SAPFree referencePDF, Excel, Word exportSAP ECC 6.0All SAP ECC 6.0 tools

SAP ECC MM and SD Tables Replaced in S/4HANA

This reference lists the SAP ECC 6.0 logistics tables that were removed, merged or turned into calculated compatibility views in SAP S/4HANA, with the successor object and the effect on custom ABAP. It covers MM inventory, SD, credit, rebates and the MRP planning file; finance tables are on a separate page.

Download:
ECC tableECC purposeS/4HANA successorCompatibility viewImpact on custom codeSimplification item / note
MKPF
Material document header
MATDOC (header fields are columns of each MATDOC line)
NSDM_V_MKPF
SELECT still works through the redirect view; INSERT/UPDATE/DELETE on MKPF is not supported. Read MATDOC directly in new code.
Inventory Management data model, SAP Note 2206980
MSEG
Material document item
MATDOC
NSDM_V_MSEG
Reads are redirected; heavy MSEG selects without key fields get slower, not faster, through the view. Rewrite hot paths against MATDOC or released CDS views.
SAP Note 2206980
MARD
Storage location data incl. stock quantities
Master data stays in MARD; stock quantities calculated on the fly from MATDOC
NSDM_V_MARD
Stock fields (LABST, INSME, SPEME ...) are computed at read time. Do not write stock fields; select only the columns you need.
SAP Note 2206980
MCHB
Batch stocks
Quantities calculated from MATDOC
NSDM_V_MCHB
Same rule as MARD: read-only stock fields, avoid SELECT *.
SAP Note 2206980
MKOL
Special stocks from vendor (consignment)
Quantities calculated from MATDOC
NSDM_V_MKOL
Reads redirected; direct updates not supported.
SAP Note 2206980
MSLB
Special stocks with vendor (subcontracting)
Quantities calculated from MATDOC
NSDM_V_MSLB
Reads redirected; direct updates not supported.
SAP Note 2206980
MSKA
Sales order stock
Quantities calculated from MATDOC
NSDM_V_MSKA
Reads redirected; MTO stock reports with large WHERE ranges need a performance test.
SAP Note 2206980
MSPR
Project stock
Quantities calculated from MATDOC
NSDM_V_MSPR
Reads redirected; direct updates not supported.
SAP Note 2206980
MSKU
Special stocks with customer (consignment at customer)
Quantities calculated from MATDOC
NSDM_V_MSKU
Reads redirected; direct updates not supported.
SAP Note 2206980
MARC (stock fields)
Plant data, including plant-level stock fields
Plant master data stays in MARC; stock-type fields calculated from MATDOC
NSDM_V_MARC
Master data reads are unaffected; any code that reads or writes MARC stock fields goes through the calculated view.
SAP Note 2206980
MARDH, MCHBH, MKOLH, MSLBH, MSKAH, MSPRH, MSKUH, MARCH
Stock history (previous period) tables
Period stock derived from MATDOC
Redirect view per table; check the proxy object shown in SE11
Period-end stock reports still run but the H tables are no longer filled the ECC way. Retest any Z period-stock report.
SAP Note 2206980
MBEW (quantity and value fields)
Material valuation
Valuation in the Universal Journal (ACDOCA) and material ledger tables
MBV_MBEW
Material ledger is mandatory in S/4HANA. Code that reads MBEW-LBKUM/SALK3 gets values from the view; writing them is not supported.
Material valuation / material ledger simplification
VBUK
SD document header status
Status fields moved into the header tables VBAK, LIKP and VBRK
None to rely on; read the header table
Replace SELECT FROM VBUK with the status fields of the matching header table. A join VBAK-VBUK must become a single VBAK read.
SD data model, SAP Note 2198647
VBUP
SD document item status
Status fields moved into the item tables VBAP and LIPS
None to rely on; read the item table
Replace VBUP reads with the status fields of VBAP or LIPS. Check every Z report filtering on GBSTA, LFSTA, FKSTA.
SAP Note 2198647
KONV
Pricing conditions of SD documents (transaction data)
PRCD_ELEMENTS
V_KONV (read view)
KONV is no longer filled. Change SELECT FROM KONV to PRCD_ELEMENTS or the view; in ECC KONV was stored in table cluster KOCLU, PRCD_ELEMENTS is a transparent table.
Pricing data model, SAP Note 2220005
VAKPA, VAPMA
SD index: sales documents by partner / by material
Not used; HANA reads VBAK/VBAP/VBPA directly
None
Z code that reads these indexes returns nothing. Replace with joins on VBAK, VBAP and VBPA.
SD data model, elimination of document index tables, SAP Note 2198647
VLKPA, VLPMA
SD index: deliveries by partner / by material
Not used; read LIKP/LIPS/VBPA
None
Replace with delivery table joins.
Elimination of document index tables
VRKPA, VRPMA
SD index: billing documents by partner / by material
Not used; read VBRK/VBRP/VBPA
None
Replace with billing table joins.
Elimination of document index tables
VBOX
Rebate index for SD rebate processing
Settlement Management with condition contracts
None
Classic SD rebate (VBO1, VBOF) is replaced; Z rebate reports must be redesigned on condition contracts.
SAP Note 2200691
S066, S067
LIS info structures for SD credit (open orders, open deliveries)
SAP Credit Management (FIN-FSCM-CR) credit exposure
None
Credit exposure reports on S066/S067 must move to Credit Management.
Credit Management simplification, SAP Note 2270544
KNKK, KNKA
Customer credit limit per control area / central
UKMBP_CMS_SGM (credit segment data) and UKMBP_CMS (BP credit profile)
None
FI-AR credit management (FD32) is replaced by BP-based credit management (UKM_BP). Credit checks and Z exits need redesign.
SAP Note 2270544
KNA1, LFA1 (maintenance)
Customer and vendor master
Tables stay; maintenance only through Business Partner (BUT000) with CVI links CVI_CUST_LINK and CVI_VEND_LINK
Not needed, tables still exist
Reads keep working. XD01/XK01-style BDC and direct table updates must move to BP (transaction BP, BP APIs).
Business Partner approach
MATNR (all tables)
Material number field, 18 characters
Field length extended to 40 characters
n/a
Fixed-length structures, file layouts, concatenations and offset access (lv_matnr+0(18)) break. Run the field length extension checks in ATC.
Material number field length extension
LQUA, LAGP, LTAK, LTAP
Warehouse Management quants, storage bins, transfer orders
Tables still exist; LE-WM is in the compatibility scope, EWM is the strategic successor
n/a
Code keeps working while WM is used under compatibility scope rights; plan the move to embedded or decentralised EWM.
Compatibility scope (LE-WM)
MDVM, DBVM
MRP planning file entries
PPH_DBVM
None
Z code that creates or reads planning file entries in MDVM/DBVM must use PPH_DBVM. MRP Live (MD01N) reads the new planning file.
MRP simplification

Scope: MM inventory, SD, credit, rebates and the PP planning file. Finance tables (BSEG, BSIS, COEP, FAGLFLEXT and others) are in the companion FI-CO reference. Check every mapping against the Simplification List for your target release and run the ATC S/4HANA readiness checks on your own code.

Get your Z code checked against this list

Send us an ATC or SCI result export and we map each finding to the table changes above with a suggested fix.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search the table name your custom code reads or writes, for example MSEG, VBUK or KONV. The row tells you whether the table still exists physically, whether a redirect view serves old SELECT statements, and what has to change. Export to Excel and add a column for each Z object found by a where-used list or the ATC check run, so the conversion team has one remediation list.

  • Reads usually survive through compatibility views; writes usually do not.
  • Tables marked None return no data in S/4HANA: the code compiles but gives empty results.
  • Export the list and match it against the custom code worklist from the Custom Code Migration app or ATC.

Where this lives in the system

In S/4HANA, open SE11 on MARD or MSEG and you will see a proxy object (the NSDM_V_* view). Any Open SQL SELECT on the table name is redirected to that view, which aggregates MATDOC. MATDOC is the single material document table: one line per item with the header fields repeated, which is why MKPF and MSEG no longer exist as separate stores. In SD, the status fields from VBUK and VBUP are now columns in VBAK, LIKP, VBRK, VBAP and LIPS, and pricing results moved from KONV to PRCD_ELEMENTS.

Worked example: a stock report

A Z report joins MARD and MCHB with SELECT * to show unrestricted and quality stock per batch. After conversion it still runs, because both names are redirected to calculated views, but every row now triggers an aggregation over MATDOC. With SELECT * the view computes every stock column, so the report can become slower than on ECC. The fix is to select only LABST and INSME, or to move to the released stock CDS views. A second Z report that UPDATEs MARD-LABST directly must be removed: stock changes only through goods movements.

Version differences and gotchas

The data model changes in this list apply from the first S/4HANA release (1511) onward, so the exact release mostly matters for compatibility scope items such as LE-WM. Watch for field length changes: MATNR is 40 characters and amount fields were extended, so offset access, fixed-length interface files and structures that mirror old lengths break silently. SELECT * into a structure typed on an ECC copy of a table is a common failure. Treat note numbers here as starting points and read the current version of each note in the support portal.

Frequently Asked Questions

What replaced MSEG and MKPF in S/4HANA?

Both are replaced by MATDOC, a single table that holds header and item data of every material document. SELECT statements on MSEG and MKPF are redirected to the compatibility views NSDM_V_MSEG and NSDM_V_MKPF, so old reads keep working. Writes are not supported, and performance-critical reports should read MATDOC or released CDS views directly. The change is described in SAP Note 2206980.

Do VBUK and VBUP still exist in S/4HANA?

No. The status fields were moved into the document tables: header status into VBAK, LIKP and VBRK, item status into VBAP and LIPS. Code that selects from VBUK or VBUP must be rewritten to read the status fields from those tables. This is part of the SD data model simplification in SAP Note 2198647.

Where are SD pricing conditions stored in S/4HANA?

In PRCD_ELEMENTS. KONV is no longer filled for new documents. Replace SELECT FROM KONV with PRCD_ELEMENTS (same key idea: KNUMV plus condition counter) or the read view V_KONV. Because PRCD_ELEMENTS is a transparent table, joins that were impossible on KONV in ECC are now possible.

Are SAP PP tables changed in S/4HANA?

Most PP order tables such as AFKO, AFPO, AFVC and RESB keep their structure. The notable table change is the MRP planning file: MDVM and DBVM are replaced by PPH_DBVM, used by MRP Live. Material numbers of 40 characters and stock read from MATDOC also affect PP custom code. Check the production order join generator for current table relationships.

If you want your team to ask questions about MATDOC stock, SD status or pricing in plain English on your own S/4HANA or ECC system, we can set that up on your servers.

Get SAP ECC 6.0 alerts

Support and maintenance deadlines, release changes that affect SAP ECC 6.0 sites, and new free SAP ECC 6.0 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP ECC 6.0: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP ECC 6.0? Start with the SAP ECC 6.0 guide and toolkit, or plan with SAP ECC to S/4HANA Conversion Planner, Training Path Builder, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations

Software