SAP BW on SAP HANA: implementation and migration consulting
Moving SAP BW onto SAP HANA is usually a database migration of BW 7.5 with SUM and the Database Migration Option (DMO), followed by post-migration tasks and a cleanup of classic objects. The harder decisions sit around it: how much history to keep in memory, what happens to extractors when the ERP source becomes S/4HANA, and whether BW on HANA is the destination or only a stop on the way to BW/4HANA, Datasphere or Business Data Cloud.
When this makes sense
- Your BW 7.x still runs on Oracle, Db2, SQL Server or SAP ASE and the database or hardware contract is up for renewal
- Process chains overrun the nightly window and query response times have become a standing complaint from finance
- Your SAP ECC is moving to S/4HANA and nobody has mapped which BW DataSources and deltas will break
- You need a plan for BW 7.5 mainstream maintenance ending at the close of 2027 and want to know whether BW on HANA, BW/4HANA or Datasphere makes sense
- A previous BW on HANA migration landed but kept every classic InfoCube and ABAP routine, so the HANA box is large and not much faster
- Your BW team has shrunk to one or two people and the migration has to be done without stopping month-end reporting
What the engagement covers
Readiness check and release path
Confirm the BW release, support package level and Unicode status, run the BW migration checklist and the pre-check reports, and decide whether to update to BW 7.5 in the same DMO run. Note which add-ons (BPC, IP planning, near-line storage) need their own compatibility checks.
HANA sizing
Run the BW sizing report /SDF/HANA_BW_SIZING to estimate memory with and without cleanup, separating hot data from warm data candidates. Sizing drives the hardware or hyperscaler instance cost, so it should be redone after housekeeping, not once at the start.
Housekeeping before migration
Delete old PSA requests and change log entries, compress InfoCubes, drop unused aggregates and BW Accelerator indexes, and archive or move cold history to near-line storage. Every gigabyte removed here is memory you do not pay for and data DMO does not copy.
Database migration with SUM DMO
Plan the DMO run in a sandbox copy of production, tune table splitting and R3load processes, measure the downtime, then repeat in QA and production. Include the post-migration report RS_BW_POST_MIGRATION and the follow-up tasks for BW objects on the new database.
HANA optimization of the data model
Convert InfoCubes to HANA-optimized InfoCubes or, better, to advanced DSOs, replace MultiProviders with CompositeProviders, and rewrite heavy ABAP start and end routines as AMDP scripts so transformations push down into HANA.
Source system impact from S/4HANA
When the ERP source moves to S/4HANA, some ECC extractors are not available or behave differently, and deltas must be re-initialized after conversion. Map each DataSource to its S/4HANA status, plan ODP and CDS-based extraction where needed, and schedule delta init around the ERP cutover.
Front-end and authorization review
Check which BEx queries and workbooks are still used, move workbooks to SAP Analysis for Microsoft Office or SAP Analytics Cloud where it makes sense, and confirm analysis authorizations behave the same after migration.
Next-step decision
Document whether BW on HANA is the end state or a step toward BW/4HANA (Starter Add-on, transfer toolbox, in-place, remote or shell conversion), the private cloud edition under SAP Business Data Cloud, or a gradual move to SAP Datasphere.
How it runs
- 1
Assessment and sizing (2-4 weeks)
- Inventory process chains, providers, queries and ABAP routines, and flag unused objects from statistics
- Run sizing with and without cleanup scenarios
- Check source system plans, especially any S/4HANA conversion date
- Agree the target: BW on HANA, BW/4HANA or a hybrid with Datasphere
- 2
Housekeeping and sandbox DMO (3-6 weeks)
- Clean PSA, change logs and unused aggregates in production
- Run DMO on a production copy and record downtime per phase
- Execute post-migration tasks and fix failed objects
- Rerun sizing on the cleaned system
- 3
Model optimization (4-10 weeks)
- Convert priority InfoCubes and DSOs to advanced DSOs
- Rewrite the slowest ABAP routines as AMDP
- Rebuild CompositeProviders and adjust queries
- Regression test key reports against the old system figures
- 4
QA and production migration (3-6 weeks)
- Rehearse the cutover in QA with timed runbook
- Freeze transports and agree the reporting blackout with finance
- Run production DMO, post-migration checks and process chain restart
- Reconcile month-end and year-to-date totals before releasing users
- 5
Stabilization (2-4 weeks)
- Watch process chain runtimes and HANA memory peaks
- Tune the worst queries with RSRT and HANA plan analysis
- Hand over runbooks and monitoring to the support team
What you get
- Object inventory with usage statistics and a keep, convert or retire decision per provider and query
- HANA sizing report before and after housekeeping, with the hardware or cloud instance recommendation
- DMO runbook with measured downtime from sandbox and QA rehearsals
- List of converted objects and rewritten routines, with test evidence against pre-migration figures
- DataSource impact map for the S/4HANA source system, including delta re-initialization plan
- Front-end migration list covering BEx workbooks, web templates and third-party BI connections
- Target architecture note covering BW/4HANA, Datasphere or Business Data Cloud options and dates
What drives cost and effort
| Data volume and history kept hot | HANA is licensed and sized by memory, so keeping ten years of line items in active tables raises both migration runtime and ongoing cost; near-line storage or data tiering reduces it. |
| Number of classic objects | Each InfoCube, classic DSO, 3.x data flow and BEx web template that must be converted or replaced adds design and test effort; systems with hundreds of providers take far longer than focused finance warehouses. |
| ABAP routines and customer exits | Routines that loop row by row run but do not benefit from HANA; rewriting them as AMDP is where much of the performance gain and much of the effort lives. |
| Downtime tolerance | A short weekend window forces more DMO rehearsals, table splitting and possibly downtime-optimized options, while a longer reporting blackout keeps effort down. |
| Parallel S/4HANA conversion | Migrating BW while the ERP source changes means extra DataSource remapping, delta re-inits and double reconciliation, but doing them together can avoid testing BW twice. |
| Front-end landscape | Heavy use of BEx Analyzer workbooks or BusinessObjects universes on BW adds conversion and user retraining; Analysis for Office users are usually easier. |
Fixed-scope technical migration
Teams that want a clean DMO move of an already tidy BW 7.5 system with a clear object list and an agreed downtime window.
Time and materials with a cap
Older BW systems where the inventory may reveal many unused or broken flows and the optimization scope will only be clear after the sandbox run.
Migration plus ongoing BW support retainer
Companies with a small internal BW team that need process chain monitoring, query tuning and the later BW/4HANA or Datasphere step handled by the same people.
Questions to ask any SAP S/4HANA consultant
How many BW on HANA DMO migrations have your proposed people run themselves, and on which source databases?
DMO behavior, table splitting and downtime tuning differ between Oracle, Db2 and SQL Server sources; generic HANA experience is not the same as BW migration experience.
Will you size HANA before and after housekeeping, and who owns the cleanup?
Partners that size once on the raw system can lock you into more memory than you need for years.
What is your approach to InfoCubes and classic DSOs: convert to HANA-optimized objects, move to advanced DSOs, or leave as is?
Leaving everything classic gets you onto HANA quickly but keeps the work for a future BW/4HANA conversion; the answer shows whether they are planning one step or two.
How will you handle DataSources affected by our S/4HANA conversion?
Missing extractors and broken deltas after an ERP conversion are a common reason reporting fails at go-live, and they sit between the BW and S/4HANA teams.
How do you prove the numbers match after migration?
Ask for a reconciliation method on named reports and key figures, not just technical checks that tables were copied.
What would you recommend if we asked whether to skip BW on HANA and go straight to BW/4HANA or Datasphere?
A neutral advisor will explain the trade-off against your release, objects and dates instead of selling the project already on the table.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Downtime overruns the agreed window
Run DMO at least twice on full-size copies, record each phase, and set a go or no-go checkpoint with a tested fallback to the old database.
Oversized HANA because cleanup was skipped
Make housekeeping a gated phase with a measured memory target before production sizing is signed off.
Reports run but figures drift
Reconcile a fixed set of finance and logistics reports at period level against the old system before releasing users.
Broken deltas after the ERP moves to S/4HANA
Keep a DataSource impact map, freeze delta loads at ERP cutover, and plan re-initialization with clear ownership between teams.
No performance gain because logic stayed in ABAP
Profile the slowest process chains and queries first and rewrite those routines as AMDP before go-live, not as a someday item.
If your BW is small, already on BW 7.5 and run by an experienced Basis and BW team, the DMO move itself is well documented by SAP and many internal teams handle it with SAP notes and a sandbox rehearsal. A consultant earns their fee on the cleanup, the model optimization and the S/4HANA source impact, not on running SUM. And if most reporting has already moved to another warehouse, retiring BW instead of migrating it may be the better route.
Frequently asked questions
What is the difference between a BW on HANA migration and a BW/4HANA conversion?
A BW on HANA migration moves SAP BW 7.x to the HANA database and keeps the product and its classic objects. A BW/4HANA conversion changes the product: classic InfoCubes, classic DSOs, MultiProviders and 3.x flows must be replaced, using the Starter Add-on and transfer toolbox. Many companies do the first, then the second later.
Which tool performs the database migration?
SAP's Software Update Manager with the Database Migration Option (DMO) is the standard route, because it can update the BW release and migrate the database in one run. Classic export and import with heterogeneous system copy is an alternative in some cases.
How long does a BW on HANA migration take?
A tidy system with a clear target can move in a few months including rehearsals. Large warehouses with many classic objects, heavy ABAP routines or a parallel S/4HANA conversion often take six months to a year once optimization and testing are included.
Do I need to convert InfoCubes to move to HANA?
No. Classic InfoCubes run on HANA, and they can be converted to HANA-optimized InfoCubes. For a future BW/4HANA move it is more efficient to replace them with advanced DSOs, so decide the target before spending effort.
What happens to BW extraction when ECC becomes S/4HANA?
Some ECC extractors are not supported or change behavior in S/4HANA, and deltas must be re-initialized after conversion. SAP publishes notes listing extractor status, and CDS-based extraction through ODP is the usual replacement.
Is BW on HANA still worth doing with BW 7.5 maintenance ending in 2027?
It can be, as a step to BW/4HANA, which SAP has said it will maintain to 2040, or as a base for the private cloud edition under Business Data Cloud. As an end state on its own it buys limited time, so plan the next move as part of the business case.