On-prem models / Tencent Hunyuan

Run Hy3 on-prem

Tencent's 295B MoE (21B active) text model released after the Hy3 Preview, with scaled-up RL focused on tool-call stability and multi-turn context tracking. Offers no_think, low and high reasoning effort.

295B MoE (21B active)256K contextApache-2.0textthinking modetool callingreleased 2026-07

Memory needed

PrecisionWeightsKV per request, 8KKV per request, 32KKV per request, 128K
BF16 (full precision)590 GB2.68 GB10.7 GB42.9 GB
FP8295 GB1.34 GB5.37 GB21.5 GB
INT4 (AWQ / GPTQ)165 GB1.34 GB5.37 GB21.5 GB
GGUF Q4_K_M177 GB1.34 GB5.37 GB21.5 GB

KV cache from the published config: 80 layers, 8 KV heads x 128 dims. 16-bit cache for BF16 rows, 8-bit otherwise.

Fit for ERP and manufacturing work

Its focus on reliable tool calls and format adherence suits ERP agents and structured JSON output, and Apache 2.0 is easy for legal. Needs a full 8-GPU server; use the FP8 repo.

Strengths

  • Apache 2.0
  • Card emphasises production-grade tool-call and output-format stability
  • Defaults to direct answers (no_think), good for latency
  • Official FP8 repo and fine-tuning/RL guides

Watch out for

  • About 590 GB in BF16; 8 large-memory GPUs (H20-3e class) recommended
  • Full GQA KV on 80 layers makes long context memory-heavy
  • Text only

GPUs that run it

One user, 8K context, 4-bit

20 people at once, 16K context, FP8

HardwareCountMemory usedTok/s per user
AMD Instinct MI210 64GB8361 / 460 GB59
AMD Instinct MI325X 256GB2352 / 460 GB76
Intel Gaudi 3 128GB (HL-325L OAM)4355 / 460 GB75
Apple Mac Studio M3 Ultra 512GB1351 / 460 GB7
Apple Mac Studio M5 Ultra 512GB1351 / 460 GB11
NVIDIA B300 (Blackwell Ultra) 270GB2352 / 486 GB94
NVIDIA H200 SXM 141GB4355 / 507 GB88
NVIDIA H200 NVL 141GB4355 / 507 GB88

Serving and licence

vLLM (build from source or recent release; --tool-call-parser hy_v3, MTP enabled) and SGLang (--tool-call-parser hunyuan, transformers>=5.6.0); recipes on vLLM and SGLang sites.

Apache-2.0. Apache 2.0 (per the repository LICENSE): commercial use, modification and redistribution allowed with notice.

Model card on Hugging Face

Design a Hy3 deployment

Preloaded with Hy3. Add your ERP and documents, change GPUs or users, and export the diagram.

Loading the architecture builder...

Questions

How much VRAM does Hy3 need?

The weights alone take about 590 GB in BF16, 295 GB in FP8 and 165 GB in 4-bit. On top of that each request holds a KV cache of about 1.34 GB at 8K tokens of context (FP8 cache), so 20 people generating at once need roughly 26.8 GB more, plus a few GB of runtime overhead.

What is the smallest GPU setup that runs Hy3?

For a single user at 8K context in 4-bit, 4 x NVIDIA L40S 48GB (48 GB each) fits, at an estimated 71 tokens per second. For a team, size for concurrent requests and context; the builder above does that.

Is Hy3 allowed for commercial use?

Hy3 is released under Apache-2.0. Apache 2.0 (per the repository LICENSE): commercial use, modification and redistribution allowed with notice. Check the licence text on the model card with your legal team before production use.

Which engine should serve Hy3 on-prem?

vLLM (build from source or recent release; --tool-call-parser hy_v3, MTP enabled) and SGLang (--tool-call-parser hunyuan, transformers>=5.6.0); recipes on vLLM and SGLang sites.