Integrating a wholesale order entry app or B2B portal with Epicor

A two-way wholesale integration with Epicor sends orders from a rep app, trade show tablet or customer portal into Kinetic sales orders automatically, and sends customer-specific prices, available stock, order status, shipments and invoices back out. The design question is which data must be live (credit status, availability) and which can sync on a schedule (catalog, price lists). Epicor Commerce Connect, B2B commerce platforms and dedicated rep ordering apps can all do this; the integration pattern is similar across them.

When this makes sense

  • Sales reps write orders on paper or in spreadsheets at customer sites and trade shows, and inside sales rekeys them into Kinetic.
  • Wholesale customers phone or email reorders and want to see their own prices, open orders and invoices online.
  • You sell to retailers or dealers and need customer-specific catalogs, minimums and case packs enforced at order time.
  • Your current portal shows list price or stale stock because it syncs once a night.
  • Orders submitted online still need someone in customer service to approve and release them in Kinetic.

What the engagement covers

Catalog and product data

Parts, descriptions, images, sales UOMs and case packs, product groups and customer-specific item visibility published from Kinetic to the app or portal.

Customer-specific pricing

Kinetic price lists by customer and price group, quantity breaks and contract pricing, either replicated on a schedule or priced live through the Kinetic sales order price calculation.

Availability

On-hand, allocated and available quantities by warehouse, and promise dates where available-to-promise is used, with caching to protect Kinetic from heavy polling.

Order submission

Orders created as OrderHed, OrderDtl and OrderRel through the REST API v2 or an Epicor Function, with ship-to, PO number, need-by dates and order holds applied by BPM rules.

Credit and holds

Credit limit and credit hold checks before submission, and clear messaging to the rep or buyer when an order lands on hold.

Status back to the buyer

Order acknowledgments, shipment and tracking numbers, invoices and statements returned to the portal, and email notifications.

Offline rep ordering

Rep apps that cache catalog and price data on the device for trade shows, then submit queued orders with duplicate protection when back online.

How it runs

  1. 1

    Requirements and data audit (2-3 weeks)

    • Define which data is live versus scheduled
    • Audit part, image and UOM data quality
    • Review pricing rules and exceptions
  2. 2

    Integration design (2-3 weeks)

    • Choose API, middleware or vendor connector
    • Design order validation and hold logic
    • Plan caching and API load limits
  3. 3

    Build and test (4-8 weeks)

    • Build catalog, price, stock and order flows
    • Test real customer pricing scenarios
    • Test offline order queues and duplicate handling
  4. 4

    Pilot and rollout (2-4 weeks)

    • Pilot with a few reps or customers
    • Monitor failed orders daily
    • Roll out by region or customer group

What you get

  • Data ownership and sync frequency matrix
  • Order mapping from app or portal to Kinetic sales order objects
  • Pricing test set covering every price list and break type in use
  • Integration build with logging, retries and duplicate protection
  • Exception dashboard for orders that fail or land on hold
  • Support runbook for customer service and IT

What drives cost and effort

Pricing complexityMany customer-specific price lists, rebates and promotions push toward live pricing calls, which need careful performance design.
Product data qualityMissing images, inconsistent descriptions and UOMs need cleanup before any portal looks credible.
Live versus batch dataReal-time stock and price add API load and caching design; nightly sync is cheaper but risks overselling.
Offline supportOffline-capable rep apps need device-side storage, conflict handling and duplicate detection.
Number of order channelsPortal, rep app, EDI and marketplace each need their own mapping and validation into the same Kinetic order logic.
Platform choiceA platform with a maintained Epicor connector shortens build time; a custom app means building and owning every flow.

Fixed-scope connector implementation

Distributors choosing a platform with an existing Epicor connector who need configuration, mapping and testing.

Custom integration on time and materials

Companies with a bespoke rep app or complex pricing that no off-the-shelf connector handles.

Managed integration service

Teams without in-house integration staff who want monitoring, fixes and changes handled monthly.

Questions to ask any Epicor consultant

How will customer-specific prices reach the app, and how do you prove they match Kinetic?

Price mismatches are the fastest way to lose buyer trust and create credit memos.

What happens to an order submitted for a customer on credit hold?

The answer shows whether the design respects Kinetic credit control or bypasses it.

How do you stop duplicate orders when an offline device reconnects twice?

Idempotent submission with a unique app order ID is essential for rep apps.

How much API traffic will this put on our Kinetic environment?

Polling stock for thousands of items can slow Kinetic for internal users, especially in cloud tenants.

Which order validations run in the app and which in Kinetic BPMs?

Duplicated logic drifts; keep rules authoritative in one place.

Who supports the integration after go-live, and how quickly?

Orders stuck in a queue during a busy season cost sales immediately.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Overselling because availability is stale.

Sync availability frequently for fast movers and check live stock at checkout for large orders.

Orders bypass credit and pricing controls.

Create orders through Kinetic business logic so holds and price calculations apply, never by writing tables directly.

Duplicate orders from retries or reconnects.

Store the source order ID on the Kinetic order and reject repeats.

Portal performance suffers from slow ERP calls.

Cache catalog and pricing, and reserve live calls for checkout and order status.

Customer service loses visibility of web orders.

Flag web and rep orders by entry source and build a dashboard of orders awaiting release.

If you sell to a modest number of wholesale accounts with simple pricing, a commerce platform with a maintained Epicor connector, or Epicor's own commerce product, may need only configuration and data cleanup rather than custom integration work. Also check whether EDI already covers your largest accounts. Custom integration pays off when pricing is complex, reps need offline ordering, or several channels must feed the same Kinetic order logic.

Frequently asked questions

Can a B2B portal show customer-specific Epicor pricing?

Yes. Either replicate Kinetic price lists and breaks to the portal on a schedule, or call Kinetic to price the cart at checkout. Live pricing is more accurate but needs performance testing and caching.

How do orders get into Epicor Kinetic automatically?

Through the Kinetic REST API v2 or an Epicor Function that creates the sales order header, lines and releases using standard business logic, so pricing, holds and BPM validations still run.

Will a rep app work offline at trade shows?

Many rep ordering apps cache catalog, price and customer data on the device and queue orders until a connection returns. The integration must detect duplicates and re-price or flag orders whose prices changed in the meantime.

Is Epicor Commerce Connect required?

No. It is Epicor's own commerce product for its ERPs, but any B2B platform or custom app can integrate through APIs or middleware. Compare connector maturity, pricing support and total cost.

How does Netray approach wholesale integrations?

Netray engineers, with partner Epicor specialists, build the order and pricing flows and use AI agents to generate pricing test cases from your real price lists, so mismatches are found before customers see them.

Talk to a Epicor consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get Epicor ERP alerts

Support and maintenance deadlines, release changes that affect Epicor ERP sites, and new free Epicor ERP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.