Epicor Shopify integration for Kinetic and Prophet 21

An Epicor Shopify integration moves web orders into Epicor Kinetic or Prophet 21, sends available stock and prices back to Shopify, and returns shipment tracking and invoices to the customer. It can be built with a prebuilt connector, an integration platform or custom code against Epicor's REST or P21 APIs and the Shopify Admin API. The hard part is not the connection, it is agreeing which system owns each piece of data.

When this makes sense

  • Staff retype Shopify orders into Kinetic Sales Order Entry or P21 Order Entry, and errors show up as wrong ship-to addresses or missed items.
  • Shopify oversells because stock is updated by spreadsheet once a day instead of from Epicor on-hand and allocations.
  • You are moving B2B customers to Shopify Plus and need customer-specific prices, payment terms and credit limits from Epicor.
  • Returns are handled in Shopify but never reach Epicor RMA processing, so inventory and credits drift apart.
  • You run several Shopify stores or regions and need each to map to the right Epicor company, site and warehouse.

What the engagement covers

Order flow into Epicor

Shopify order webhooks or polling create sales orders in Kinetic through the SalesOrder service on REST v2, or in P21 through its API, with customer matching or creation, ship-to handling, shipping method mapping, discounts, tax lines and payment reference stored on the order.

Product and variant mapping

Map Shopify products and variants to Epicor parts: one part per variant, or a configured part when options drive a Kinetic configurator. Decide where descriptions, images and web attributes live, since Epicor rarely holds marketing content.

Inventory availability

Publish available quantity per Shopify location from Epicor on-hand less allocations and safety stock, by warehouse. Use a BAQ exposed through the BAQ service or an Epicor Function for Kinetic, or a P21 inventory query, and push changes rather than full refreshes where volume is high.

Pricing and B2B

Retail prices may stay in Shopify, but B2B on Shopify Plus usually needs Epicor price lists or P21 price libraries reflected in Shopify catalogs, plus payment terms and credit status from the Epicor customer record.

Fulfillment and tracking

When Epicor Customer Shipment Entry (Kinetic) or P21 shipping confirms a pack, post the fulfillment, carrier and tracking number back to Shopify so the customer gets a shipping notice.

Returns, refunds and payments

Map Shopify returns to Kinetic RMA processing or P21 return orders, and record Shopify payouts as cash receipts or deposits so AR and the bank reconcile.

Monitoring and error handling

An error queue for orders that fail validation (unknown part, closed customer, tax mismatch), retries for API timeouts, and alerts so nobody discovers a stuck order from an angry customer.

How it runs

  1. 1

    Design (2-3 weeks)

    • Agree system of record for customers, items, prices and stock
    • Map Shopify fields to Epicor objects
    • Choose connector, platform or custom build
    • Define error handling and alerting
  2. 2

    Build (3-8 weeks)

    • Order, inventory and fulfillment flows first
    • Pricing, returns and payouts second
    • Configure API keys and least-privilege Epicor users
    • Unit test against an Epicor test company
  3. 3

    Test and launch (2-4 weeks)

    • End-to-end tests with real order scenarios
    • Volume test for sale or peak days
    • Parallel run with manual checking
    • Go live with monitoring and hypercare

What you get

  • Field mapping document for orders, customers, items, inventory and fulfillments
  • System of record decision for each data type
  • Working order, inventory, fulfillment and returns flows
  • Error queue and alerting with a runbook for common failures
  • Test evidence for edge cases such as split shipments and partial refunds
  • Credential and API key inventory with owners

What drives cost and effort

Prebuilt connector versus customA packaged connector shortens build time but adds a subscription and may not fit configured parts or B2B pricing; custom builds fit exactly but need maintenance.
B2B requirementsCustomer-specific pricing, terms, credit holds and quotes add significant mapping and testing compared with simple retail orders.
Catalog complexityMany variants, kits, configured products or serial and lot tracked items increase mapping and availability logic.
Number of stores, warehouses and companiesEach store, Shopify location and Epicor site or company adds routing rules and test cases.
Order volume and peaksHigh volume needs queuing, paging and throttling on both APIs; low volume can run on simple scheduled jobs.
Epicor deploymentEpicor Cloud tenants rely on REST v2, Functions and supported tools; on-premises sites have more options but must secure inbound access.

Fixed-scope connector implementation

Retail or simple B2C flows where a packaged connector covers orders, stock and tracking.

Custom build with time and materials cap

B2B, configured products or unusual fulfillment rules that packaged connectors do not handle.

Build plus monitored support

Companies where web orders are revenue-critical and someone must watch the error queue every day.

Questions to ask any Epicor consultant

Have you integrated Shopify with Kinetic or with Prophet 21 specifically?

The two Epicor products have different APIs, pricing models and order structures; experience with one does not transfer fully.

How will you keep stock accurate during a busy sale?

Overselling is the most visible failure. Ask how often availability updates and how allocations and safety stock are handled.

What happens when an order fails to import?

There should be a visible error queue with clear reasons and a retry path, not orders silently dropped.

Who owns the connector after launch, and what happens at Shopify API version changes?

Shopify retires API versions on a schedule, and Epicor releases change services. Someone must update the integration.

How are customer records matched without creating duplicates?

Duplicate customers break credit control, pricing and reporting in Epicor.

How will taxes be calculated and kept consistent between Shopify and Epicor?

Tax mismatches between the web checkout and the Epicor invoice cause AR and compliance headaches.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Duplicate or mismatched customers

Match on email and a stored Shopify customer ID, and route guest checkouts to a defined web customer or creation rule.

Oversells from stale availability

Publish availability changes frequently from Epicor with a safety buffer, and reserve stock at order import.

Integration user with excessive rights

Use a dedicated Epicor user and API key limited to the services the integration calls.

Silent failures after an API change

Monitor error rates, pin API versions, and test against new Shopify API versions before the old one retires.

Tax and rounding differences

Decide which system calculates tax, pass totals explicitly, and test multi-line discount and shipping scenarios.

If you sell a few hundred simple products to consumers with modest volume, a packaged connector configured by your internal team may be all you need. If your B2B customers mostly reorder known parts, compare Shopify Plus against Epicor's own commerce option or a B2B portal built for distributors before committing. A custom build only pays off when your pricing, configuration or fulfillment rules are genuinely unusual.

Frequently asked questions

Does Epicor have a native Shopify connector?

Shopify integrations with Epicor are usually delivered through third-party connectors, integration platforms or custom builds on Epicor's REST or P21 APIs. Check current options with Epicor and connector vendors, and test them against your pricing and product structure.

Which Epicor API should we use for Kinetic?

REST v2 is the current choice, using an API key plus user authentication. Use business object services for transactions such as sales orders, the BAQ service for reads, and Epicor Functions when you want a single stable endpoint that wraps several steps.

Can Shopify Plus B2B show Epicor customer pricing?

Yes, by syncing Epicor price lists or P21 pricing into Shopify catalogs and company accounts, or by calling Epicor for a price at checkout. Real-time price calls are more accurate but add latency and dependency on Epicor being available.

What about Epicor POS or retail systems?

Epicor's retail and building materials products, such as its point of sale systems for hardware and lumber dealers, are separate from Kinetic and Prophet 21 and use their own integration methods. This page covers Kinetic and P21.

How long does a Shopify Epicor integration take?

A packaged connector for simple retail flows can be live in a few weeks. A custom B2B integration with pricing, returns and multiple warehouses commonly takes two to four months including testing.

Talk to a Epicor consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get Epicor ERP alerts

Support and maintenance deadlines, release changes that affect Epicor ERP sites, and new free Epicor ERP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.