GPUs for on-prem AI / NVIDIA
NVIDIA RTX PRO 6000 Blackwell Workstation Edition 96GB for LLMs
96GB per card fits a 70B model at 8-bit on one GPU; no NVLink. Dense values derived by halving NVIDIA's 4,000 TOPS FP4 sparse figure and the 2 PF FP8 / 1 PF BF16 sparse figures of the same GB202 chip. Price is an indicative 2026 street range for one unit, not a quote.
workstation card | PCIe Gen5 only | CUDA | indicative price $8,000-10K
Which models fit, and how many cards
Planning estimates. 4-bit column: one user at 8K context. FP8 column: 10 users at once at 16K context.
| Model | Size | 4-bit: cards | 4-bit: tok/s | FP8, 10 users: cards | FP8: tok/s per user |
|---|---|---|---|---|---|
| Mistral Medium 3.5 128B | 128B | 1 | 15 | 2 | 13 |
| Qwen3.5-122B-A10B | 125B / 10B | 1 | 117 | 2 | 99 |
| Ling-3.0-flash | 124B / 5.1B | 1 | 197 | 2 | 164 |
| NVIDIA Nemotron 3 Super 120B-A12B | 120B / 12B | 1 | 101 | 2 | 85 |
| Mistral Small 4 119B A6B (2603) | 119B / 6.5B | 1 | 165 | 2 | 136 |
| gpt-oss-120b | 117B / 5.1B | 1 | 194 | 2 | 147 |
| Command A (03-2025) | 111B | 1 | 17 | 2 | 16 |
| Llama 4 Scout 17B-16E Instruct | 109B / 17B | 1 | 72 | 2 | 51 |
| Qwen3-Coder-Next | 79.7B / 3B | 1 | 274 | 1 | 154 |
| Llama 3.3 70B Instruct | 70B | 1 | 26 | 2 | 22 |
| Qwen3.6-35B-A3B | 36B / 3B | 1 | 275 | 1 | 159 |
| Qwen3-32B | 32.8B | 1 | 52 | 1 | 24 |
| Olmo 3.1 32B Think | 32B | 1 | 54 | 1 | 27 |
| GLM-4.7-Flash | 31.2B / 3B | 1 | 268 | 1 | 124 |
| Gemma 4 31B IT | 30.7B | 1 | 55 | 1 | 25 |
| Qwen3-30B-A3B-Instruct-2507 | 30.5B / 3.3B | 1 | 247 | 1 | 93 |
| Granite 4.2 30B | 30B | 1 | 57 | 1 | 25 |
| NVIDIA Nemotron 3.5 Lightning 30B-A3B | 30B / 3B | 1 | 278 | 1 | 180 |
| Qwen3.8-27B | 27.8B | 1 | 62 | 1 | 33 |
| Gemma 3 27B IT | 27B | 1 | 63 | 1 | 31 |
| Gemma 4 26B A4B IT | 25.2B / 3.8B | 1 | 228 | 1 | 104 |
| Mistral Small 3.2 24B Instruct 2506 | 24B | 1 | 70 | 1 | 33 |
| Magistral Small 1.2 (2509) | 24B | 1 | 70 | 1 | 33 |
| Devstral Small 2 24B Instruct 2512 | 24B | 1 | 70 | 1 | 33 |
| gpt-oss-20b | 21B / 3.6B | 1 | 246 | 1 | 138 |
| Phi-4 | 14B | 1 | 109 | 1 | 44 |
| Gemma 4 12B IT | 11.95B | 1 | 125 | 1 | 60 |
| Qwen3.5-9B | 9.7B | 1 | 151 | 1 | 85 |
| Qwen3-VL-8B-Instruct | 8.8B | 1 | 157 | 1 | 65 |
| Granite 4.2 8B | 8B | 1 | 167 | 1 | 65 |
| Llama 3.1 8B Instruct | 8B | 1 | 169 | 1 | 71 |
| Hy3 | 295B / 21B | 2 | 86 | 4 (multi-node) | 47 |
| Command A+ (05-2026) | 218B / 25B | 2 | 84 | 4 (multi-node) | 68 |
| Step-3.7-Flash | 198B / 11B | 2 | 148 | 4 (multi-node) | 96 |
| Qwen3.8-Flash-Next | 180B / 6B | 2 | 208 | 4 (multi-node) | 119 |
| MiniMax-M3 | 428B / 23B | 4 (multi-node) | 86 | 8 (multi-node) | 74 |
| Qwen3.5-397B-A17B | 403B / 17B | 4 (multi-node) | 96 | 8 (multi-node) | 86 |
| Llama 4 Maverick 17B-128E Instruct | 400B / 17B | 4 (multi-node) | 106 | 8 (multi-node) | 86 |
| Trinity Large Thinking | 398B / 13B | 4 (multi-node) | 103 | 8 (multi-node) | 84 |
| GLM-5.3-Flash | 320B / 18B | 4 (multi-node) | 108 | 4 (multi-node) | 81 |
| MiMo-V2.6-Flash-RL | 309B / 15B | 4 (multi-node) | 112 | 4 (multi-node) | 85 |
| MiMo-V2.6-Pro-RL | 1020B / 42B | 8 (multi-node) | 73 | 16 (multi-node) | 63 |
| Kimi-K2.6 | 1000B / 32B | 8 (multi-node) | 85 | 16 (multi-node) | 74 |
| Kimi-K2.7-Code | 1000B / 32B | 8 (multi-node) | 85 | 16 (multi-node) | 74 |
| Muse Spark Open 816B-A42B | 816B / 42B | 8 (multi-node) | 77 | 16 (multi-node) | 66 |
| DeepSeek-V4.1-Flash-1017 | 748B / 16B | 8 (multi-node) | 131 | 16 (multi-node) | 116 |
| GLM-5.3 | 744B / 40B | 8 (multi-node) | 69 | 16 (multi-node) | 59 |
| Mistral Large 3 675B Instruct 2512 | 675B / 41B | 8 (multi-node) | 79 | 16 (multi-node) | 68 |
| DeepSeek-V3.2 | 671B / 37B | 8 (multi-node) | 82 | 8 (multi-node) | 63 |
| DeepSeek-V4-Pro-0813 | 1600B / 49B | 16 (multi-node) | 79 | 24 (multi-node) | 67 |
| Kimi-K3 | 2800B / 104B | 24 (multi-node) | 50 | 40 (multi-node) | 45 |
| Qwen3.8-2.4T-A95B | 2446B / 95B | 24 (multi-node) | 51 | 32 (multi-node) | 47 |
Design a deployment on NVIDIA RTX PRO 6000 Blackwell Workstation Edition 96GB
Preloaded with this hardware. Add your ERP, documents and users.
Questions
What is the largest model that fits on one NVIDIA RTX PRO 6000 Blackwell Workstation Edition 96GB?
Of the models we track, Mistral Medium 3.5 128B (128B) fits on a single 96 GB card in 4-bit with one user at 8K context. More users or longer context need memory for the KV cache, so leave headroom.
How fast is NVIDIA RTX PRO 6000 Blackwell Workstation Edition 96GB for LLM inference?
Generation speed is mostly set by memory bandwidth: 1792 GB/s here. Each token reads the active weights once, so a model with 8 GB of active weights tops out near 224 tokens per second per stream before efficiency losses; batching many users raises total throughput.
Is NVIDIA RTX PRO 6000 Blackwell Workstation Edition 96GB a good choice for on-prem AI?
96GB per card fits a 70B model at 8-bit on one GPU; no NVLink. Dense values derived by halving NVIDIA's 4,000 TOPS FP4 sparse figure and the 2 PF FP8 / 1 PF BF16 sparse figures of the same GB202 chip. Price is an indicative 2026 street range for one unit, not a quote.