Epicor Shop Floor OEE Calculator
OEE is the standard way to say how much of your planned time produced good parts at the ideal rate. This calculator takes the numbers you can pull from Epicor labor and production reporting, such as clock time, quantity completed and scrap, and returns availability, performance, quality and OEE.
Your numbers
Shift length minus planned breaks and planned maintenance.
Fastest sustainable cycle from the routing or machine rating.
Your results
Performance is computed from the numbers you enter. If pieces produced stays fixed while downtime changes, the chart shows a mathematical effect, not a prediction.
OEE vs unplanned downtime
Sweeps Unplanned stops and changeovers from 0 to 120, holding your other inputs fixed.
OEE from your Epicor data
Optional: see how OEE could be computed automatically from labor and production reporting.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the planned production time for the machine and shift, the unplanned stops and changeovers you recorded, the ideal cycle time for the part, the total pieces produced and how many were rejected. In Epicor, quantities and scrap come from labor and production reporting against the job operation, while downtime reasons come from whatever stop codes your shop floor module captures. The result is a single OEE percentage plus the three factors behind it, so you see which one to attack first.
The formulas
Availability is run time divided by planned time. Performance is the ideal cycle time multiplied by total pieces, divided by run time. Quality is good pieces divided by total pieces. OEE is the product of the three. The tool caps performance at 100 percent, because exceeding it normally means the ideal cycle time is wrong rather than the machine being faster than possible.
- World-class OEE is often quoted near 85 percent, but this varies by process
- Many discrete shops sit between 40 and 65 percent
- Always compare like with like on the same machine
Reading the default example
The default shift loses 45 of 480 minutes to stops, so availability is about 91 percent. Performance is roughly 90 percent and quality about 98 percent, giving OEE near 80 percent. The chart shows that every 10 minutes of extra downtime costs about two points of OEE in this setup. That conversion helps justify quick-changeover work or a maintenance fix.
Common mistakes
The biggest data problem is ideal cycle time. Using the routing standard that was padded years ago makes performance look better than it is. Another is counting rework as good pieces, which inflates quality. Finally, do not compare OEE across very different machines without normalizing for how planned time is defined; scheduled maintenance and breaks must be treated the same way.
Frequently Asked Questions
Where do I get the inputs from Epicor?
Quantities and scrap come from labor and production reporting on the job operation, and clock or run time comes from labor detail. Downtime depends on how your shop records stops, so check which reason codes you use.
What is a good OEE?
A figure around 85 percent is often cited as world class, but typical discrete manufacturing is far lower. Use your own trend by machine and focus on the biggest of the three losses.
Why is performance capped at 100 percent?
A value above 100 means pieces were made faster than the ideal time, so the ideal is probably too slow or the count is wrong. Capping prevents inflated OEE while you fix the standard.
Does OEE include planned maintenance?
Not in this calculator. Planned time excludes breaks and scheduled maintenance. If you want to include them, use total calendar time instead, which gives a measure called TEEP.
If you would like OEE and downtime reasons pulled from your Epicor data into a live view, we can build a read-only dashboard on your own infrastructure.
Related Tools
Epicor Resource Group Burden Rate Calculator
Convert monthly overhead and productive hours into a burden rate per hour, add labor, and see the cost per piece for a routing operation.
EpicorEpicor Job Cost Variance Worksheet
Compare estimated and actual material, labor and burden for closed jobs, and rank where the largest overruns occur.
EpicorEpicor Shop Floor Labor Reporting SOP Template
A fill-in standard operating procedure for how operators clock on, report quantities, record scrap and close operations in Epicor.
EpicorEpicor Safety Stock and Reorder Point Calculator
Turn demand variability, lead time and a target service level into the safety stock and reorder point you key into Epicor Part Plant planning.
More Epicor tools
See all- Epicor Kinetic Job Status Reference
- Epicor BAQ Query Template Generator
- Epicor BPM Directive Design Template
- Epicor DMT Import Template Worksheet (Part and BOM)
- Epicor MRP Run Checklist
- Epicor Kinetic Upgrade Checklist
- Epicor REST API v2 URL Builder
- Epicor Security Group Design Worksheet
- Epicor EOQ and Lot Sizing Calculator
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor Shop Floor Labor Reporting SOP TemplateA fill-in standard operating procedure for how operators clock on, report quantities, record scrap and close operations in Epicor.
- Epicor Kinetic Upgrade ChecklistA phase-by-phase upgrade checklist covering inventory, testing, integrations, cutover and rollback for Epicor Kinetic.
- Epicor Kinetic AI Assistant Sizing and Value CalculatorEstimate GPUs, vector index size, hours saved and payback for a private AI assistant on Epicor Kinetic on-premises.
ERP fixes and how-tos
- How to Calculate OEE from MES Data and ERP StandardsHow to calculate OEE correctly from MES events and ERP routing standards: planned time, availability, performance, quality, ideal cycle time and common data traps.
- How to Complete an Operation in Epicor Kinetic (Plus Time Entry and Corrective Action)Complete an operation in Epicor Kinetic through MES or Labor Entry, plus time and expense entry, customer managed inventory and corrective action, with what to check first.
- Epicor Kinetic Dashboard Examples (Shop Floor, Sales, Purchasing) and How to Add FiltersPractical Epicor Kinetic dashboard examples for shop floor, sales and purchasing, with the tables to query and how to add filters and parameters.
Guides
- Epicor vs Infor: Should You Switch ERP Platforms?Compare Epicor Kinetic vs Infor CloudSuite for manufacturing. Functional analysis, migration costs, and decision framework for switching platforms.
- Job Shop ERP Software Comparison: JobBOSS, E2 Shop System, ProShop and Global ShopJob shop ERP software compared for CNC machine shops: JobBOSS2, E2 Shop System, ProShop, Global Shop Solutions and Epicor Kinetic, and the questions to ask.
- Real-Time Manufacturing Analytics: Architecture and PaybackReal-time manufacturing analytics: streaming ERP and machine data with CDC, Kafka, and materialized views to deliver sub-minute shop floor visibility.
AI on your ERP
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
- AI for Epicor Kinetic Job Shops: Quote History, Job Variance and Schedule RiskPrivate AI for Epicor Kinetic job shops: quote-to-job history, JobHead and JobOper variance, subcontract delays and schedule risk, via REST and BAQs.
Integrations
- How to add a mobile app to Epicor KineticBuild or choose a mobile app for Epicor Kinetic: barcode scanning, labor reporting, inventory moves and approvals over the REST API, with offline handling.
- How to add AI agents to Epicor KineticHow to add AI agents to Epicor Kinetic: a tool layer over the REST v2 API and BAQs, MRP exception triage, PO expediting, and human approval before any write.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.