SAP SUM 2.0 Roadmap Phases Reference

This reference walks through the SUM 2.0 roadmap from Extraction to Postprocessing, with the phases that matter most for Basis teams, where downtime starts and where to read the logs. It covers ABAP upgrades, S/4HANA conversions and Database Migration Option runs.

Download:
Roadmap stepPhase or sub-stepUptime or downtimeWhat happensTypical issueWhere to look
Before start
Start SUM UI
Uptime
Unpack SUM, register it with SAP Host Agent, open https://<host>:1129/lmsl/sumabap/<SID>/doc/sluigui
Host Agent too old or wrong user; port 1129 blocked
SAP Host Agent logs, SUM/abap/log
Extraction
Stack file and archives
Uptime
Reads stack.xml from Maintenance Planner, checks and extracts the archives into the download directory
Missing or wrong archives for the target stack
SUM/abap/log
Extraction
Tool and key checks
Uptime
Asks for passwords, checks kernel, SPAM/SAINT and SUM requirements, SAP Note implementation prompts
Required SAP Notes not implemented
SUM/abap/log
Configuration
Parameters
Uptime
Choose scenario options, number of R3trans, R3load and background processes, shadow instance number and ports
Too many processes for the host, port conflicts with the shadow instance
SUM/abap/log
Configuration
Add-ons and transports
Uptime
Decide add-on handling and include customer transports or SPDD/SPAU adjustment transports from a previous run
Add-on without a target version blocks the run
SUM/abap/log
Checks
Prerequisite checks
Uptime
Free space, database version, open updates, open transports and other prerequisites
Tablespace or disk space too small
SUM/abap/log
Preprocessing
Shadow instance
Uptime
Creates the shadow instance and imports the new repository into shadow tables (EU_IMPORT phases)
Long runtime on large repositories, shadow cannot start
SUM/abap/log, SUM/abap/tmp
Preprocessing
Development lock
Uptime
Development environment is locked; no more transports or repository changes
Developers lose work if not told in time
SUM/abap/log
Preprocessing
SPDD adjustment (before ACT_UPG)
Uptime
Adjust modified DDIC objects with SPDD in the shadow instance
Skipped SPDD lets SAP standard overwrite modified tables or fields
SPDD in shadow instance
Preprocessing
ACT_UPG
Uptime
Activates the new dictionary objects in the shadow
Activation errors for customer DDIC objects
SUM/abap/log (activation logs)
Preprocessing
DMO uptime migration (DMO only)
Uptime
With downtime-optimized options, part of the table migration runs in uptime
Changes during uptime must be replayed later
SUM/abap/log, migration logs
Preprocessing
DOWNCONF_DTTRANS
Uptime, end of
Asks you to confirm entering downtime
Users and jobs still active; lock users and suspend jobs first
SUM UI dialog
Execution
Switch
Downtime
Shadow repository is switched into the system, kernel switch (KX_SWITCH)
Kernel or profile problems after the switch
SUM/abap/log
Execution
DMO migration (DMO only)
Downtime
R3load export and import of tables to the target database, e.g. SAP HANA
Runtime longer than benchmarked; table splitting tuning
SUM/abap/log, migration logs in SUM/abap/migrate_*
Execution
PARCONV_UPG
Downtime
Table conversions and structure changes in parallel
Conversion errors on large or modified tables
SUM/abap/log (PARCONV logs)
Execution
TABIM_UPG
Downtime
Imports remaining table contents
Import errors from customer table content
SUM/abap/log
Execution
XPRAS_AIMMRG
Downtime
Runs XPRAs and after-import methods
XPRA errors that need SAP Notes; long runtimes on application data
SUM/abap/log (XPRA logs)
Postprocessing
SPAU and SPAU_ENH
After downtime (system can be released per guide)
Adjust modified repository objects and enhancements
Large SPAU backlog; Note corrections to reset or reapply
SPAU, SPAU_ENH
Postprocessing
SGEN and cleanup
Uptime
Load generation with SGEN, removal of shadow and temporary objects
Slow first use if SGEN is skipped
SGEN job logs
Postprocessing
Evaluation
Uptime
Runtime analysis UPGANA.XML, feedback form, SUM Utilities
Not saving the analysis for the next system run
SUM/abap/doc/analysis

Phase names follow SUM 2.0 for ABAP. Exact phase lists change with each SUM 2.0 SP: always read the SUM guide and the central SAP Note for your SUM SP. With near-Zero Downtime Maintenance (nZDM) or downtime-optimized DMO, more work moves into uptime.

Get your downtime estimate reviewed

Send us the UPGANA.XML from your sandbox run and we will point out the phases to tune before production.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Read the table top to bottom as a runbook outline, or search for a phase name you see in the SUM UI or a log, such as ACT_UPG or PARCONV_UPG. The uptime or downtime column tells you whether users can still work. Downtime begins after you confirm it at the end of Preprocessing (DOWNCONF_DTTRANS), so lock users, suspend background jobs and stop interfaces just before that. The typical issue column lists what usually stops a run at that point, so you can prepare for it in the sandbox.

The six roadmap steps

SUM 2.0 runs six steps. Extraction reads the stack.xml from Maintenance Planner and extracts archives. Configuration sets process counts, the shadow instance and options such as nZDM or downtime-optimized DMO. Checks verifies space, versions and prerequisites. Preprocessing builds the shadow instance, imports the new repository, locks development, asks for SPDD and activates DDIC in ACT_UPG, all in uptime. Execution is the downtime: the switch, kernel switch, DMO migration if used, table conversion, imports and XPRAs. Postprocessing covers SPAU, SGEN, cleanup and evaluation.

  • SPDD happens in Preprocessing, in the shadow instance.
  • SPAU happens in Postprocessing, after the switch.
  • DMO adds the R3load migration in Execution.

Worked example: planning the weekend

On the sandbox run, save UPGANA.XML from SUM/abap/doc/analysis. It shows the runtime of every phase. Use the downtime phases (switch, migration, PARCONV_UPG, TABIM_UPG, XPRAS_AIMMRG) to estimate the production window, adding time for SPAU, tests and a rollback point. For DMO, run the benchmarking tool first to tune R3load process counts and table splitting. Feed the SPDD and SPAU transports from development into later runs through the Configuration step so you do not adjust the same objects again in QA and production.

Common mistakes

Teams skip SPDD and lose modified table fields, or tell developers about the development lock too late. Shadow instance ports clash with other instances on the host. Too many R3load or background processes overload the database host and make downtime longer, not shorter. People read only the SUM UI message and not the detailed log in SUM/abap/log, where the real error is. And they do not keep UPGANA.XML from the previous run, so the production plan rests on guesses.

Frequently Asked Questions

What are the SUM upgrade steps in SAP Basis?

SUM 2.0 runs six roadmap steps: Extraction, Configuration, Checks, Preprocessing, Execution and Postprocessing. Preprocessing builds the shadow instance and runs in uptime; Execution is the downtime with the switch, conversions and XPRAs; Postprocessing covers SPAU, SGEN and evaluation.

When does downtime start in SUM?

At the end of Preprocessing SUM asks you to confirm the start of downtime (phase DOWNCONF_DTTRANS). Before confirming, lock users, suspend background jobs and stop interfaces. With nZDM or downtime-optimized DMO, more work happens in uptime and the downtime part is shorter.

When do I do SPDD and SPAU?

SPDD comes in Preprocessing, in the shadow instance before ACT_UPG activates the dictionary. SPAU and SPAU_ENH come in Postprocessing, after the switch. Collect both in transports and feed them into later runs so the next systems pick them up automatically.

Where are the SUM logs?

Most logs are in SUM/abap/log, with temporary and working files in SUM/abap/tmp. The runtime analysis UPGANA.XML is in SUM/abap/doc/analysis. Read the detailed log named in the SUM UI error message, not just the summary.

If you want your Basis team to search SUM logs and runbooks in plain English on your own servers, Netray can set up a private AI assistant for that.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP