EpicorFree calculatorPDF, Excel, Word exportEpicor KineticAll Epicor ERP (Kinetic, 10, 9, Vantage) tools

Epicor REST API Paging and Throughput Calculator

Pulling a large table through Epicor REST with a tiny page size makes thousands of round trips, while a huge page risks timeouts. This calculator shows the duration, request count and throughput for any page size and parallelism so you can choose with numbers.

Your numbers

records
500 records
ms

Network, authentication and query setup for each request.

ms
threads

Respect your license, server capacity and any API limits.

KB

Your results

Total duration
0.9 min
Throughput (records/second)
2,353
Requests needed
240
Time per request
850
Total duration (seconds)
51
Data transferred (MB)
175.7813

Model assumes fixed latency plus linear per-record time. Very large pages can time out or strain memory, so test on your own system and keep pages moderate.

Free, optional. Reopen it on any device.
Save results:

Total duration vs page size

Sweeps Page size ($top) from 10 to 2000, holding your other inputs fixed.

Epicor data pipeline design

Optional: talk through an extract or integration design with someone who has built them.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter the number of records, the page size you plan to request with $top, and your measured fixed latency per call. Add per-record time and the number of parallel requests. The tool returns the request count, time per request, total duration and records per second, and the chart shows duration across page sizes so you can see where larger pages stop helping.

  • Measure latency by calling a tiny page such as $top=1.
  • Page with $top and $skip, or use a stable ordering key for safety.
  • Add $select to return only the columns you need.

The math

Requests equal records divided by page size, rounded up. Each request costs fixed latency plus page size times per-record time. Total time is requests times request time, divided by the number of parallel threads. Throughput is records divided by total seconds. Because latency is paid per call, larger pages remove overhead until per-record time dominates and the curve flattens.

Practical guidance

The chart typically falls steeply and then flattens, so beyond a few hundred to a couple of thousand records the gain is small while risk grows. Skip-based paging gets slower on deep pages in some queries, so filtering by a date or key range and extracting in slices is often safer. Run extracts off-hours and keep concurrency modest to protect users.

Common mistakes

Extracting without $select drags every column over the wire. Using one thread for a huge table wastes time, while too many threads can slow the whole server. Failing to handle token expiry on long jobs and not retrying transient errors are common causes of half-finished extracts. Log the last successful page so you can resume.

Frequently Asked Questions

What page size should I start with?

A few hundred to a thousand records is a sensible start for many tables. Test a couple of sizes against your system and watch response time and server load, then settle on the lowest size that keeps duration acceptable.

Should I use BAQ endpoints or table services?

BAQ endpoints let you shape and filter data on the server and return only needed fields, which often suits extracts. Table services suit simple reads and writes. Choose by the shape of the data you need.

Are there API rate limits?

Limits depend on your Epicor deployment, licensing and configuration. Check with your administrator or Epicor documentation, and design the job to back off and retry on throttling responses.

How do I avoid missing rows while paging?

Order by a stable unique key and, ideally, filter by a time or key range rather than relying on deep skip values, so changes made during the extract do not shift your pages.

If you are building a data pipeline out of Epicor, Netray can help design it with proper paging, retries and read-only safeguards. The calculator stands alone.

Get Epicor ERP alerts

Support and maintenance deadlines, release changes that affect Epicor ERP sites, and new free Epicor ERP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Epicor ERP: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Comparisons

Software