SAPFree referencePDF, Excel, Word exportSAP S/4HANAAll SAP S/4HANA (on-premise) tools

SAP S/4HANA Key Simplifications Reference

S/4HANA is not a version upgrade, it is a data model and functional change. This reference lists the simplifications that most often drive effort in an ECC conversion, with the action each one usually forces.

Download:
AreaIn ECCIn S/4HANATypical project action
Master data
Separate customer (KNA1) and vendor (LFA1) masters
Business Partner (BP) is the leading object; CVI keeps customer and vendor records in sync
Run CVI synchronization and clean duplicates before conversion
Master data
Material number 18 characters (MATNR)
Material number field length extended to 40 characters
Check interfaces, IDocs, custom fields and files that assume 18 characters
Inventory
Material documents in MKPF and MSEG
MATDOC is the single material document table; MKPF and MSEG remain as compatibility views
Review custom code that writes to or joins the old tables
Finance
Line items split across BSEG, COEP, FAGLFLEXA, ANEP and others
Universal Journal (ACDOCA) holds one set of line items for FI, CO, asset and Material Ledger
Plan reconciliation and report redesign; aggregates become views
Finance
Classic General Ledger or New G/L
New G/L logic is embedded in the Universal Journal; classic G/L is not supported
Migrate to New G/L first if you are still on classic
Finance
Classic Asset Accounting
New Asset Accounting is mandatory
Convert asset accounting and review depreciation areas
Finance
Cost elements as separate CO master data
Cost elements are G/L accounts with an account type
Align chart of accounts and cost element settings
Finance
Material Ledger optional
Material Ledger is always active; actual costing remains optional
Activate and convert Material Ledger during the project
Finance
Classic credit management (FD32)
SAP Credit Management (FSCM) with UKM_BP
Migrate credit segments and scores
Finance
Classic cash management
SAP Cash Management based on bank accounts and the Universal Journal
Redesign cash position reporting and liquidity forecast
Sales
Pricing conditions in KONV
Pricing conditions in PRCD_ELEMENTS
Fix custom code selecting from KONV
Sales
Classic rebate processing (VBO1)
Settlement Management with condition contracts
Migrate open rebate agreements
Sales
Output control with NAST
Output management based on BRFplus is the strategic approach; NAST still works for compatibility
Plan form and output migration, test print and email
Production
Classic MRP (MD01)
MRP Live (MD01N) runs in the database
Test planning results and custom MRP user exits
Warehouse
Classic Warehouse Management (WM)
Classic WM remains usable; embedded EWM is the strategic option
Decide whether to keep WM or move to embedded EWM
Procurement
SAP SRM
SRM is not part of S/4HANA; functions move to S/4HANA procurement or SAP Ariba
Map SRM scenarios to a target solution
Planning
SAP APO
APO is replaced by embedded PP/DS or SAP Integrated Business Planning
Decide planning landscape before the conversion plan
Foreign trade
SD Foreign Trade
Replaced by SAP Global Trade Services
Scope GTS if you export or import under licenses
Real estate
Classic Real Estate (RE)
Flexible Real Estate Management (RE-FX)
Migrate classic RE contracts to RE-FX before conversion
Technology
Any supported database, non-Unicode possible
SAP HANA database and Unicode only
Complete Unicode conversion first if needed
Technology
SAP GUI dynpro as main UI
SAP Fiori launchpad is the default user experience; SAP GUI still works
Define roles and Fiori app scope

General guidance only. The authoritative list is the Simplification Item Catalog and the SAP Readiness Check for your own source release and target release.

Get a second opinion on your simplification scope

Send your Readiness Check output and we will give you a short written review of what looks under or over scoped.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this list

Search by area or object name and read across the row: what you have in ECC, what exists in S/4HANA, and what the project normally has to do. Use it in workshops to decide which items are in scope before you run the SAP Readiness Check, then confirm each item against your own system results. Export to Excel and add columns for owner, status and effort so it becomes the working register for the program.

  • Filter by area to assign each row to a functional lead
  • Mark rows that your landscape does not use and record why
  • Add the matching Simplification Item number from the catalog

Where the real effort sits

Most conversions are dominated by three themes: Business Partner and CVI for master data, the Universal Journal for finance, and custom code that reads or writes tables whose structure changed, such as MKPF, MSEG, KONV and the finance line item tables. Functional replacements such as credit management, rebates and SRM add scope when you actually use them. A site that does not use rebates has no rebate migration, so usage data matters more than the headline list.

What this list does not replace

The official Simplification Item Catalog contains hundreds of items and changes with each release. This page is a summary for planning conversations. Always run the Simplification Item Check and the Readiness Check against the exact source and target releases, and record the check results as evidence. Items also differ between system conversion, selective data transition and new implementation approaches.

Frequently Asked Questions

Is this the official SAP simplification list?

No. It is a planning summary of well-known changes. The official source is the Simplification Item Catalog and the check reports run against your own system, which are release specific and far more detailed.

Do all of these items apply to every conversion?

No. Applicability depends on the modules you use. If you never used SRM, APO or classic rebates, those rows do not create work. Always confirm with usage data and the SAP check reports.

Which item usually causes the most delay?

Business Partner and CVI data quality, and custom code touching changed tables, tend to cause the longest delays because they require data cleansing and developer time before technical conversion can start.

Does the list differ for greenfield projects?

In a new implementation you do not convert old structures, but you still must migrate master and open item data into the new model, so Business Partner, Universal Journal and Material Ledger decisions still apply.

If you want help turning the check results and custom code findings into a prioritized remediation backlog, Netray can review the output with you.

Get SAP S/4HANA alerts

Support and maintenance deadlines, release changes that affect SAP S/4HANA sites, and new free SAP S/4HANA tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP S/4HANA: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP S/4HANA? Start with the SAP S/4HANA guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Software