SAP BW on HANA architecture consulting: layers, push-down and roadmap

SAP BW on HANA architecture consulting reshapes a BW system so it uses HANA well: fewer persistent layers under LSA++, advanced DataStore objects and CompositeProviders instead of InfoCubes and MultiProviders, transformations pushed down to the database, and mixed models that combine BW and HANA native views. It usually also sets the roadmap toward BW/4HANA or SAP Datasphere.

When this makes sense

  • You migrated BW to HANA but kept the old layered architecture and see little benefit
  • Load windows are long because transformations run ABAP row by row instead of in HANA
  • You are planning BW/4HANA and need to know which objects and flows must change
  • Your BW has grown for years with duplicated flows and nobody owns the architecture
  • You need to define what a BW HANA consultant on your team should do and how to staff it

What the engagement covers

Architecture assessment

Review data flows, layers, object types, process chains, data volumes and query usage, using BW statistics and metadata tables to find unused or duplicated objects.

LSA++ target design

Define a leaner layering: an open operational data store layer, a core enterprise data warehouse layer with ADSOs, and virtual reporting through CompositeProviders, reducing persistent copies.

HANA push-down

Identify ABAP start, end and expert routines that block HANA execution, and rewrite them as AMDP SQLScript routines or standard rules where possible.

Mixed modeling

Combine BW objects with HANA calculation views through Open ODS views and CompositeProviders, and expose BW data as external HANA views for SQL consumers.

Source integration

Review ODP connections to S/4HANA and ECC, SAP Data Services or Smart Data Integration for non-SAP sources, and delta reliability.

Data tiering

Plan hot, warm and cold data using HANA extension nodes, near-line storage or archiving, to control memory size.

Roadmap

Assess readiness for BW/4HANA (legacy object conversion, BEx dependencies) or SAP Datasphere with BW bridge, and sequence the work.

How it runs

  1. 1

    Assessment (3-6 weeks)

    • Collect metadata, statistics and volumes
    • Map data flows and layers
    • Find unused and duplicate objects
    • Identify routines blocking push-down
  2. 2

    Target architecture (2-4 weeks)

    • Design LSA++ layers and object standards
    • Define mixed modeling rules
    • Plan data tiering
    • Agree roadmap and priorities
  3. 3

    Pilot and standards (4-8 weeks)

    • Rebuild one domain to the target design
    • Measure load and query improvements
    • Publish modeling and naming standards
    • Train the BW team

What you get

  • Current-state architecture map with flow inventory
  • Unused and duplicate object list with retirement plan
  • LSA++ target architecture and modeling standards
  • Push-down candidate list with expected impact
  • Data tiering plan with memory effect
  • BW/4HANA or Datasphere roadmap
  • Pilot domain results

What drives cost and effort

Number of flows and objectsLarger BW systems take longer to assess and redesign.
Volume of ABAP routinesMany custom routines need review and rewrite for push-down.
BEx and BusinessObjects dependenciesQuery and report dependencies constrain changes to providers and add testing.
Source system varietyNon-SAP sources and older extraction methods add integration work.
Roadmap ambitionPlanning a BW/4HANA conversion or Datasphere move adds analysis on top of the architecture review.

Fixed-scope architecture assessment

Teams that want a clear current state, target design and roadmap before investing.

Architect on retainer

BW teams that need an experienced architect to review designs and enforce standards over time.

Assessment plus pilot

Organizations that want proof on one domain before committing to a wider redesign.

Questions to ask any SAP S/4HANA consultant

How do you measure which BW objects and queries are actually used?

Usage data from BW statistics drives retirement and redesign. Guesswork leads to rebuilding unused content.

How do you decide between BW modeling and HANA native modeling for each use case?

Mixed modeling helps when used deliberately. A clear rule set avoids two parallel warehouses.

What push-down improvements have you measured in similar systems?

Ask for realistic ranges and the method, not promises of a fixed percentage.

How would you sequence a BW/4HANA or Datasphere move?

Architecture work should reduce later conversion effort, not create rework.

What roles should our internal BW team cover afterward?

Good consulting leaves standards and skills behind, not dependency.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Redesign breaks downstream reports

Map query and report dependencies before changing providers, and test with report owners.

Push-down rewrites change results

Compare outputs of old and new routines on the same data before switching.

Architecture standards ignored after the project

Add design reviews to the change process and train the team on the standards.

HANA memory growth continues

Implement data tiering and retire unused objects as part of the plan.

If your BW on HANA meets load windows and users trust the reports, a full redesign may not pay off; targeted push-down of the slowest flows can be enough. If your future is SAP Datasphere or a non-SAP warehouse, invest in architecture only where it eases the move. An experienced internal BW architect can often run the assessment with SAP's own tools and statistics.

Frequently asked questions

What is the architecture of SAP BW on HANA?

BW on HANA runs the BW application server on a HANA database, so data storage and much processing move into HANA's in-memory columnar engine. Modern designs use ADSOs, CompositeProviders and Open ODS views, with fewer persistent layers than classic BW.

What is LSA++?

LSA++ is SAP's evolution of the Layered Scalable Architecture for BW on HANA. It reduces persistent layers and favors virtual reporting layers, because HANA can calculate on the fly what classic BW had to store.

What does a BW HANA consultant do?

They design data models and flows, build transformations including AMDP routines, configure extraction from S/4HANA and other sources, set up process chains, build queries and support reporting tools. Senior consultants also own architecture standards and performance.

Do expert routines work on HANA?

ABAP expert routines run on the application server and prevent HANA push-down for that transformation. AMDP-based routines in SQLScript allow push-down, so rewriting critical expert routines can shorten loads.

Can AI help with a BW architecture review?

AI can read transformation and routine code, build lineage maps and flag push-down candidates quickly. Netray uses AI agents for that analysis, with BW architects deciding the target design.

Talk to a SAP S/4HANA consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get SAP S/4HANA alerts

Support and maintenance deadlines, release changes that affect SAP S/4HANA sites, and new free SAP S/4HANA tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.