a DMR as use as is or rework back to stock | Material Review Disposition |
ADJ-QTY | Adjustment | Stock | Quantity adjustment from a count or manual correction | Inventory Quantity Adjustment |
The table lists the common standard codes. Your release may add or label codes differently, so run SELECT DISTINCT TranType FROM Erp.PartTran in a BAQ to see what your company actually uses before building reports on this list.
Inventory transaction audit help
Optional: we can review a PartTran reconciliation approach with you and show how to automate it read-only.
Optional. The tool and every export work without this. No spam.
How to read a TranType
A TranType has two three-letter parts separated by a hyphen. The first part is where quantity came from and the second is where it went. STK is stock, MTL is job material, MFG is manufacturing output of a job, PUR is a purchase receipt, INS is inspection, CUS is a customer, and DMR is discrepant material. So STK-MTL is stock issued to a job and MTL-STK is the return of unused material. Once you know the vocabulary, most codes decode themselves.
Using the codes in BAQs and audits
Filter PartTran by TranType and a date range to answer common questions: what was issued to jobs this week (STK-MTL minus MTL-STK), what the receiving dock put away (PUR-STK plus PUR-MTL), and what finished production received (MFG-STK). Always filter by TranDate because PartTran is one of the largest tables in the database and an unfiltered scan is slow.
- Net issues to a job: STK-MTL minus MTL-STK
- Receipts by day: PUR-STK, PUR-MTL, PUR-INS
- Production output: MFG-STK, MFG-INS, MFG-CUS
- Cycle count variances: ADJ-QTY
Common mistakes
People often sum quantities across all types and get nonsense because transfers appear as a single row that is neither a gain nor a loss. Another mistake is ignoring that direct-to-job receipts (PUR-MTL) never touch stock, so a stock reconciliation that only counts PUR-STK will not agree with purchasing. Finally, cost columns on PartTran reflect the cost method of that moment, so compare cost to GL postings using the posting date rather than recalculating.
Frequently Asked Questions
What does STK-MTL mean in Epicor?
STK-MTL is material moved from stock to a job's material line, which is a job issue. It reduces on-hand quantity and adds to the job's issued quantity and cost. The reverse movement is MTL-STK, the return of unused material to stock.
Where do I see all TranTypes my system uses?
Run a BAQ or SQL query with SELECT DISTINCT TranType from Erp.PartTran. That lists exactly the codes present in your data and avoids guessing, since add-ons and configuration can introduce additional types.
Why do receipts to a job not show in stock?
Direct receipts to a job use PUR-MTL, which never lands in a bin. The material is charged to the job immediately. Stock-based reports will miss it, so include PUR-MTL when reconciling purchasing receipts.
Is PartTran safe to query often?
Query it with a TranDate range and a PartNum or JobNum filter. Large unfiltered queries over years of transactions are slow and can hurt other users, so schedule heavy analysis off peak.
Netray can add a read-only question layer over PartTran so planners and controllers can ask for issues, receipts and adjustments by job or part and see the SQL behind each answer.
Related Tools
Epicor Kinetic Database Tables Reference
Look up the main Erp.* tables in Epicor Kinetic with what each holds and the columns that identify a row. Useful when writing BAQs and SQL.
EpicorEpicor Job Material Shortage SQL Generator
Build a query that lists unissued job material for released, open jobs so planners can chase shortages.
EpicorEpicor Business Object Services Reference
Find the service name and REST path for common Epicor business objects such as JobEntry, SalesOrder and PO.
EpicorEpicor Kinetic Go-Live Readiness Checklist
A cutover checklist for a new Epicor Kinetic implementation or major re-implementation, grouped by data, security, integrations, people and support.
More Epicor tools
See all- Epicor Kinetic Job Status Reference
- Epicor BAQ Query Template Generator
- Epicor BPM Directive Design Template
- Epicor DMT Import Template Worksheet (Part and BOM)
- Epicor MRP Run Checklist
- Epicor Kinetic Upgrade Checklist
- Epicor REST API v2 URL Builder
- Epicor Security Group Design Worksheet
- Epicor Safety Stock and Reorder Point Calculator
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor BPM Directive Types ReferenceLookup table of Epicor BPM directive types, when each runs, whether it can stop a save, and typical use.
- Epicor Kinetic Job Status ReferenceA searchable lookup of the job lifecycle flags and related fields in Epicor Kinetic job entry, so you can build BAQs and dashboards with the right filter.
- Epicor Kinetic Upgrade ChecklistA phase-by-phase upgrade checklist covering inventory, testing, integrations, cutover and rollback for Epicor Kinetic.
ERP fixes and how-tos
- Epicor Kinetic Costing Workbench: Part Cost, Rollup and Material BurdenHow Epicor Kinetic part cost works: the Costing Workbench, cost rollup for standard cost, material burden, and a practical cost review routine.
- How to Copy a Part in Epicor, Add Revisions and Customer Cross-ReferencesHow to copy a part in Epicor Part Maintenance, add a revision to a new part, set up customer part cross-references and find fixed asset numbers in Epicor 10 and Kinetic.
- Why Is Epicor So Slow? A Kinetic Performance ChecklistDiagnose slow Epicor Kinetic: separate client, app server, SQL Server, BAQ and network causes, with a step-by-step checklist and ways to tell slow from down.
AI on your ERP
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
- Getting Epicor Kinetic Data Ready for AI: Part Master, BAQs, UD Fields and Job DataHow to get Epicor Kinetic and ERP 10 data ready for AI: part master, revisions, UD fields, BAQs as definitions, labor and job data quality, security groups.
Integrations
- How to add AI agents to Epicor KineticHow to add AI agents to Epicor Kinetic: a tool layer over the REST v2 API and BAQs, MRP exception triage, PO expediting, and human approval before any write.
- How to add an AI chatbot to Epicor KineticAdd an AI chatbot to Epicor Kinetic: an internal assistant for planners and buyers or a customer portal bot, grounded in BAQs and runnable fully on-prem.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.