SAP S/4HANA consulting services and architecture advice
S/4HANA consulting is the advisory and design work around the platform: which edition and release to run, how the simplified data model changes your processes and reports, and how to extend and integrate without trapping future upgrades. It sits before and alongside implementation or conversion, and it is also what established S/4HANA customers buy when they need an architecture review or a second opinion.
When this makes sense
- Leadership needs to understand how S/4HANA differs from ECC before approving a program
- You are already on S/4HANA and upgrades are getting harder because of custom code
- Your reporting broke after go-live because custom reports read tables that S/4HANA replaced
- You need to decide where extensions should live: in the core, in ABAP Cloud, or on BTP
- Your partner's proposal includes architecture choices you cannot evaluate internally
What the engagement covers
Architecture comparison with ECC
S/4HANA runs only on the SAP HANA database and simplifies the data model: the universal journal ACDOCA merges GL, CO, asset and material ledger postings, MATDOC replaces MKPF and MSEG for material documents, aggregate tables are replaced by compatibility views, and business partner replaces separate customer and vendor masters.
Edition and release strategy
Public cloud with SAP-applied releases twice a year, or private cloud and on-premise on a release cycle that from the 2023 release moved to roughly every two years with longer mainstream maintenance and feature packs in between.
Extensibility architecture
A three-tier model: key user extensions, developer extensions in ABAP Cloud using released APIs, and classic ABAP only where unavoidable, with ATC checks to keep custom code compliant. Side-by-side BTP apps for logic that serves multiple systems.
Integration architecture
Released OData V2 and V4, SOAP and event APIs, SAP Integration Suite as the middleware layer, and a plan for retiring PI/PO, whose 7.5 release reaches end of mainstream maintenance in 2027.
Analytics architecture
Embedded analytics on virtual data model CDS views for operational reporting, and Datasphere, BW/4HANA or a non-SAP platform for cross-system analytics, with ODP and CDS-based extraction.
Security and roles
Business roles and catalogs for Fiori, authorisation design, and segregation of duties tooling such as SAP Access Control or cloud identity services.
Code and data health reviews
Custom code analysis with ATC, usage data from SCMON or UPL, and data volume management for fast-growing tables such as ACDOCA and MATDOC.
How it runs
- 1
Discovery (1-3 weeks)
- Review landscape, release levels and support package stacks
- Collect custom code and usage statistics
- Interview process owners and IT leads
- 2
Analysis (2-5 weeks)
- Run ATC with S/4HANA readiness checks or cloud readiness checks
- Map reports and interfaces to replaced tables and released APIs
- Assess integration and analytics architecture
- 3
Recommendations (1-3 weeks)
- Write target architecture and extension guidelines
- Prioritise remediation and simplification work
- Present options with trade-offs to leadership
- 4
Optional design support (Ongoing)
- Review partner designs and specifications
- Join architecture boards during a program
- Re-run code checks before each release upgrade
What you get
- Current versus target architecture diagrams
- Extension guidelines with a decision tree for in-app, ABAP Cloud and BTP
- Custom code findings grouped by simplification item and usage
- Integration inventory mapped to released APIs and middleware
- Analytics strategy covering embedded analytics and enterprise data platform
- Prioritised recommendations with effort ranges
What drives cost and effort
| Custom code volume | Tens of thousands of custom objects require more analysis time, even with ATC automation, especially when usage data is missing. |
| Number of systems | Each connected SAP and non-SAP system adds interfaces to analyse and architecture options to compare. |
| Current release level | Older S/4HANA releases or ECC on old enhancement packages need more remediation analysis and upgrade path planning. |
| Depth of deliverable | A one-page direction differs greatly from a detailed design authority role across a multi-year program. |
| Documentation quality | Missing specifications for interfaces and custom code means reverse engineering, which adds days. |
Fixed-scope architecture review
Customers who want a defined report and recommendations in a set number of weeks.
Time and materials design authority
Programs that need a senior architect to review designs and decisions over many months.
Retainer for release and code governance
S/4HANA customers who want periodic ATC runs, upgrade planning and architecture advice without a full-time architect.
Questions to ask any SAP S/4HANA consultant
How would you classify our custom code, and which tools would you run?
Look for ATC with S/4HANA or ABAP Cloud check variants, usage data from SCMON or UPL, and a plan to retire unused objects rather than fix everything.
Where would you draw the line between in-app and side-by-side extensions?
Sensible answers depend on latency, data ownership and who maintains the code, not on a blanket preference for BTP.
Which of our reports will break on S/4HANA and why?
A consultant who understands compatibility views, ACDOCA and MATDOC can predict this. Vague answers mean surprises later.
How do you plan for PI/PO end of maintenance?
Interfaces are often the longest pole. A credible plan lists interfaces by migration pattern and effort.
What would you not change?
Good architects protect working parts of the estate rather than rebuilding everything.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Architecture decided by default
Publish extension and integration guidelines early and run every new design through them.
Custom code moved without pruning
Use usage data to retire unused objects before remediation. Many estates carry large shares of code nobody runs.
Reporting gaps after go-live
Inventory reports early, map them to CDS views or analytics content and test them with real users.
Analytics platform sprawl
Decide the role of embedded analytics, Datasphere, BW and any non-SAP platform before building new content.
If you have a strong internal SAP architect and a straightforward landscape, SAP's own Readiness Check, ATC and the Simplification Item Catalog may give you most of the analysis without a consultant. SAP also offers advisory services to customers on premium support plans. Bring in outside consulting when the decisions are large, contested, or need an independent view of a partner's design.
Frequently asked questions
What is the biggest architectural change from ECC to S/4HANA?
The simplified data model on the HANA database. The universal journal combines finance and controlling postings, many aggregate and index tables disappear, and customer and vendor master data move to business partner.
Can S/4HANA run on a database other than HANA?
No. S/4HANA requires SAP HANA, while ECC could run on several databases. Moving to S/4HANA from ECC on another database therefore includes a database migration, often done with SUM and its Database Migration Option.
What is clean core?
Clean core is SAP's guidance to keep the ERP close to standard: extend through released APIs and stable interfaces, avoid modifications, and move custom logic to ABAP Cloud or BTP. It reduces the effort and risk of each release upgrade.
How often does S/4HANA release?
Public cloud releases arrive twice a year and SAP applies them. Private cloud and on-premise releases moved to a roughly two-year cycle starting with the 2023 release, with feature pack stacks in between and longer mainstream maintenance per release.
Where does AI fit in S/4HANA architecture?
SAP offers Joule and embedded AI features in its cloud products, which may be enough for many users. Companies that need AI over ERP data on their own infrastructure, for example under export control rules, can run private models against read-only APIs, which is the kind of work Netray does.