SAP BW upgrade to 7.5: dependencies to clear and the tools you need

Upgrading SAP BW to 7.5 is a NetWeaver release upgrade run with Maintenance Planner and the Software Update Manager, plus BW-specific pre and post steps. The dependencies that cause trouble are rarely the SUM run itself: Unicode, the Java stack used by BEx Web, old 3.x data flows, add-ons, front-end versions and the database or OS level. BW 7.5 on HANA is also the starting point for an in-place conversion to BW/4HANA, which is often the real reason for the upgrade.

When this makes sense

  • You run BW 7.0, 7.3 or 7.4 and need 7.5 for support, HANA or a later BW/4HANA conversion
  • You plan a BW/4HANA in-place conversion and must first reach BW 7.5 on HANA at the required SP level
  • Your BW still uses BEx Web applications on a Java stack and you need to know what happens to them
  • Your system still contains 3.x data flows, update rules or transfer rules
  • Your previous BW upgrade broke process chains or queries after go-live

What the engagement covers

Dependency check

Source release and SP level, Unicode status, database and OS versions in the Product Availability Matrix, add-ons such as BPC or IP, and connected source systems and plug-ins.

Java and BEx Web

Whether BEx Web Java and portal integration are in use, dual-stack splitting where needed, and plans for replacing BEx web templates.

3.x object migration

Migrating 3.x DataSources, transfer rules and update rules to 7.x data flows with transformations and DTPs before or after the upgrade.

Upgrade tooling

Maintenance Planner for the stack XML, SUM (optionally with DMO to move to HANA), SPDD and SPAU, and the BW task lists in STC01 for before and after upgrade checks.

BW-specific steps

Emptying delta queues and setup tables in sources where required, stopping process chains, reactivating objects after upgrade and checking RSRV results.

Front ends

SAP GUI and BEx Analyzer or Analysis for Office versions supported for the target, and BI platform connection checks.

Regression testing

Load and delta tests per source, key query results compared before and after, and authorization checks.

How it runs

  1. 1

    Assessment (2-3 weeks)

    • Run dependency checks and PAM review
    • Inventory 3.x objects, BEx Web and add-ons
    • Decide on combined DMO to HANA
  2. 2

    Sandbox upgrade (2-4 weeks)

    • Upgrade a copy of production with SUM
    • Run STC01 task lists before and after
    • Record runtime and object issues
  3. 3

    Remediation (2-8 weeks)

    • Migrate 3.x flows
    • Plan BEx Web replacement
    • Fix SPDD and SPAU and reactivation errors
  4. 4

    Development and quality (3-6 weeks)

    • Upgrade development and quality
    • Regression test loads and queries
    • Verify source system connections
  5. 5

    Production and hypercare (1-3 weeks)

    • Upgrade production in the agreed window
    • Restart chains and deltas carefully
    • Monitor first loads and month-end

What you get

  • Dependency matrix: release, Unicode, DB, OS, add-ons, front ends
  • Inventory of 3.x objects and BEx Web applications with migration decisions
  • SUM runbook with sandbox runtimes
  • Delta and process chain stop and restart procedure
  • Before and after query result comparison
  • Readiness note for a later BW/4HANA conversion

What drives cost and effort

Starting releaseBW 7.0 to 7.5 is a bigger jump than 7.4 to 7.5, with more adjustments and object reactivation.
Non-Unicode systemA Unicode conversion is a separate, data-heavy step that can dominate the project.
3.x flows and BEx WebMany old flows or web templates add migration and redesign work.
Database moveCombining the upgrade with DMO to HANA saves a downtime but extends run time and testing.
Add-onsBPC, IP or third-party add-ons must have compatible versions or block the upgrade.
Source systemsMore connected sources mean more delta stop and restart work and more regression tests.

Fixed-scope technical upgrade

Systems already on Unicode with few 3.x objects and a clear target stack.

Upgrade plus remediation

Older systems with 3.x flows, BEx Web or add-ons that need rework.

Upgrade as phase one of BW/4HANA

Customers using 7.5 on HANA as the stepping stone to an in-place conversion.

Questions to ask any SAP consultant

Is 7.5 our end state or a step to BW/4HANA?

The answer changes what you remediate now, for example whether to convert old objects to HANA-optimised ones during the upgrade.

How will you handle our delta queues and source systems during downtime?

Lost or duplicated deltas are the most common BW upgrade problem.

What do you propose for our BEx Web applications?

Web templates often need a replacement plan, not just a technical upgrade.

Will you migrate 3.x flows before the upgrade or after?

Doing it before simplifies the upgrade; doing it after can shorten the critical path. Either needs a clear plan.

How will you prove queries return the same results after the upgrade?

Before and after comparisons on key queries give users confidence at go-live.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Lost or duplicated delta records

Drain delta queues, stop chains and document restart order per source before downtime.

Inactive objects after upgrade

Run the STC01 after-upgrade task list and reactivate in a planned sequence, checking RSRV.

Broken BEx Web or portal reports

Inventory usage early and decide on replacement before the production upgrade.

Unsupported add-on versions

Confirm add-on compatibility in Maintenance Planner during assessment.

If you are already on BW 7.4 on HANA with no 3.x objects and no Java, the move to 7.5 is a routine SUM project your Basis team can likely run. Bring in outside help for older or non-Unicode systems, BEx Web dependencies or when the upgrade is the first step of a BW/4HANA conversion. Also consider whether a remote conversion or a fresh BW/4HANA or Datasphere build is cheaper than upgrading an old system first.

Frequently asked questions

What tools are used to upgrade SAP BW?

Maintenance Planner to build the stack XML, the Software Update Manager to run the upgrade (with DMO if moving to HANA), SPDD and SPAU for modifications, and the BW before and after upgrade task lists in STC01. RSRV checks and BW monitors confirm health afterwards.

Can we upgrade SAP BW 7.0 directly to 7.5?

SUM supports direct upgrades from many older releases if the start SP level and Unicode prerequisites are met. Check the SUM guide and SAP notes for your exact source release, because some combinations require an intermediate step.

Does BW 7.5 still support BEx Web Java?

BEx Web Java needs a Java stack and BW 7.5 runs ABAP and Java as separate stacks, so dual-stack systems must be split. Many customers use the upgrade to move web reporting to Analysis for Office, SAP Analytics Cloud or another front end.

Is BW 7.5 required for BW/4HANA?

For an in-place conversion, yes: the system must be on BW 7.5 on HANA at the SP level the conversion guide requires. Remote and shell conversions start from a fresh BW/4HANA system and have different prerequisites.

What about upgrading BW 7.0 to 7.3?

Upgrading to 7.3 today rarely makes sense because 7.5 is the supported target and the base for BW/4HANA. If you are on 7.0, plan straight for 7.5 or a new BW/4HANA or Datasphere platform.

Talk to a SAP consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.