Choosing an implementation partner for Epicor warehouse management
Most Epicor Kinetic warehouse projects start with Kinetic's own warehouse features, bins, lot and serial tracking, cycle counting and the Advanced Material Management module for material queues and handheld transactions, before anyone considers a separate WMS. A good implementation partner will tell you which of your warehouse problems Kinetic already solves, which need mobile scanning hardware and process change, and which genuinely need a third-party WMS integrated to Kinetic. Judge partners on warehouse floor experience as much as Epicor configuration skill.
When this makes sense
- Inventory accuracy is poor, cycle counts never reconcile and MRP plans against stock that is not really there.
- Pickers walk paper pick lists around the building and shipping errors are a top customer complaint.
- You are adding a second warehouse or moving buildings and want bins and scanning designed in from day one.
- You are live on Kinetic without Advanced Material Management and want to know whether to license it or buy a WMS.
- A previous handheld rollout stalled because devices, labels and transactions were never fully set up.
What the engagement covers
Warehouse and bin design
Warehouse codes, bin naming, zones and bin types in Kinetic, with primary bins per part and rules for non-nettable and inspection locations.
Advanced Material Management
Material queue setup for picks, put-aways and moves, handheld or mobile transactions for receipts, issues, transfers and shipments, and the security for each device user.
Picking, packing and shipping
Fulfillment Workbench allocation and reservation, pick list generation, Customer Shipment Entry packouts, carton and pallet labels, and carrier integration where used.
Labels and barcodes
Part, bin, lot and serial label formats, label printing from Kinetic, and scanner configuration so every scan resolves to a valid Kinetic record.
Inventory control
Cycle count groups and frequencies by ABC class, count tolerance rules, lot and serial tracking where customers or regulators require it.
Third-party WMS option
If Kinetic features fall short (high-volume waves, slotting, labor management), design the integration boundary: who owns bins, allocations and inventory balances.
How it runs
- 1
Floor assessment (1-3 weeks)
- Walk receiving, storage, picking and shipping with supervisors
- Measure current count accuracy and pick error rates
- Map transactions to Kinetic features and licenses
- 2
Design (2-4 weeks)
- Bin and zone design with naming conventions
- Material queue and handheld transaction design
- Label, device and Wi-Fi requirements
- 3
Build and pilot (4-8 weeks)
- Configure warehouses, bins and queues in a test company
- Pilot scanning in one zone or one process
- Adjust labels and screens from floor feedback
- 4
Rollout and wall-to-wall count (2-4 weeks)
- Physical count to set accurate bin balances
- Train by role on the actual devices
- Daily accuracy and exception reviews for the first month
What you get
- Warehouse and bin map with naming rules loaded into Kinetic
- Transaction design per role: receive, put away, pick, move, count, ship
- Label templates and device configuration guide
- Cycle count program with ABC classes and tolerances
- Role-based work instructions with screenshots from your devices
- Accuracy baseline and 30-day post go-live comparison
What drives cost and effort
| Number of warehouses and bins | Bin design, labeling and the initial count scale with the physical footprint, not just transaction counts. |
| Licensing and hardware | Advanced Material Management licenses, rugged devices, label printers and Wi-Fi survey work are separate costs that often decide the timeline. |
| Lot and serial requirements | Full traceability adds label formats, scan steps and testing for every transaction type. |
| Third-party WMS | Integrating a separate WMS adds interface design, inventory reconciliation and a second system to support. |
| Data accuracy at start | Unreliable on-hand balances mean a wall-to-wall count and cleanup before scanning can be trusted. |
| Shift coverage for training | Multi-shift warehouses need training and go-live support across shifts, which extends on-site time. |
Assessment then fixed-scope rollout
Companies unsure whether Kinetic features are enough, who want a recommendation before committing to licenses or a WMS.
Time and materials with an on-site pilot
Complex buildings where process design will change once scanning is tested on the floor.
Post go-live support retainer
Warehouses that want help tuning queues, labels and counts over the first few months without a full project team.
Questions to ask any Epicor consultant
Which of our problems would you solve with standard Kinetic and AMM before suggesting a WMS?
A partner who jumps to a third-party WMS may be selling software rather than solving your floor problems.
Have you set up material queues and handheld transactions live, and can we talk to the warehouse lead there?
Configuration in a test company is easy; floor adoption is where projects fail.
What devices, label printers and Wi-Fi checks do you require before go-live?
Hardware gaps are the most common reason scanning projects slip.
How will you set accurate starting balances in every bin?
Scanning on top of bad balances destroys trust in the new process within weeks.
How do you design cycle counting so it actually gets done?
Count programs that are too ambitious get abandoned; good partners size them to labor available.
What is your current relationship with Epicor, and how do we verify it?
Partner status changes over time; confirm it with your Epicor account manager rather than relying on a logo.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Bins defined but stock not actually moved or labeled to match.
Label every bin and run a wall-to-wall count before go-live, then lock bin changes to a controlled process.
Users bypass handhelds and post transactions at a desktop later.
Design the process so scanning is faster than the old way and monitor transactions posted without devices.
Wi-Fi dead spots cause failed scans and duplicate transactions.
Survey the building and fix coverage before rollout, and test in freezers, mezzanines and yard areas.
Allocation rules in Fulfillment Workbench do not match customer priorities.
Agree allocation and reservation policy with sales and test it with real backorder scenarios.
Third-party WMS and Kinetic disagree on inventory.
Define one owner for bin-level balances and run a daily reconciliation report.
Many small and mid-size Epicor warehouses get most of the benefit from clean bin design, labels and a disciplined cycle count program in standard Kinetic, before buying any add-on. Epicor's own services team or the partner who implemented your ERP can often configure this. A specialist partner earns its cost when you add handheld scanning across multiple buildings, need lot or serial traceability, or are weighing a third-party WMS.
Frequently asked questions
Does Epicor Kinetic include warehouse management?
Kinetic includes multi-warehouse inventory with bins, lot and serial tracking and cycle counting. Advanced Material Management adds material queues and handheld transactions for directed work. High-volume operations sometimes add a third-party WMS for slotting, waves and labor management.
Do we need Advanced Material Management for barcode scanning?
For directed handheld work such as queued picks and put-aways, yes in most setups. Simple label printing and scanning into desktop screens can work without it, but you lose the queue-driven workflow.
How long does an Epicor warehouse rollout take?
A single site commonly takes two to four months from assessment to stable scanning, longer with multiple buildings, lot and serial tracking or a third-party WMS. Hardware lead times and the starting count often set the pace.
Should we buy a separate WMS?
Consider one when you run high pick volumes with wave planning, need slotting optimization, labor standards or complex 3PL billing. Otherwise, a separate WMS adds an interface and a second inventory record to manage.
How does Netray help Epicor warehouses?
Netray works with partner Epicor specialists on warehouse design and can add private AI over Kinetic data, for example answering why a part shows stock that cannot be found or which bins are driving count variances.