AS9102 Form 2 Product Accountability Template (Materials, Special Processes, Functional Testing)
AS9102 Form 2 is where a first article report proves the materials, special processes and functional tests behind the part. This template gives you the fields in a clean layout so you can fill, review and export without rebuilding a spreadsheet each time.
Fill in
AS9102 Form 2 Product Accountability Template
Product Accountability: Materials, Special Processes and Functional Testing
Part number: PN-48213-02 Part name: Actuator Housing Serial or lot: FAI-0007 FAI report number: FAI-2026-0142
Raw Materials and Purchased Parts
| Material or part | Specification | Supplier | Certificate or lot | Result |
|---|---|---|---|---|
| Primary material | AMS 4027 Aluminum Alloy 6061-T651 plate | Northline Metals Inc | Cert 88213 / Lot A7731 | Conforms |
Special Processes
| Process | Specification | Supplier | Approval status | Certificate no. |
|---|---|---|---|---|
| Anodize | MIL-A-8625 Type II Class 1 | Apex Finishing LLC | Nadcap accredited for chemical processing, valid to 2027-03-31 | |
Functional Testing
Test performed: Leak test at 1.5x operating pressure, 30 second hold, no visible leakage.
Result: Accepted
Sign-off
Prepared by: J. Rivera, Quality Engineer Date: 2026-10-20
Field structure follows the purpose of AS9102 Form 2. This is a working template, not a reproduction of the standard. Always confirm the required layout and any customer-specific additions against your current copy of AS9102 and the purchase order.
Pull FAI data from your ERP
Optional: we can review how material lots and process approvals could feed your FAI package automatically.
Optional. The tool and every export work without this. No spam.
How to use this template
Enter the part identification at the top, then record each raw material, purchased component and special process used on the first article. Add the certificate or lot references that support each line. Use the table rows for extra materials or processes, then export to PDF for the FAI package or to Word if the customer wants edits. Keep the certificates themselves attached to the package as evidence.
- One row per material or purchased part
- One row per special process, including sub-tier suppliers
- Reference the cert number, not just the supplier name
- Record functional test acceptance criteria and the result
What Form 2 is meant to prove
Form 1 identifies the part and Form 3 accounts for every drawing characteristic. Form 2 sits between them and answers a different question: did the right material go through the right approved processes, and did the part work when tested? An auditor or customer reviewer should be able to trace each line to a certificate and an approved source without asking you for more paperwork.
Special process approval details
For processes such as anodize, heat treat, plating, welding and NDT, record the specification and the supplier approval status. Many primes require Nadcap accreditation or a direct customer approval for the process in question, so capture the scope and expiry date you verified. If the supplier's approval lapsed before the work was done, that is a nonconformance to raise before the report is released.
Common mistakes
Most Form 2 rejections come from missing traceability rather than bad parts. Typical problems include a certificate that names a different specification revision, a process line with no supplier approval evidence, a functional test with no stated acceptance criteria, and sub-tier processes left off because the prime supplier did not mention them. Check each row against the purchase order flow-down before you sign.
Frequently Asked Questions
Is this the official AS9102 form?
No. It is a working template that follows the structure and purpose of Form 2. AS9102 is published by the IAQG and distributed through SAE and national bodies, so confirm the required format and your customer's requirements against the current standard.
Do I need Form 2 for every first article?
Form 2 applies when the part uses designed or specified materials, special processes or functional testing. If a part has none of these, the form can be marked not applicable, but check with your customer because some require the form regardless.
Can I list several materials and processes?
Yes. Add as many rows as you need. Each material, purchased part, special process and test should have its own line with its own certificate reference so reviewers can trace it.
Does the output include my data on the server?
The template runs in your browser and exports directly, so what you type stays on your machine unless you choose to contact us.
If your ERP already holds material lots, supplier approvals and routing steps, Netray can help pull them into this form automatically instead of retyping them.
Related Tools
Nadcap Special Process Supplier Approval Tracker
Editable worksheet for tracking special process suppliers, their Nadcap or customer approvals, scope and days to expiry.
Aerospace & DefenseAerospace Delta FAI Trigger Worksheet
Score each change for design, process, supplier, tooling and location impact to decide whether a full or partial delta FAI is needed.
Quality & InspectionAerospace Supplier Corrective Action Request Template
Issue a SCAR with defect details, required containment, root cause and effectiveness verification fields, then export to PDF or Word.
Aerospace & DefenseFirst Article Inspection (AS9102) Checklist
A 30-point checklist for complete, first-pass-acceptable AS9102 FAIs - planning, Form 1/2/3 completeness, characteristic accountability, and the delta FAI triggers teams miss.
More Aerospace & Defense tools
See all- AS9102 Form 1 Part Number Accountability Template
- AS9102 Form 3 Characteristic Accountability Worksheet
- FOD Prevention Program Checklist
- Aerospace Key Characteristics Worksheet
- Aerospace Material Review Board Disposition Template
- Aerospace Supplier OTD and Quality Rating Calculator
- Aerospace Delta FAI Cost Savings Calculator
- Aerospace Internal Audit Programme Planner Worksheet
- Aerospace MRB Nonconformance Disposition Record Template
Keep exploring
Free tools
- AS9102 Form 1 Part Number Accountability TemplateGenerate the Form 1 header page of an AS9102 first article inspection report with part, drawing, FAI type and approval blocks.
- AS9102 Form 3 Characteristic Accountability WorksheetRecord each ballooned characteristic with nominal, tolerance, actual and automatic pass or fail, then export to Excel.
- First Article Inspection Report Template (AS9102, Excel)A free FAI report built on the AS9102 structure: part accountability, product accountability and characteristic accountability with ballooning guidance, exportable to Excel.
Guides
- How to Price First Article Inspection (AS9102) in an Aerospace QuoteHow to price AS9102 first article inspection in aerospace quotes: ballooning, CMM programming, outside lab, process certs and delta FAI, without losing margin.
- How to Set Up AS9100 Compliance in SyteLineComprehensive guide to configuring Infor SyteLine for AS9100 aerospace quality management compliance. Set up first article inspection, special processes, key characteristics, and traceability requirements.