Multi-carrier shipping and TMSInfor M3Runs on-prem

ProcessWeaver multi-carrier shipping and Infor M3

ProcessWeaver, from Elemica, is a multi-carrier shipping product covering 460 or more carriers that automates carrier and service selection, labels, manifests and customs documents across distribution sites. Elemica describes APIs and connectors built on Infor item, order and warehouse structures for M3 and CloudSuite.

How ProcessWeaver multi-carrier shipping connects to Infor M3

APIs and connectors using Infor item, order and warehouse structures

ProcessWeaver reads shipment-relevant data from M3 such as items, orders and warehouse details, and returns carrier, tracking and label information. Elemica's guide does not publish the exact M3 programs, so confirm the technical design during scoping.

What data moves

FromToDataWhen
Infor M3ProcessWeaverDelivery, ship-to, item weights and dimensionsDelivery released for shipping
ProcessWeaverCarrierShipment request and rate queryOperator or rule selects service
ProcessWeaverWarehouse printerShipping labels and manifestsShipment confirmed
ProcessWeaverInfor M3Carrier, tracking number and freight costLabel created or shipment closed
ProcessWeaverCustoms and carriersCustoms documentsInternational shipment confirmed

Setting it up

  1. 1Scope sites and carriersList distribution sites, carriers and services in use, and whether international shipments and customs documents are needed.
  2. 2Prepare M3 shipping dataConfirm item weights, dimensions, packaging, ship-to addresses and incoterms are maintained in M3.
  3. 3Configure the connectionHave Elemica and your M3 partner set up the connector, including how deliveries reach ProcessWeaver and how results return.
  4. 4Set carrier rulesDefine rules for carrier and service choice by weight, destination, customer and cost.
  5. 5Set up printingInstall label and manifest printers and test formats for each carrier.
  6. 6Pilot one siteShip real orders through the connector, compare freight cost and tracking in M3, then roll out.

What usually breaks

  • !Missing or inaccurate item weights and dimensions, causing wrong rates and carrier rejections.
  • !Address data in M3 not validated, leading to returned shipments.
  • !Carrier rules that differ by site, producing inconsistent service choice.
  • !Customs data such as commodity codes and country of origin missing from item master.
  • !Tracking numbers not returned to M3 so customer service cannot find them.
  • !Manifest close timing out of line with carrier pickup times.

A private AI layer across both systems

Rate and service review

A private assistant reading shipments and M3 orders can show where a cheaper compliant service existed, as analysis for a logistics manager.

Failed shipment triage

Explain why a shipment was rejected, such as bad address or missing weight, and propose the master data correction for approval.

Customs data checks

Flag international deliveries where item master data is incomplete before they reach the shipping dock.

Customer tracking questions

Let customer service ask where an order is and get the carrier status linked to the M3 delivery.

Try it here, free

Infor M3 AI Assistant Sizing and Value Calculator

Open full tool

Size the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for Infor M3.

When something else fits better

  • Infor Nexus Network TMS if you need freight beyond parcel and a network view.
  • Single-carrier shipping software if you use one or two carriers.
  • Carrier web portals with manual entry for very low volume.

Frequently asked questions

How many carriers does it support?

Elemica describes more than 460 carriers. Whether your specific carrier and service are available should be verified during evaluation, as coverage varies by region and service level.

Does it support M3 and CloudSuite?

Elemica's guide covers Infor M3 and Infor CloudSuite. The exact integration approach depends on your deployment, so ask for the technical design for your version before committing.

What documents does it produce?

Per Elemica, it handles labels, manifests and customs documents. Required customs data still has to be maintained in M3 or provided during shipping.

Is a TMS needed as well?

Not necessarily. Parcel shipping and a full transport management system overlap but differ. For complex freight, compare with a TMS; for parcel-heavy distribution this class of tool may be enough.

Pairing documented at elemica.com/guides-sheets/connected-shipping-workflows-for-infor-cloudsuite/ . ProcessWeaver multi-carrier shipping is a product of Elemica (ProcessWeaver); Netray is independent and not affiliated with either vendor.

Get Infor M3 alerts

Support and maintenance deadlines, release changes that affect Infor M3 sites, and new free Infor M3 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor M3: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor M3? Start with the Infor M3 guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Comparisons

Software