Aerospace & DefenseFree referencePDF, Excel, Word exportAerospace

Aerospace Alloy AMS Specification Reference (Common Grades)

Buyers and receiving inspectors constantly translate between an alloy name and the AMS specification that governs the purchased form. This table lists the pairings that appear most often on aerospace drawings.

Download:
Alloy / conditionProduct formAMS specificationFamily
2024-T3
Sheet and plate, clad or bare
AMS 4037
Aluminum
6061-T6
Sheet and plate
AMS 4027
Aluminum
6061-T6
Bar, rod and wire
AMS 4117
Aluminum
7075-T6
Sheet and plate
AMS 4045
Aluminum
7075-T651
Plate
AMS 4045
Aluminum
7075-T73
Extrusion
AMS 4166
Aluminum
Ti-6Al-4V annealed
Sheet, strip and plate
AMS 4911
Titanium
Ti-6Al-4V annealed
Bar and forgings
AMS 4928
Titanium
17-4PH (H1025 and others)
Bar, forgings and rings
AMS 5643
Stainless steel
15-5PH
Bar, forgings and rings
AMS 5659
Stainless steel
304 / 304L
Sheet and strip
AMS 5513
Stainless steel
304
Bar
AMS 5639
Stainless steel
4130
Sheet, strip and plate
AMS 6350
Low alloy steel
4340
Bars, forgings and tubing
AMS 6414
Low alloy steel
Inconel 718
Bar, forgings and rings
AMS 5662
Nickel alloy
Inconel 718 (solution treated)
Sheet, strip and plate
AMS 5596
Nickel alloy
Inconel 625
Bar, forgings and rings
AMS 5666
Nickel alloy
Inconel 625
Sheet, strip and plate
AMS 5599
Nickel alloy
Waspaloy
Bar and forgings
AMS 5706
Nickel alloy

Specification numbers are widely used references. Revision letters, product form and condition must be confirmed against the current SAE AMS document and the drawing before purchase.

Link material specs to your ERP material master

Optional: we can discuss mapping specification and certificate data into your ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the lookup

Search by alloy (for example 7075), by product form (plate, bar, sheet) or by AMS number. The result tells you which specification family is commonly cited. Use it to sanity check a purchase order line, to prepare receiving inspection plans, or to build a material master cross reference in your ERP. Export to Excel for a sortable copy.

  • Match alloy, temper and form together
  • Confirm the revision letter on the drawing
  • Check certification requirements on the PO

What an AMS specification controls

An AMS document sets chemical composition, mechanical properties, heat treatment, testing and quality requirements for a defined product form. A mill certificate should reference the specification and show actual test values. The same alloy purchased as sheet and as bar sits under different documents, which is why form matters.

Receiving and traceability

AS9100 clause 8.5.2 expects traceability from material receipt through to the finished part. Record the heat or lot number, the certification reference and the specification revision on the receiving transaction. Where counterfeit risk applies, verify the certificate against the distributor chain and test material when the risk assessment calls for it.

Common mistakes

Accepting a certificate that cites the wrong form, ignoring temper differences, and treating a similar commercial grade as equivalent are the common errors. Equivalence needs engineering approval, not a buyer decision.

Frequently Asked Questions

Is AMS the only aerospace material standard?

No. Many programs also cite ASTM, MIL, AMS-QQ or customer proprietary material specifications. The drawing or purchase order decides which one applies.

Can I substitute a similar alloy?

Only with engineering and customer approval where required. Compositions and heat treatments that look similar can differ in properties that matter for certification.

Do the AMS numbers ever change?

Numbers are stable but revision letters change and some specifications are cancelled or superseded, so check the current SAE document before buying.

What should the mill cert show?

Specification and revision, heat or lot number, chemical analysis, mechanical test results, and the manufacturer identity, as the purchase order and specification require.

We can help link your material master, specification revision and certificates inside the ERP so receiving checks happen automatically.