ABAP Code Review Checklist
A short, consistent review checklist catches most ABAP defects before they reach quality or production. This list focuses on the issues that actually cause incidents: database access in loops, missing authority checks, unchecked return codes and code that will not survive a move to S/4HANA.
0 of 34 items complete
11 critical items still open - these are the highest-risk gaps.
Database access and performance
Security and authorization
Error handling and robustness
Structure, readability and testing
Release and S/4HANA readiness
Count ticked items. Fix every unticked critical item before the transport moves forward. Below 80% ticked usually means the change needs another round.
Custom code health check
Optional: send us a summary of your ATC findings and we will give a plain opinion on where to start.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Open the change in the editor or ADT, run the ABAP Test Cockpit on the objects, and work through the groups with the author in the room or on a call. Tick items that pass and leave failed items unticked, then export the checklist as evidence for the transport. Items marked critical are those where a miss tends to cause a production incident, so they must be fixed before release rather than logged as technical debt.
Where ABAP defects come from
In practice most problems come from the same short list. Reads in loops cause slow jobs, missing sy-subrc checks cause wrong data to flow forward, absent authority checks create audit findings, and unchecked BAPI return tables cause documents that were never created. Static checks find some of these, but a person who knows the business process finds the rest. Combine automated ATC results with a human review of logic and data access.
S/4HANA readiness
Custom code moving to S/4HANA must account for changed data models, such as the material number extension, business partner replacing customer and vendor master, and removed or replaced tables listed in SAP's simplification list. Run the custom code migration checks to get the findings, then use review time to confirm that fixes are correct, not just silent. Prefer released APIs and CDS views over direct table access in new code.
Common mistakes
Reviews fail when they only check style, when reviewers see code without the functional context, or when criticals are waived under time pressure. Another is reviewing only the changed lines and missing the effect on callers. Keep the checklist short, run it every time, and track which items fail most often so your standards and training can target them.
Frequently Asked Questions
Does this replace the ABAP Test Cockpit?
No. ATC finds rule-based issues automatically and should run on every change. This checklist adds the human review of business logic, data access choices and risk, which tools cannot judge.
Who should review ABAP code?
A second developer who did not write the change, ideally with knowledge of the business process. For authorization or financial postings, include a functional consultant or key user to confirm the behaviour.
How long should a review take?
For a typical change of a few hundred lines, 30 to 60 minutes is realistic. Larger changes should be split. Rushed reviews that skip data access and error handling are the ones that miss the problems that matter.
What should I check first for performance?
Look for database access inside loops, missing WHERE clauses, SELECT of unneeded fields and repeated reads of the same data. Then measure with SAT or ST05 on realistic volumes, because development systems rarely show the problem.
If you have a large legacy custom code base, we can discuss how AI-assisted analysis could help prioritise what to review, rewrite or retire.
Related Tools
ABAP Naming Convention Template
A fill-in development standard that defines prefixes for variables, parameters, classes, DDIC objects, programs and CDS views.
SAPABAP SELECT Statement Generator
Fill in table, fields and a WHERE condition and get modern ABAP Open SQL: SELECT INTO TABLE, SELECT SINGLE and a safe FOR ALL ENTRIES pattern.
SAPABAP Internal Table Declaration Generator
Choose table kind, key and line type and get the DATA declaration, a local TYPES version and the common table operations.
SAPBAPI_PO_CREATE1 Call Skeleton Generator
Enter vendor, plant, material and quantity and get a complete BAPI_PO_CREATE1 call with the matching X structures, error handling and BAPI_TRANSACTION_COMMIT.
More SAP tools
See all- SAP Sales Document Types Reference
- SAP Pricing Procedure Design Worksheet
- SAP Item Category Determination Reference
- SAP Delivery Block Reasons Template
- SAP Credit Management Checklist
- SAP Output Determination Checklist
- SAP Billing Types Reference
- SAP Incompletion Log Checklist
- SAP SD Tables Reference (VBAK, VBAP, LIKP, VBRK and More)
New to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.
Keep exploring
Free tools
- ABAP Performance Tuning ChecklistA checklist of database, internal table and memory checks to run on slow ABAP reports before they reach production.
- ABAP Transport Request Release ChecklistA pre-release checklist for ABAP transport requests that catches missing objects, untested code and import order problems.
- ABAP Technical Design Document TemplateA technical specification skeleton for ABAP developers: repository objects, data access, error handling, performance and testing.
ERP fixes and how-tos
- SAP MM BAPI for PO Create and Change: BAPI_PO_CREATE1 and BAPI_PO_CHANGEHow to use BAPI_PO_CREATE1 and BAPI_PO_CHANGE: header, item and schedule structures, the X-structures, error handling in RETURN and the commit step.
- SAP S/4HANA upgrade steps: a runbook for manufacturersStep-by-step SAP S/4HANA upgrade and conversion runbook: readiness check, Maintenance Planner, custom code, SUM, testing and cutover for manufacturers.
- How to Run an ERP User Access Review (Quarterly Checklist)How an IT manager runs an ERP user access review: pull the user and role list, get owner sign-off, test segregation of duties, and keep audit evidence.
Runs with your ERP
- Loftware with SAP ECC and S/4HANA: label design and printing from SAP transactionsHow Loftware and the NiceLabel ABAP package drive labels from SAP ECC and S/4HANA, including SAP GLM Plus, data flows, setup steps and pitfalls to avoid.
- ShipERP with SAP ECC: native parcel shipping inside SAPShipERP is an SAP-native ABAP add-on for UPS, FedEx, DHL and USPS rate shopping, labels and tracking in SAP ECC and S/4HANA. Flows, setup and pitfalls.
Guides
- AI-Powered Code Review for ERP CustomizationsReview ERP customizations with AI agents detecting code quality issues, upgrade risks, security vulnerabilities, and performance problems in custom ERP code.
- Security Review Checklist for Enterprise AI AgentsA security review checklist for enterprise AI agents: data residency, identity and access, prompt injection defense, logging, and vendor risk for manufacturers.
AI on your ERP
- AI for ABAP Development: A Private Code LLM That Knows Your Z ObjectsUsing an LLM for ABAP on ECC and S/4HANA: what SAP's own ABAP AI covers, where a private code model helps, and how to keep transports governed.
- Get AI Value From SAP ECC Now, and Use It to De-Risk the Move to S/4HANASAP ECC 6.0 mainstream maintenance ends in 2027. Add AI value on ECC now, using its existing BAPIs and IDocs, and use it to de-risk the S/4HANA migration.